You are on page 1of 43

Taameer Investment. S.A.O.

Centro Hotel Sohar Enabling Works Package

BILLS OF QUANTITIES

CONTENTS

BILLNo.

- PricingPreambles

- GeneralSummary

1 PreliminariesandGeneralRequirements

2 SiteWorks

3 Dayworks
PRICING PREAMBLES
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

GENERALLY

B UponawardofContract,theBillsofQuantitiesshallbeusedsolelyforevaluationofprogresspaymentsduetothe
Contractor,andasascheduleofratesforchanges.

C TheBillsofQuantitiesherein,includingallnotesandinstructions,shallformanintegralpartoftheContract
Documents.However,thedescriptionscontainedintheBillsofQuantitiesforeachitemarenotnecessarily
complete.

D TheContractoriscautionedtofamiliarisehimselfwiththefullcontentofotherDocumentsincludingtheDrawings
andSpecificationsoranyotherinformationthatcanbereasonablyinferredfromanyofthemandallobligations
containedinthedocumentsshallbeincludedinthetenderpricesandlumpsumtenderprice,evenifspecific
itemsrelatingtothemarenotlistedintheBillsofQuantities.

E Drawings,Specifications,ConditionsofContractandBillsofQuantitiesandallotherDocumentsare
complementaryandifanyitemisincludedinanyofthem,itshallbedeemedincludedinall.

F TheContractor'sbidfortheentireworkshallprovideforsupervisionofanyoralltradesthatisnotintendedtobe
performedwithhisownforces.Noextracompensationforservices,asaGeneralContractorwillbepaid.

G TheContractorisrequiredtoprovidewithhisTenderthreecopies(1originalandtwocopies)oftheBillsof
Quantitiesfullypricedoutinwaterproofinkwithsummationsheetsproperlycompleted.

H AmendmentshallnotbemadetotheseBillsofQuantitieswithouttheauthority,inwriting,oftheEngineer.

J TheContractorshallnotusetheseBillsofQuantitiesasthebasisforaconstructionprogrammeorforthe
purposeoforderingmaterialsorarrangingSub-Contracts,betheyNominatedorotherwise.Thereferencesfor
theseactivitiesshallbethedrawing,specificationsandinstructionsissuedbytheEngineer.

Page:PP/1
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

GENERALLY (Cont'd)

FormatofDescriptions

A Inadditiontocommonabbreviationsthefollowinghavebeenadopted:

POM(I)-PrinciplesofMeasurement(International)forWorksofConstructiondatedJune1979and
publishedbytheRoyalInstitutionofCharteredSurveyors,London.

m-Metre

m2-SquareMetre

m3-CubicMetre

No-Number

Kg-Kilograms

ha-Hectare

KN-KiloNewton

ITEM-Compositeitem

hr-hour

RO-RiyalsOmani

METHOD OF MEASUREMENT

B TheseBillsofQuantitieshavebeenmeasuredgenerallyinaccordancewiththeRulesofPOM(I).Inanycasein
theBillsofQuantitieswherethemethoddiffersthenthemethodexpressedmustbeacceptedandmeasuredin
accordancetherewith.

C ItemsinthePreambleSectionoftheseBillsofQuantitiesaredeemedtoqualifyandtoformpartofevery
descriptionofmeasuredworktowhichtheyreferincludingcompositedescriptions.

D Allmeasurementsarenetandtheratesshallincludeforalllaps,waste,workingspaceandtradeortraditional
allowances.

Page:PP/2
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING

A TheContractor'sunitratesaretobefullyinclusivevalueoftheworkdescribedandmustincludeallrelatedwork,
accessoryorconsumablematerials,incidentallabour,supervision,administration,tools,constructionequipment,
overheadandprofitandallcostsandexpenseswhichmayberequiredinandforthecompletionofthework
describedtogetherwithallcostsandexpensesincomplyingwithallgeneralrisks,liabilitiesandobligationsset
forthorimpliedintheDrawings,SpecificationsandConditionsofContract.

B Itemswhereunitratesareapplicableshouldnotbepricedaslumpsum.

C Wheretheword"allow"isused,thecostoftheitemsshallbetheresponsibilityoftheContractor.

D Wheretheword"item"isused,thecostoftheitemsshallbetheresponsibilityoftheContractor.

E Theamountssetagainstanyitemsofprofitshallincludeforallcostsinconnectionwiththelettersofcredit,bank
charges,interestchargesandinsuranceafterthematerialscomeunderthecontroloftheContractor.

F NovariationwillbeallowedforanyerrorinthecomputationoftheTenderdiscoveredafterdateofissueofletter
ofacceptanceofthetenderandawardoftheContract.

Definitions
G "Pricesalsotoinclude";itemsunderthisheadingfallintotwocategories:

(i)Thosewhicharedeemedtobeincludedindescriptionsand,therefore,inprices.

(ii)ThoseforwhichtheContractorshallallowforinhisprices.

H "Falls","Slopes","Weathered:inclinedfromthehorizontalinoneplane

J "CrossFalls","CrossSlopes","CrossWeathered":inclinationfromthehorizontalinmorethanoneplane.

Fix Only

K Theexpression"fixonly"usedintheseBillsofQuantitiesmeansthattheContractorshallprovidethefollowing
facilities:

(i)Unloading,storing,distributingandhoistinggoodsandmaterials.

(ii)Supplyingfullsizetemplates.

(iii)Givingandmarkingdimensionsandtakingresponsibilityfortheiraccuracy.

(iv)Gettingin,protecting,handling,distributionandplacinginposition.

(v)Assemblingasrequired.

(vi)Casingupandprotection,includingclearingawayprotectiononcompletionoftheworks.

Page:PP/3
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (Cont'd)

FixOnly(Cont'd)

(vii)Fullcostofreplacementofanyitemswhicharedamaged,broken,lostorstolenaftertheacceptanceofthe
itemsfromthesupplierorclientanduntilhandingoverthecompleteworks.

(viii)Othernecessaryandusualfacilitiesanddocumentation.

(ii)ThoseforwhichtheContractorshallallowforinhisprices.

A "Falls","Slopes","Weathered:inclinedfromthehorizontalinoneplane

B "CrossFalls","CrossSlopes","CrossWeathered":inclinationfromthehorizontalinmorethanoneplane.

Fix Only

C Theexpression"fixonly"usedintheseBillsofQuantitiesmeansthattheContractorshallprovidethefollowing
facilities:

(i)Unloading,storing,distributingandhoistinggoodsandmaterials.

(ii)Supplyingfullsizetemplates.

(iii)Givingandmarkingdimensionsandtakingresponsibilityfortheiraccuracy.

(iv)Gettingin,protecting,handling,distributionandplacinginposition.

(v)Assemblingasrequired.

(vi)Casingupandprotection,includingclearingawayprotectiononcompletionoftheworks.

(vii)Fullcostofreplacementofanyitemswhicharedamaged,broken,lostorstolenaftertheacceptanceofthe
itemsfromthesupplierorclientanduntilhandingoverthecompleteworks.

(viii)Othernecessaryandusualfacilitiesanddocumentation.

Page:PP/4
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

SupplyOnly

A Theexpression"supplyonly"usedintheseBillsofQuantitiesmeansthattheContractoristoincludeforall
liabilitiesandobligationsarisingoutoftheContractexceptfixinginposition.

B AnySub-contractorsorSupplierswhichtheContractorproposestousefortheworksaresubjecttotheapproval
oftheEngineerandEmployer.AnySub-contractororSupplierwhohasnotbeenapprovedbytheEngineerand
Employershallnotbeusedinconnectionwiththecarryingoutoftheworks.

C TheContractorshouldascertainfromSub-contractorsandSuppliersbeforetheworkisputinhandparticularof
positionsinwhichchases,holes,mortisesandthelikewillberequiredtobeformedorleft.Noclaimfortheextra
costsofcuttingawayworkalreadybuiltduetotheContractor'sfailuretoascertaintheseparticularswillbe
admitted.

D TheContractorshallallowforanyadditionalcostsincurredduetoSub-Contractorsworkingdifferenthoursfrom
andextendedhourstothoseworkedbytheContractor.

E Theword"attendance"meansthefollowing:

AttendancestobeprovidedbytheMainContractortoallSub-ContractorsandNominatedSub-Contractors
TheMainContractorshallberesponsibleforproviding,includingbutnotlimitedto,thefollowingattendances:

(I)UseofMainContractor'sadministrativearrangements.

(ii)UseofConstructionalPlant.

(iii)UseofMainContractor'smessroom,sanitaryandwelfarefacilities.

(iv)Co-ordinationandschedulingofallworksrelatedtoeachSub-ContractandNominatedSub-Contract.

(v)Useofstandingscaffolding

(vi)Useoftemporaryworksincludingwaterandelectricity.

(vii)Supplyingfullsizesettingouttemplates.

(viii)Givingandmarkingdimensionsandtakingresponsibilityfortheiraccuracy.

(ix)SpaceforSub-Contractorofficesandstores,betheyDomesticorNominated.

(x)Providingworkspace

Page:PP/5
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

A AttendancestobeprovidedbytheMainContractortoallSub-ContractorsandNominatedSub-ContractorsCont'd

(xi)OffloadingallSub-Contractors'orSuppliers'materialsandplacinginstores,betheyDomesticorNominated.

(xii)ClearingawayallandanyrubbishbeitgeneratedbyMainContractor,NominatedorDomestic
Subcontractors.

(xiii)Othernecessaryandusualfacilities,documentation,generalintergradesattendances,labourand
assistance.

B AttendancestobeprovidedbytheSub-ContractororNominatedSub-Contractor
TheSub-ContractororNominatedSub-Contractorshallberesponsibleforproviding,includingbutnotlimitedto,
thefollowingattendances:-

(i)Allspecialscaffoldingrequiredbyhimintheexecutionofhisworks.

(ii)Takingfromstores,distributing,hoistingandplacinginposition,allitemsofplant,equipmentandmaterials
requiredbyhimintheexecutionofhisworks.

(iii)Alllabour,plantetc(otherthanincludedinAttendancestobeprovidedbytheMainContractor).

(iv)Siteofficesandstoresrequiredbyhimfortheexecutionofhisworks.

(v)Obtainingsecuritypassesforaccessofworkpeopletothesite.

vi)Offloadingfrommaterialdeliveryvehicleshismaterials,placingintemporarystoreson-site,distributing,
hoistingandplacinginposition.

PC and Provisional Sums

C Forallworkexecuted,orgoods,materials,plantorservicessuppliedbyanyNominatedSub-Contractoror
NominatedSupplier,theContractorshallbeentitledto:-

(a)TheactualpricepaidorduetobepaidbytheContractor,ontheinstructionsoftheEngineer.

(b)inrespectofallothercharges,profitandattendance,asumbeingapercentagerateoftheactualpricepaid
orduetobepaid.TheContractorshallinsertthepercentageorsumasapplicablerequiredforallothercharges,
profitandattendanceagainsteachitemintheBillofProvisionalSums.

(c)ShouldtheContractorbeawardedworkunderanyPCsumforwhichhehastendered,theamountforprofit
andattendanceallowedbyhimagainstthePCsumshallbededucted.

(d)ShouldworkstatedasPCitembedeletedfromtheContractandtheClientchoosestocarryoutsuchworkas
adirectcontractthentheallowancefor"profitandattendance"shallbedeleted,anyattendancerequiredtobe
providedbytheContractorshallbenegotiatedwiththeClientasavariationinaccordancewiththeTermsofthe
Contract.

Page:PP/6
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

Builders Work

A WithintheBillsforProvisionalSumstheContractoristoallowforallthebuildersworkrequiredinconnectionwith
thevariousworkelementscoveredbyProvisionalSumsasnoted.Toassessthebuilder'sworkrequired,the
ContractormayreviewthedrawingsrelatedtotheseWorksattheofficesoftheEngineer.

B AllotherChargesOverheadandProfit

AllotherChargesandProfitincludesProfit,Overheads,Facilities,AssistancesandAttendancesinconnection
withtheexpenditureofProvisionalSumsinfavourofSub-Contractors.

C GeneralandSpecialAttendances

TheexpressionGeneralAttendancesshallmean,butisnotlimitedtothefollowing:

a)TheuseoftheContractor'sadministrativefacilities.

b)Theuseofgeneralconstructionplant.

c)TheuseoftheContractor'sfacilities,includingmessrooms,sanitaryaccommodationandwelfarefacilities.

d)Theuseoftemporaryworks.

e)SpaceforSub-Contractorsoffices,storesandlaydownareas.

f)Theclearingawayofallrubbish,wasteanddebrisonaregularbasis.

g)Theprovisionandremovalofgeneralscaffoldingforgeneraluse.

h)Unloading,distributing,hoistingorloweringtotherespectivefloorlevels,andplacinginsuitablepositionsfor
theSub-Contractorallplant,machineryortheliketobeinstalledbytheSub-Contractor.

i)TheprovisionofelectricalpowerbyMainContractorfortheSub-Contractor'sworks,includingalllightingand3-
phaseorheavysupplies,whichmayberequiredforpurposesoftestingandcommissioning.

j)TheprovisionofwaterfortheSub-Contractor'sworks,includingtherequirementsfortestingand
commissioningandsubsequentremovalofwater.

k)TheprovisionofallfuelnecessaryforthetestingandcommissioningoftheSub-Contractworks.

l)Thegeneralco-ordinationandintegrationofallSub-ContractworksintotheGeneralProgramme.

m)AscertainingfulldetailsofanyworktobeexecutedbyotherSub-Contractor'sinconnectionwiththeSub-
Contractworksandarrangingforsuchworktobeexecutedatthecorrecttime.

n)Theprovisionofalltemporaryaccessalreadyfixedorplacedinpositiononthesitefortheuseofworkmen
andthedeliveryofmaterials.

Page:PP/7
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

A GeneralandSpecialAttendances(Cont'd)

o)ProtectionoftheSub-ContractworksfromthetimetheSub-ContractorcompletestheworkuntiltheWorksas
awholeoranySectionsthereofarehandedovertotheEmployer.

p)ThecleaningofallSub-Contractworks,aspartofthefinalcleanoperationatsubstantialcompletionofthe
WorksasaWholeoranySectionthereof.

q)Thedesignco-ordinationandnecessaryliaisonrelatedthereof.

r)TheprogrammingoftheSub-ContractWorksandthenecessaryco-ordinationtocomplywiththeContractor's
overallprogramme.

s)Supplyingfullsizesettingouttemplatesandgivingandmarkingdimensionsandtakingresponsibilityfortheir
accuracy.

t)Obtaininganynecessarysecuritypasses,accessapprovals,identitycardsandthelikeforallSub-Contractor's
personnel.

B TheexpressionGeneralAttendancesshallmean,butisnotlimitedtothefollowing:

a)Theprovisionofallspecialistsscaffolding.

b)Theprovisionofallspecialistlifting,hoistingequipmentandcrainage.

c)Cutting,ChasingandMakingGood.

Builder'sWorkinConnection

C Theexpression"Builder'sWork"shallmeanallancillaryworkcarriedoutbytheContractorinconnectionwithall
Sub-Contractworksandinstallations.

D Thedrilling,cuttingorleavingofholesoraperturesthroughstructuralfloors,walls,beams,etc.shallbeavoided,
butwherethisbecomesanecessity,theContractormustobtainthewrittenapprovaloftheEngineerbeforethe
workisputinhand.

E TheContractorshallallowforallBuilder'sWorkInConnectionwiththeinstallationwhichshouldincludebutisnot
limitedtothefollowing:

a)FixonlyandinstallallinsertsandanyotheranchoredmaterialsrequiredfortheWorks,whichrequiretobe
embeddedinthebuildingstructureandblockwork.TheseinsertsaretobeprovidedbytheSub-Contractortothe
Contractor.

b)Drilling,cuttingorleavingholesforpipes,ductsandthelikethroughwalls,floors,partitions,etc.and
subsequentlymakinggood/waterproofingwherenecessary.

Page:PP/8
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

Builder'sWorkinConnection(Cont'd)

c)Cuttingandpinningendsofsupportsforpipes,equipment,appliances,fittingsandtheliketowalls,floors,
partitions,soffits,etc.andmakinggood.

d)Cuttingorleavingmortises,sinking,etc.forholdingdownbolts,brackets,supportsandthelikeandgrouting
in.

e)Cuttingchasesforpipes,conduitsandthelikeinwalls,floors,partitions,etc.andsubsequentmakinggood.

f)Cuttingandfittingsaround,boringholesthroughandmakinggoodoffinishinguptopipes,ducts,fans,
supports,bracketsandthelike.

g)Theconstructionofconcrete,blockand/ortimberducts.

h)Theformationofductswithinconcreteslabs,togetherwithaccesscoversandframes.

i)Thebuildingoftimberframes,panelsanddoors,includingironmongery,togiveaccesstopipes,ducts,
equipmentandthelike.

j)Theformationofconcretebases,plinths,etc.forplantandequipment,includinganyanti-vibrationpads.

k)ThewaterproofingofallexternalductworktotheEngineer'sapproval.

l)Makinggoodfinishesaftersecondfixinstallation.

m)Secondarysteelframingnecessaryforsupportofplant,pipework,lifts,ductworkandthelike.

n)Concreteencasementtodrainagepipesandfittingsbelowslabongrade.

o)Elevatorliftingbeams,supportsandothernecessaryBuilder'sWork.

p)Firestoppingaroundservices.

q)Cuttingandmakinggoodopeningsinfalseceilings,bulkheads,wallsforgrilles,diffusers,luminaries,sprinkler
heads,loudspeakersandthelike.

r)'Builder'sWork'willincludealltheabove,butitshouldbenotedthatthislistisnotintendedtobeexhaustive
andeverythingnecessarywillbedeemedtobeincluded.

s)TheContractorisreferredtotheStructuralDrawingsforfurtherinformation.TheContractorshallallowforany
plinthsorbasesrequiredforMEPequipmentinstallations.

t)Builder'sWorkshallincludeforallpenetrationsthroughconcretesurfacesforMEPEquipment,including(but
notlimitedto)stairpressurisationfans,ventilationopeningsthroughskylightupstands,firebarriersealsas
required,andthelike.

Page:PP/9
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION A - PRELIMINARIES

A PaymentfortheestablishmentoftheitemssiteofficeandfacilitieswillbeLumpSumwhichwillbemadeonlyafter
thecompletionofallfacilities.BreakdownofallLumpSumamountstobesubmittedtogetherwiththeTender
Submission.

B Paymentforthemaintenanceofsiteofficeandfacilitiesitemswillbeinmonthlyinstalments.

C PaymentfortheremovalofsiteofficeandfacilitiesitemswillbebyLumpSumwhichwillbemadeonlyafterthe
completionoftheirremoval.TheremovaloftheSiteOfficefortheEngineershallbeonemonthafterthe
completionoftheWorks.

D Paymentforcontractorssupervisionandthelike,billitemsshallbeinmonthlyinstalments.

E Instalmentscanbesuspended,reducedordeletedfromanyContractPayment,if,intheopinionoftheEngineer,
theContractorisnotfulfillinghisobligations.

F TherateinsertedforGeneralProtectionofthesiteshallincludeforthecosttomaintainaccesstoareasadjacent
totheworksite.

G Theitemfortrafficsafetyandcontrolshallincludethecostofalltemporarytrafficdiversionsandtraffic
managementnecessarytocompletetheworks.Theitemshallincludebutnotlimitedtoforliaisonwiththelocal
authoritiestoconfirmtheirrequirementsforsafety.

H Temporaryworks,diversions,sitecleaning,etc,andotheritemsnototherwisecoveredinthispreambleor
otherwisedetailedintheBillsofQuantitieswillbecostrelateditemsandwillbepaidasapercentageofwork
completedtototalvalueofwork.

J Paymentfortheestablishmentofsurveyingequipmentwillbelumpsumanditwillbemadeonlyafterthedelivery
ofalltheequipmentspecified.Paymentforitemsmaintainedwillbeinmonthlyinstalments.

K PaymentforassistingEngineershallbeinmonthlyinstalmentsandisdeemedtocoverallcostsinproviding
assistancetotheEngineerbytheContractorasstatedintheContract.

L PaymentforProjectSignBoardsshallincludeforerection,maintenance,removalwithinonemonthofcompletion
andreinstatementofgroundtoitsoriginalstate.

M PaymentforprogressphotographswillbebysetofmonthlyprogressphotographsasdefinedintheSpecification.

N Paymentforconditionsofcontractwillbebymonthlyinstalmentsandshallcoverallcostsandexpensesincluding
overheadandprofitsincurredbytheContractorincarryingouttherequirementsoftheConditionsofContractnot
otherwiseincludedintheBillofQuantities.Breakdownofalllumpsumamountstobesubmittedtogetherwiththe
TenderSubmission.

Page:PP/10
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION A - PRELIMINARIES (CONT'D)

A Itemsforwhichthemeasurementunitisindays,suchitemsshallbemeasuredfortheactualperiodforwhich
facilities,services,etc.,areprovidedinaccordancewiththeconstructionprogramme.Measurementwill
commenceonlyafterthecompletionoftheMobilisationperiodandonthedayasapprovedbytheEngineerin
agreementforthefacilities,services,etc.,whenfullyprovided.

B Theseinstalmentscanbesuspended,reducedordeletedfromanyContractPayment,ifintheopinionofthe
Engineer,theContractorisnotfulfillinghisobligations.

SECTION B - SITE WORK

C Allquantitiesforexcavationhavebeenmeasurednetwithnoallowanceforincreaseinbulkorworkingspace.
CommencementofexcavationshallbefromthelevelasstatedonthedrawingsandasleftbytheEnablingWorks
Contractor.

D Thetenderershallallowinhisratesforexcavationforexcavatinginanymaterialexceptrockincludingrunning
silt,runningsand,commencingexcavationatanydepth,excavatingbelowthenormalwatertable,excavating
aroundexistingservicesandmainssupportingtheverticalsidesofexcavations,workingspaceandfillingsoft
spots.

E Ratesforallexcavationshallincludeforkeepingexcavationsfreefromwaterbywhatevermeans.

F Ratesfordisposalofexcavatedmaterialshallincludeforanynecessarydoublehandlingandtheprovisionofa
tip,ifnecessary,includingandchargesinconnectiontherewith.

G Theratesfortrenchesforpipesshallincludefordisposalandbackfilling.

H Theratesfordrains,inspectionchambers,etc.aretoallowfortesting.

J Ratesfordrainpipesgenerallyaretoincludeforallshortlengths,backstops,woodenplugsandretainingand
alignmentpegsrequiredinlayingandfortheextrainvolvedovernormaltrenchexcavatinginhandpackingand
tampingselectedfinematerialaroundthelowerhalfofthepipestobuttressthemagainstthesideofthetrench.
Ratesaretoincludeforleavingallpipescleanandclear.

K Pipesaremeasurednetthroughtheircentrelineaslaidandaretoincludeforalldrainfittingsonalltypesofdrain
pipes,extrajointsofalltypes,cuttings,waste,etc.forlayingintrenchesofanydepth,andbuildingintosidesof
inspectionchambersandmakinggoodasnecessary.

L Ratesfordrainfittingsonalltypesofdrainpipesaretoincludeforextrajointsofalltypesandcuttingandwaste
onallpipes.

M Ratesforaccessoriesshallincludeforconcretesurroundsandanyadditionalexcavationanddisposal.

Page:PP/11
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION C - CONCRETE WORK

A Theratesforconcreteshallincludeforhoistingtoanyheights,orloweringtoanydepth,compactionbyvibratorsif
required,curing,hacking,hackingsurfacesforkey,formingandgroutingmortises/holes/chases/grooves,making
goodconcreteinconnectionwithholesandmortisesandallsurfacetreatmentsandprotectiontounsetorcuring
concrete,allconstructionjointsincludingtemporaryformworktoformjoggledjointsandcleaningandpreparingfor
subsequentpour.

B Reinforcementhasbeenmeasuredbyweightandincludesforbothmeshandbarreinforcement.Ratesfor
reinforcementshallincludeforlaps,cutting,bending,allnecessaryspacers,hangers,chairs,stools,blocks,
waste,tyingwireandrollingmarginetcexceptthatweightsofdesignedhangersandspacersformedbytheuse
ofreinforcementbarshavebeenincludedinitemquantities.Ratesforreinforcementshallincludeforproviding
bendingschedules.

C Shutteringismeasurednetbysurfaceincontactwiththeconcrete.

D Shutteringshallbedeemedtoincludeforformingchamfers,splays,grooves,rebates,overlaps,internalangels,
notching,corners,andallnarrowwidths,shortlengthsandthelike.Theyshallalsoincludeformouldoil,
temporaryopeningsforinspection,cleaning,fixinginposition,strikingandremoval.

E Shutteringtoblindingshallbeincludedintherateforblinding.

F BendingSchedulesaretobeinaccordancewithBS8110andBS8666.

G Ratesfortensionedconcreteshallincludeforallpretensioningsteelwiresandcablesincludingpipesleeves,
grouting,tensionblocksandanchors.

H Finishingofsurfacetofallsorcrossfallsasrequiredshallbeincludedintherates.

J Ratesforconcrete,reinforcementandshutteringshallbedeemedtoincludefor:-
i)Thegroutingandmakinggoodarounditemsfixedorinstalledtothestructureincludingtobaseplates,control
plates,switches,architravesandalike.

ii)Sealingandmakinggoodaroundequipmentandappliancesincludingsanitaryware

K Thereshallbenore-measurementofreinforcementexceptasprovidedbythevariationclausesoftheConditions
ofContract.

Page:PP/12
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION D - MASONRY

A Theratesforblockworkaretoincludeforallcuttings,buildingtoanyheightofslabsorbeams,rakingoutjointsor
hackingsurfacestoformkey,beddingandpointingframes,etc.,buildingindoorandwindowframesandthelike,
buildinginorcuttingandpinninginendsoflintelssteps,timbers,steelsections,andthelike,mortisesand
makinggoodinconnectionwithbuildingin,cuttingandpinningin,holesandmortises.

B Theratesforhollowblockworkshallincludeforfillingblockssolidwithin-situconcreteandsteelbar
reinforcementwhereshownonthedrawingsordescribedinthespecificationandforprovidingsolidcourseof
blockworkatsilllevelofallopeningsandbearingofallin-situconcreteandatthetopofallfreestandingwalls.

C Theratesofcavitywallsshallincludeforallexpansionjointswithcompressiblejointfillerandjointsealantwhere
necessaryorshowninthedrawings.

D Theratesforblockworkshallincludeforallexpansionjointswithcompressiblejointfillerandjointsealantwhere
necessaryorshownonthedrawings.

E Theratesforblockworkshallincludeforstarterbars,ties,atverticalabutmentstoconcretecolumns.

SECTION E - METALWORK / STRUCTURAL STEELWORK

F Ratesformetalwork/steelworkshallincludeforallcutting,drilling,countersinking,bolting,riveting,welding,
boring,grinding,bracing,grindingoffflushetc,assembling,hoistingandfixinginposition,adjusting,siteandshop
priming,andtouchingupasnecessary.

G Preparingandsubmittingworkshopdrawingsbeforefabricationcommences.

H Scribing,rebates,grooves,chambers,splayedandroundededges,fairandreturnedends,mitres,andthelike
andforallshortisolatedlengths.

J Ratesforbalustradeandhandrailsshallincludeforbends,mitres,crosses,tees,flangedends,angles,
intersections,ramps,bearers,holes,conduitsandthelike.

K Theratesforsteelworkshallincludeforallstanchionsandrafters,gussets,endplates,andthelikeandforthe
preparationofallshopdrawings.Nongalvanizedsteelshallincludeforrustproofprimer.

L Onlymainsteelworkmembershavebeenmeasured.Allfixingsandfittingsaretobeincludedintherates.

M Thecarryingoutofspecialteststoweldedorotherjointsorconnectionsinsteelworkshallbegivenasanitem.

N Guttershavebeenmeasuredbylengthtakenalongthecentrelineoverallfittings.Allpaintingandfittingsto
guttersshallbeincludedintherates.

P Weightsdonotincludeanysecondarymembersthatmayberequiredbythecladdingcontractortosupport
cladding.

Page:PP/13
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION F - WOODWORK

A Theratesforallwoodworkshallincludeforallraking,curvedorsplayedcutting,mitresandendstoallmembers,
foralljointsinmembersover200mmwideforobtainingtimbersinonewidth,notching,sinking,roundedcurves,
splayededges,extratimberinjoints,homes,etc.,alldowelsandcrampsandholesforpipes,tubes,bar,cables,
conduits,ducting,trunkingandthelike.

B Theratesfordoorsaretoincludeforfittingandhanginganytype,weight,sizeandinanymaterial.

C Theratesshallfurtherincludeforrebates,chamfers,grooves,scribededges,roundededges,gluing,clamping,
laboursandthelike,andshallincludeforallcrossgrainandstoppedworkandforallstops,ends,anglesand
mitres.

SECTION G - THERMAL AND MOISTURE PROTECTION

D Ratesforwaterproofingshallincludeforallcutting,lapping,formationofholesforpipes,sleeves,standardsand
thelike,includingdressingandsealingaroundperforationsandinandaroundoutlets.

E Allnarrowwidths,smallareas,dubbingout,internalandexternalangles,makinggoodaroundfittings,working
aroundandformingcollarstopipesetcafteralltrades,jointingbetweendifferentmaterialsandallcutting
(includingcircularandraking)

F Ratesforskirtingandthelikeshallincludefortops,angles,intersectionsandendsandforextramaterialinlaps
andpassings.

G Ratesforflashingsandthelikeshallincludeforangles,intersections,endsandforextramaterialinlapsand
passings.Ratesshallincludefordressingintogroovesandsealing.

H Ratesforrooffinishesshallincludeforallnecessaryexpansionjoints.

J Ratesfordampproofcoursesshallincludeforlapsatanglesandintersections.

SECTION J - FINISHES
K Ratesforfinishesgenerallyshallbedeemedtoincludefor:

i)Thoroughlywettingsolidsurfacestoberenderedorscreededincludingdubbingouttowallsandprovisionof
levellingscreedtofloorsorthelike.

ii)Rakingoutjointsofblockwork,hackingsurfacesofconcreteorapplyingbondingagenttoformakey.

iii)Makinggoodorcuttingandfittingaroundpipes,gratings,sanitary,fittings,standardsandthelike,makinggood
uptodoorandwindowframes,skirting'sandthelike,temporaryrulesworkingaroundburiedservices.

Page:PP/14
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION J - FINISHES (CONT'D)

A iv)Narrowwidths,smallandisolatedareas,roundedarises,fairandchamferededgesandthelike.

v)Anglebeads,cornerbead,tiletrimsandrenderstopsarounddoors,windows,verticalandhorizontalabutments
andthelike,reinforcingmeshatjointsandbetweendifferentsurfaces;internalanglebeadsshallbegalvanized
metalandexternalanglebeadsshallbestainlesssteelunlessotherwisespecified.

vi)Workexecutedoverhead,inrestrictedareasandthelike.

vii)Maskingbeforetheapplicationofsprayedfinishes.

viii)Accesspanels.

ix)Workingatoruptoanyheight,narrowwidths,smallareasandallcuttings.

x)Expansionjointsandcontroljointsasspecification.

B Ratesforscreedshallbedeemedtoincludefor:

i)Finishingwithatemped,floatedortrowelledsurfaceorpowerfloatasrequired.

ii)Layinglevelortofalls,crossfallsorslopesasrequired,particularlyinwetareasandprovidingalevellingcoat
asrequired.

C Ratesforpaintingshallbedeemedtoincludefor:

i)Allcleaningandpreparatoryworktothesurfacestobepainted,cuttingtoline;rubbingdownbetweencoats.

ii)Workingtooratanyheight,andallnarrowwidths.

iii)Theratesforpaintingonwoodshallincludeforworkonhardwoodandsoftwoodincludingknottingandprimer
coat.

iv)Paintingtoopeningedgesofdoorsandworkonadditionalsurfacesexposedbysuchopeningedges.

v)Paintingtoallpipes,ducts,fittings,etc.asnoallowancehasbeenmadeinmeasureditems.

D Ratesforsuspendedceilingsshallincludefor:

i)Supplyingshopdrawingsandforobtainingapprovalofdetailsbeforecommencingwork.

ii)Primaryandsecondarygridsasnecessaryandforsuspendingthesamewithrequisitehangersfromthesoffits.
Perimetertrimandallcuttingandfittingpluscostofprovidingallaccesspanelsshallbeincludedintherates.

iii)Anyadditionalsuspensionmembernecessarytosupportlightingfittingsorsimilar.

iv)Alldecorativeandbulkheadslightingcores.Allcircular,squareorrectangularcuttingforlightfittingsincluding
allnecessarysupports.

Page:PP/15
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS

A Ratesforalltubingaretoincludeforprovidingsuitablesleeveswheretubingpassesthroughinternalandexternal
walls,partitions,ceilings,etc.

B Ratesforallpipesandtubingshallincludeforallshortlengths,sockets,runningcouplingsandjoints,standard
pipesupports,cuttingandwaste.Measurementshallbethroughcentrelineofpipesandtubesandthrough
fittings.

C Unlessotherwisestated,teecouplingsandconnectionsareidentifiedbythenominaldiameterofthelargestpipe
connectedtheretoandtheratesfortheseitemsaretoincludeforanyreducingteerequired.

D Ratesshallincludeforstoppingendsofpipesbyanapprovedmethodwhiletheworkisinprogresstoprevent
ingressofrubbishandforleavingallpipescleanandclearoncompletion.

E Ratesshallincludeforcoordinationwithotherengineeringinstallations.

F Ratesshallincludeforcuttingforformingholes,mortises,chasesorthelikeandmakinggoodfinishing's(tobeby
MainContractor).

G Ratesshallincludeforbuildingin,cuttingandpinningbracketsorthelikeandmakinggoodfinishing's.

H Ratesforallductworkofanytype,systemormaterialshallincludeforallfittings,flanges,accessdoors,bolting
andthelike.Measurementshallbethroughcentrelineofductsmeasuredthroughfittings.

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS

J Ratesfortheinstallationsshallincludeforanyportionoftheworkswhichcouldbereasonablyandobviously
inferredasnecessaryforthecompleteandsatisfactoryoperationfortheinstallationasawhole,althoughno
expresslydescribedorspecified.

K Theratesforswitchboards,switchgear,distributionboards,controlgear,fittings,equipmentandthelikeshall
includefor:

a) Allidentificationlabels,warningnotices,circuitschedulesandthelike
b) Thecompletionofthecircuitschedules
c) Allnecessaryglandplatesandcableentryboxes
d) Allearthtapes,cablesandconnectionstoassociatedcableterminationglands,conduitand/ortrunking.

L Maincircuits(definedastheincomingsupplytothedistributionboardswithinabuilding)shallbemeasuredas
follows)

a) Cablesshallbemeasuredbylengthandshallbedeemedtoincludecolourcoding,marking,joints,boxes,
linetops,shrouds,terminationglands,connectors,supports,sleeves,platesandthelike.
b) Conduitshallbemeasuredbylengthandshallbedeemedtoincludeconduitboxes,allfittings,saddles,
crumpetsbending,cutting,screwing,jointingandthelike.

c)Traysandtrunkingshallbemeasuredbylengthandshallbedeemedtoincludeallfittings,stools,saddles,
cleats,clips,firebarriers,pinracks,cutting,jointing,earthcontinuitycomponentsandthelike.Trunkingshallalso
bedeemedtoincluded.

Page:PP/16
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS (CONT'D)

A Submaincircuits(definedassupplyfromadistributionboardtoasub-maindistributionboard)shallbe
measuredinaccordancewithPOM(I)ClauseR2.

B Theratesforenumeratedpoints,outlets,equipmentandthelikeshallbedeemedtoincludecables,conduit,
trunking,trays,earthingtapeandallequipmentandaccessoriesnecessarytoprovidepower.

C Spacingofcomponentsforsupportingearthingtapesorcableshasnotbeenstatedandtheratesforearthing
tapesandcablesshallincludeforallsaddles,cleats,clipsholdfastsandtheliketosuitsiteconditions.

D Thelengthofpendantdropsarenotstatedandtheratesforlightingfittingsshallincludeforpendantdrops,
boxes,conduitboxes,woodblocks,mouldedpattresses,breakjointrings,ceilingroses,connectorblocks,dome
covers,backplates,ballandsocketbackplates,earthcontinuity,flexiblecords,chokes,capacitors,starters,
lampholdersandthelike.

E Theratesforalllightingfittingsshallincludeforallassociatedlamps,controlgear,diffusers,shadesandthelike.

F Theratesforclocks,telephones,firealarms,burglaralarms,loudspeakersandthelikeshallincludewhere
requiredforallboxes,conduitboxes,woodblock,mouldedpattresses,coverplatesandthelike.

G Theratesforallsocketoutletsincludeforassociatedplugtops.

H Theratesforsurfaceaccessoriesshallincludeforanynecessarybackplatesandsurfacemountingboxes.

J Theratesforallflush,semi-flush,recessed,semi-recessedandinsertionitemsshallincludeforanynecessary
boxes.

K Theratesforallaccessories,fittings,equipmentandthelikeshallincludeforallnecessaryearthingtailsand
terminals.

L Thetermconnectionunitalsocoversspurunitsandspurboxes.

M Ratesshallincludeforcoordinationwithotherengineeringinstallations.

Page:PP/17
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS (Cont'd)

A Ratesshallincludeforcuttingorformingholes,mortises,chasesorthelikeandmakinggoodfinishings(tobe
donebyMainContractor).

B Ratesshallincludebuildinginorcuttingandpinningbracketsorthelikeandmakinggoodfinishings(tobedone
byMainContractor)

SERVICES GENERALLY

C TheContractorshallbecompletelyresponsibleforobtainingtherequirementsforholes,fixings,andanyother
BuildersWork.HeshallcoordinatetherequirementsforBuildersWorkbetweentradesandensurethatsuch
informationisasshownontheDrawingsinaccordancewithhisownandtheEmployer'srequirements.Detailsof
Builder'sWorkwhichisnotshownontheDrawingsbutwhichisrequiredbytheContractorshallbeforwardedto
theEngineerforhiswrittenapprovalbeforetheworkisputinhand.Anycostofunnecessaryworkduetothe
Contractorfailingtocomplywiththeseconditionsorfailingtoactuponsuchinformationgivenbeborneentirelyby
theContractor.

D Thedrilling,cuttingorleavingofholesoraperturesthroughstructuralfloors,walls,beams,etc.,shallbeavoided,
butwherethisbecomesanecessitythecontractormustobtainthewrittenapprovaloftheEngineerbeforesuch
workisputinhand.

BUILDERS WORK

E TheexpressionusedhereBuildersWorkrelatedtoservicesincludesbutisnotlimitedtothefollowing:

a) Drilling,cuttingorleavingofholesforpipes,ductsandthelikethroughwalls,floors,partitions,roofs,etcand
subsequentlymakinggood.
b) Cuttingandpinningendsofsupportsforpipes,equipment,appliances,fittingsandtheliketowalls,floors,
partitions,soffits,etc.,andmakinggood.
c) Cuttingorleavingmortises,sinking,etc.,forholdingdownbolts,brackets,supportsandthelikeandgrouting
in.
d) Cuttingchasesforpipesandthelikeinwalls,floors,partitions,etc.,andsubsequentlymakinggood.
e) Cuttingandfittingaround,boringholesthroughandmakinggoodoffinishingsuptopipes,supports,
brackets,andthelike.
f) Theformationofsmallconcretebases,plinths,etc.forplant,tanksandequipment,includinganti-vibration
padsasnecessary.
g) Thepaintingofexposedpipework,fittings,equipment,etc.

F BuildersWorkwillincludealltheabove,butitshouldbenotedthatthislistisnotintendedtobeexhaustiveand
everythingnecessarywillbedeemedtobeincluded.

Page:PP/18
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PROVISIONAL SUMS

A ProvisionalSumsincludedintheseBillsofQuantitiesmaybeexpendedtotally,inpartornotatallandasdirected
bytheEngineer.

B TheContractorwillhavenoentitlementtoanyclaimforlossofprofitintheeventthatanyorallProvisionalSums
areomittedinpartorintheirentirety.WheretheContractorhasinsertedanassociated%age(notcomposite
items)forattendancesandbuildersworkstheseshallalsobeadjustedforanyomissionoradditionasrequired
undertheConditionsofContract.

Page:PP/19
GENERAL SUMMARY
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
GeneralSummary
ITEM TOTAL PRICE
ITEM DESCRIPTION
REF: RIYALS OMANI

BILLS OF QUANTITIES

GENERAL SUMMARY

BillNo. PageNo.

1 PreliminariesandGeneralRequirements 1/5

2 SiteWorks 2/5

3 Dayworks 3/7

TOTAL CARRIED TO FORM OF TENDER

GS-1 FGOULD.COM
BILL NO. 1

PRELIMINARIES
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.01Preliminaries&GeneralRequirements
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL
REQUIREMENTS

Contractual Requirements '(reference General &


Particular Conditions of Contract)

A Performancesecurity 1 Item

B InsuranceofContractor'sequipment 1 Item

C Workmen'sCompensationInsurance 1 Item

D ThirdPartyLiabilityInsurance 1 Item

E Programofworksasperclause14oftheGeneral
Conditions 1 Item

F Allowforthepaymentof"Engineer's/Employer's
Representative's"overtimeforsupervisionoftheworks
beyondnormalsiteofficeworkinghoursasmaybe
requiredbytheContractor(Provisional) 1 Item

SurveyingEquipment

G EstablishmentofsurveyingEquipment 1 Item

H MaintenanceofsurveyingEquipment 160 Day

J RemovalofsurveyingEquipment 1 Item

OperationandMaintenanceManuals

K TheContractorshallprovideoperationalandmaintenance
manualsasstatedinthespecifications 1 Item

AttendanceupontheEmployerRepresentativeStaff

L OfficeAttendants 1 Item

ProjectClose-OutReport

M Contractorshallprepareafinalclose-outreportas
specified 1 Item

ProgressReport

N SetofProgressReports,ProgressPhotographsas
specified 20 No

CostControlReport

O SetofCostControlReport 20 No

'ToCollectionpage

Page:1/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.01Preliminaries&GeneralRequirements
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL


REQUIREMENTS (CONT'D)

Contractor's Facilities

Contractorshallberesponsibleforproviding
accommodationandbuildings,includingoffices,
compounds,stores,messroomsandlivingaccommodation
asstatedinthespecifications

A Establishment 1 Item

B Maintenance 160 Days

C Removal 1 Item

ServicesfortheContractor(Lighting,Power,Waterand
Sanitation)

D Establishment 1 Item

E Maintenance 160 Days

F Removal 1 Item

SiteManagementandSupervision

G Contractor'sSiteManagementandSupervisionStaff 160 Days

ScaffoldingfortheContractor'sownuseandfortheuseof
allthesub-Contractors

H Allowforprovide,erect,maintain,dismantleandclear
awayatcompletionproperandadequatescaffoldingfor
theContractor'sownuseandfortheuseofallthesub-
Contractors 1 Item

ConstructionPlantforPermanentWorks

J Establishment 1 Item

K Maintenance 160 Days

L Removal 1 Item

OtherCosts

M Compliancewiththeconditionsofcontractand
specification(theTenderershallseparatelylistandprice
belowanyotherclauseconsideredtohavemonetary
value)-Transport of people & HSE requirements
1 Item

'ToCollectionpage

Page:1/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.01Preliminaries&GeneralRequirements
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL


REQUIREMENTS (CONT'D)

Sundry Items

Testingofmaterials

A AllowforalltestsrequiredbytheSpecification 1 Item

B Allowforprovidingsamplesasspecified 1 Item

Protectingtheworks

C Allowforprotectionofworksfrominclementweather 1 Item

D TheContractorshallprotectallexistingservicesduringthe
construction.Anydamagetoexistingservicesshallbe
makegoodbyhisowncosts.Ifanytemporaryor
permanentre-routingofexistingservicesarerequired,the
Contractorshallberesponsibleforgivingnoticetothe
relevantauthoritiesandallowforattendance.
1 Item

CleaningtheWorks

E TheContractorshallremoverubbishatregularintervals,
provideprotectivecasingsandcoveringsandcleanthe
worksatcompletion 1 Item

Trafficregulations

F TheContractorshallcomplywithalltrafficregulationsand
shallliaisewiththepoliceandotherauthorities 1 Item

PetroleumRegulations

G TheContractorshallcomplywithanypetroleum
regulationsinforce 1 Item

H Allowforattendanceontheworkscarriedoutbythe
statutoryauthorities 1 Item

J TheContractorshallgiveallnotices,seekpermissions
andpayallfeesnecessaryfortheissueofbuilding
permits,approvals,permanentserviceconnectionsand
thelike 1 Item

'ToCollectionpage

Page:1/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.01Preliminaries&GeneralRequirements
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL


REQUIREMENTS (CONT'D)

Sundry Items (Cont'd)

Shopdrawings,Asbuiltdrawings,etc.

A TheContractorshallprepareandsubmit"shop"drawings
asspecified 1 Item

B Allowforproviding,operatingandmaintenancemanuals
asspecified 1 Item

C TheContractorshallprovideallsparesasspecified 1 Item

D TheContractorshallprepareasbuiltdrawingsas
specified 1 Item

Co-ordination

E Allowforallco-operationandco-ordinationwithallother
Contractors 1 Item

TheGeneralRequirementSpecificationsarestatedinthe
TenderDocuments(VolumeFive)

F TheContractorshallincludesuchsumsasheconsiders
necessarytocoverhisobligations,liabilitiesandservices
underthisdocuments,butnotlimitedtothefollowingitems
1 Item

'ToCollectionpage

Page:1/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.01Preliminaries&GeneralRequirements
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

Collection Page : Preliminaries

PageNo.1/1

PageNo.1/2

PageNo.1/3

PageNo.1/4

ToGeneralSummary

Page:1/5 FGOULD.COM
BILL NO. 2

SITE WORKS
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.02Siteworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

SECTION B - SITE WORK

Enabling works (Mass excavation to reduce level)

Site preparation

A Generalsiteclearance 5,173 m2

Excavationotherthanrockandhardstrataincluding
trimming,levelling&compactingbottomsofexcavation,
horizontal&slopedsurfaces

B Massexcavationtoreducelevels(basement2below
gradeslablevel) 24,150 m3

Disposal

C Disposalofexcavatedsurplusmaterialonsitetoa
designatedlocationasinstructedbytheEngineerin
accordancewiththespecification 24,150 m3

Project sign board

D Accordingtodrawingref;SA-AL-0121Rev(01)The
Contractorshallsupplyandinstall2Nrprojectsignboards
inaccordancewiththedrawingsandspecifications.The
contractorshallensurethatallinformationiscomplete,
accurateandofficial.Informationmustbewritteninboth
ArabicandEnglishlanguages,itshouldbewritteninclear
fonts,coloursandreadableformatandshouldnotcontain
anynamesofunregisteredcompaniesinOman.Sign
boardsshouldbewithinthesitetemporary
fencing/hoardinglineasshowninthedrawingand
specification.
2 Nr

Perimeter hoarding

E Drawingref;SA-AL-0121Rev(01)TheContractorshall
supplyandinstallaperimeterhoardinginaccordancewith
thedrawingandspecification 446 m

Access Gate

F DrawingRef;SA-AL-0122Rev(01)Contractorshall
supplyandinstallaccessgatesinaccordancewiththe
drawingsspecification. 1 Item

ToCollectionpage

Page:2/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.02Siteworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

SECTION B - SITE WORK (CONT'D)

PILLING

i)ThePiledetailsshownontenderdrawingsareindicative
only.TheContractorshallbeprovidingpilesthatsatisfythe
requirementofthespecificationsandcapableofsupporting
theloadspecified.Thecontractorshallsubmitdetaildesign
calculationsanddrawingsforconsultant'sapproval

ii)TheContractormustcarefullyexaminetheenclosedsoil
investigationreportbeforepricingthisdocument.Noclaims
arisingfromtheContractor'snegligenceinstudyingthesoil
investigationreportwillbeentertained

iii)TheContractorshallnotethatallquantitiesinthisbillof
quantities,applicabletodesignandbuilditems,are
indicativeonly.Thecontractormaychangethequantitiesfor
thesesitems,ifneeded,toreflecttheactualdesign
proposed.(Contractordesignitems)

iv)Cartingawayshallincludeforallloading,offloadingand
cartingawayfromthesitetoasuitabledumpingsitetobe
foundbytheContractorandtheContractorshallpayall
fees,etc.inthisregard

Secant Piling

Design,supplyandinstallSecantpiles,600mmdiameter
includingallpreparatoryworks,earthworks,concrete,
reinforcementandpreparationandgapFillingwithshotcrete
liningandexternalfacemakesmoothfinishtoreceive
tankingmembraneasshownondrawingnoMA-AL-0051
Typicalpartplan.Completingofallpilingworkasperthe
drawingandspecification.

A EstablishmentofPilingrig/sonsite 1 Item

B RemovalofPilingrig/suponcompletion 1 Item

C 600mmdiameterpiles 90 No

ToCollectionpage

Page:2/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.02Siteworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

SECTION B - SITE WORK (CONT'D)

PILLING (CONT'D)

Secant Piling (Cont'd)

Testingtopilesinaccordancewithspecificationsand
drawings

A Allowfortesting 1 Item

CappingBeam

B Cappingbeam(600x600)Contractortoallowfor
Concrete,steelandformworkasnecessary,andalsoall
incidentalorrelatedworks 14 m3

PileCutting

Cuttingpilestorequiredheightsleevingthesteel
reinforcementincludingwaterproofingmembranearound
pilesinaccordancewithspecificationsanddrawings

C 600mmdiameterpiles 90 No

Treatmentforpilehead

D Treatmentforpileheadasperdrawingsandspecifications
1 Item

ToCollectionpage

Page:2/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.02Siteworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

SECTION B - SITE WORK (CONT'D)

PILLING (CONT'D)

Soldier Pilling

A TheContractorshalldesign,supplyandinstallSoldier
piles,600mmdiametertobecastdownapproximate19m
includingallpreparatoryworks,earthworks,concrete,
reinforcementandpreparationandgapFillingwith
shotcreteliningandexternalfacemakesmoothfinishto
receivetankingmembraneasshownondrawingref;MA-
AL-0051R0Typicalpartplan.Completingofallpilingwork
asperthedrawingandspecification.Contractortoallow
forallincidentalandrelatedworks
31 Nr

B 100mmthickprecastPanels-Contractortoallowforall
incidentalandrelatedworks 152 m2

C 200mmthickblockWork-Contractortoallowforall
incidentalandrelatedworks 165 m2

D 50mmthickwaterProofing&Projectionboard-
Contractortoallowforallincidentalandrelatedworks 152 m2

Dewatering System

E
Thecontractorshallwherenecessaryandtothe
satisfactionoftheEngineer,design,supplyandinstalla
dewateringsystemandshallallowtoproposea
dewateringsystemcapableofloweringgroundwatertoa
levelatleast1.0mbelowthelowestexcavationleveland
tokeeptheexcavationareadryandfreefromleaksandto
preventdamagetothebuildingdueduetohydrostatic
pressureastocomplywithlocalauthorityrequirements
1 Item

ToCollectionpage

Page:2/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.02Siteworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

Collection Page : Substructure

PageNo.2/1

PageNo.2/2

PageNo.2/3

PageNo.2/4

ToGeneralSummary

Page:2/5 FGOULD.COM
BILL NO. 3

DAYWORKS
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.03Dayworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

DAYWORK SCHEDULE

A) Day work

1)TheContractormayberequiredtoexecutecertainworkduetothenatureofwhichthemethodofvaluation
willbeonadayworkbasis.

2)TheContractoristomaintainanaccuraterecordoftimespentandmaterialsandplantusedforeach
separateinstructiongiven.Dayworksheetsaretobenumberedandshoulddescribefullyinstructionstowhich
theyreferandtheyaretobesummarized,pricedandsubmittedtotheEngineereachweek.Thesubmissionof
suchdayworksheetsdoesnotnecessarilymeanthattheworkwillbevaluedundertheConditionsofContract
orthatanypaymentisinfactdue.

B) Labour

1)TheContractor,whentendering,istogivetheratesherequiresforlabourersandcraftsmenagainsteach
itemstated.

2)Theratesaretobecomprehensiveandinclude:

a)Wagesandallcosts,paymentsandchargesincludingpensions,annualandpublicholidays,travellingtime,
expenses,faresandtransport,guaranteedtime,nonproductivetimeandotherexpensesinconnectionwith
overtime,incentiveandbonuspayments,andotherdisbursementsarisingfromemploymentoflabour
b)Chargesincurredinrespectofsiteandofficesupervisionincludingforeman'stimeandextraemoluments
paidtoforemenandleadingcraftsmenandgangers.

c)SiteandHeadOfficeoverheadchargessuchasrent,rates,insurances,electricity,gas,fuel,water,printing,
stationery,postage,telephonecharges,motorcarexpenses,renewals,maintenanceanddepreciationof
premises,machinery,plantandthelike.

d)Profit.

C) Materials

1)Materialsusedindayworkstobechargedatinvoicecost.AlldiscountsaretobeallowedtotheEmployer.
InvoicesaretobemadeavailabletotheEngineeratthetimetherelevantdayworksheetsaresubmitted.

2)TheContractoristoallowintheitemprovidedtheadditionalpercentageherequirestobeaddedtothe
invoicecostofmaterialstocoveralldeliverycoststosite,includingfeespayableunloading,storing,transport,
overheadchargesaspreviouslydefinedandprofit.

Page:3/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.03Dayworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

A) Plant

1)Thecontractoristoentertheratesherequiresperhourforplantandmachineryagainsttheitemsstated.

2)Theratesaretobecomprehensiveandwillinclude:

a)Mobilizationanddemobilizationcosts.

b)Fuel,oil,lubricantsandallotherconsumables.

c)Servicing,repairsandreplacements.

d)SiteandHeadofficeoverheadchargesasdefinedabove.

e)Profit.

3)Theratesaretobeexclusiveofattendantsanddriverswhoshallbechargedatlabourratesassetout
above.

4)IftheContractorisunabletopricetheparticulartypeofplantlisted,heshouldpriceforthenearestequivalent
itemavailabletohimandstatewhathasbeenincludedinhistender.

Page:3/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.03Dayworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

Labour

A Labourers/helpers 1 hr

B Scaffolders 1 hr

C Steelfixers 1 hr

D Drainagelayers 1 hr

E Carpenters 1 hr

F Plasterers 1 hr

G Blocklayers 1 hr

H Plumbers 1 hr

J Painters 1 hr

K Electricians 1 hr

L Plantandmachineryoperators&drivers(LightDuty) 1 hr

M Plantandmachineryoperators&drivers(HeavyDuty) 1 hr

N Welders 1 hr

P PipeFitter 1 hr

Q MetalWorker 1 hr

R Attendant 1 hr

S Chargehand 1 hr

Materials

T Contractor'spercentageonthenetcostofmaterial %

'ToCollectionpage

Page:3/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.03Dayworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

Plant

A Bulldozerupto100H.P. 1 hr

B Bulldozerfrom100-200H.P. 1 hr

C Bulldozerover200H.P. 1 hr

D Crawlerloaderwithbucketcapacitylessthan2m3 1 hr

E Crawlerloaderwithbucketcapacity2m3orgreater 1 hr

F Wheeledloaderwithbucketcapacitylessthan2m3 1 hr

G Wheeledloaderwithbucketcapacitym3orgreater 1 hr

H Smoothsteel-wheeledroller10T 1 hr

J Pneumatictyredroller10T 1 hr

K Selfpropelledvibratingroller10T 1 hr

L Selfpropelledvibratingtrenchroller10T 1 hr

M Tracked360degreehydraulicexcavatorwithunitweight 1 hr
lessthan20Torgreater

N Tracked360degreehydraulicexcavatorwithunitweight 1 hr
20Torgreater

P Wheeledoffsetexcavatorwithbackhoe&shovel(JCB) 1 hr

Q Waterbowserwithpump&spraybar(capacity5000gl) 1 hr

R Tippertrucklessthan15Tcapacity 1 hr

S Tippertruck15Torgreatercapacity 1 hr

T Lowsidetrucklessthan6Tcapacity 1 hr

U Lowsidetruck6Torgreatercapacity 1 hr

V Lowsidetruck6Torgreatercapacitywithliftingarm 1 hr
(Hiab)

'ToCollectionpage

Page:3/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.03Dayworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

Plant (Cont'd)

A Pickuptruckto3Tcapacity 1 hr

B Fourwheeldrivepickuporstationwagon 1 hr

C Concretetransittippertruck6m3capacity 1 hr

D Mobileconcretemixer0.5m3 1 hr

E Mobileconcretemixer5m3 1 hr

F Fourwheeldrivedumper1m3capacity 1 hr

G Mobilegeneratorandweldingset25KVAorlarger 1 hr
completewithallaccessories

H Lorrymountedcraneupto25Tcapacity 1 hr

J Pilingrig 1 hr

K Portabletrafficsignalset 1 hr

L Concretepumpcomplete(capacity38/45m3/h) 1 hr

M Mobilegenerator250KVA 1 hr

N Mobilefloodlightsetwithgenerator 1 hr

P Gascuttingsetwithallaccessories 1 hr

Q Dieseldriven2"vibratingpokerunit 1 hr

R Trenchwackerplate 1 hr

S Dewateringpumpwith200mlengthof150dia.hose 1 hr

T Trenchshuttering(perm2) 1 week

R Sheetpiling(perm2) 1 week

S 3"portablepumpandhoses 1 hr

T 6"portablepumpandhoses 1 hr

'ToCollectionpage

Page:3/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.03Dayworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

Plant (Cont'd)

TheContractorshouldinsertbelowanyotherplantor
equipmentwhichmayberequiredtogetherwiththe
appropriaterate:

..

..

..

..

..

..

..

..

'ToCollectionpage

Page:3/6 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
EnablingWorksPackage
BILLNo.03Dayworks
ITEM QUANTIT UNIT RATE TOTAL PRICE
ITEM DESCRIPTION UNIT
REF: Y (RO) (RO)

Collection Page : Day Works

PageNo.3/1

PageNo.3/2

PageNo.3/3

PageNo.3/4

PageNo.3/5

PageNo.3/6

ToGeneralSummary

Page:3/7 FGOULD.COM