Professional Documents
Culture Documents
1
As we are performing PUTT, ZCAL is of no use and will just set to OFF.
Substation Automation & Protection Training
SA.T. Training SEP-602A 2007-09-13 Page 1 of 8
ABB AB
Training Course SEP-602A EXERCISE 5
Power Automation & Substation
Lima - Per
Distance protection settings (ZM, PHS and SOTF) are according to previous exercise.
SOTF function should be set to Automatically detect the CB closing action.
NOTHING should be artificially set OFF.
2. Configure the carrier receive signal to a proper Binary Input by using SMT
In this exercise the carrier receive signal is supposed to be received by the IED via a
binary input. Open SMT and connect a suitable binary input to the virtual input ZM CR
representing the carrier receive signal2:
3. Enter correct settings for ZCOM and ZCAL and download them in the IED
Correct settings for ZCOM to perform PUTT scheme are the followings:
2
If you want you can also turn one LED on the HMI when the signal is received, as it is done in the picture
with LED N. 7 (the first of the yellow ones).
Substation Automation & Protection Training
SA.T. Training SEP-602A 2007-09-13 Page 2 of 8
ABB AB
Training Course SEP-602A EXERCISE 5
Power Automation & Substation
Lima - Per
3
Coordination Time is used in blocking schemes. In permissive schemes like PUTT or POTT, there is no
need to wait. As soon as the carrier is received and the local fault detection is achieved (ZM02-START) the
trip command can be issued.
Substation Automation & Protection Training
SA.T. Training SEP-602A 2007-09-13 Page 3 of 8
ABB AB
Training Course SEP-602A EXERCISE 5
Power Automation & Substation
Lima - Per
4
Consider that the IED can store up to 100 disturbances, so it may be difficult to find (or recognize) exactly
the last disturbances and it can happen that you upload the wrong disturbance. To save time it is better to
avoid confusion and delete the disturbances at the beginning.
Substation Automation & Protection Training
SA.T. Training SEP-602A 2007-09-13 Page 4 of 8
ABB AB
Training Course SEP-602A EXERCISE 5
Power Automation & Substation
Lima - Per
Inject the sequence and verify in the disturbance recorder that the relay tripped by
ZCOM function!
Remove the carrier receive signal from the IED (just remove the connection IED test
set). Inject the same sequence, verify time delayed trip by ZM02 timer:
Manually and steadily activate ONLY the binary input corresponding to Carrier
Receive signal. Inject NO FAULT. Verify that the relay will not trip.
We can see from OnLine / Debug in CAP 531 that the carrier IS received:
5. Inject a fault in ZM01 and verify that the IED sends the carrier signal.