Complete Testing 0.60% 0% 20 days Wed 5/30/18 Tue 6/19/18 298 Completion Of Electrical Works for tank 0% 0 days Tue 6/19/18 Tue 6/19/18 298,299 T-17,T-18 Instrumentation Works 0% 203 days Tue 1/2/18 Tue 7/24/18 For Tank T-15, T-16 0% 35 days Tue 1/2/18 Tue 2/6/18 Cable Laying & installation Of Panels of 0.80% 0% 15 days Tue 1/2/18 Wed 1/17/18 294SS Rim Seal Protection Loop Checking 0.60% 0% 10 days Wed 1/17/18 Sat 1/27/18 303 Earthing of Tanks & 0.60% 0% 10 days Sat 1/27/18 Tue 2/6/18 304 Connection with Grid Completion Of Instrumentation Works 0% 0 days Tue 2/6/18 Tue 2/6/18 303,304,305 for Tank T-15,T-16 For Tank T-17, T-18 0% 35 days Tue 6/19/18 Tue 7/24/18 Cable Laying & installation Of Panels of 0.80% 0% 15 days Tue 6/19/18 Wed 7/4/18 299 Rim Seal Protection