EXCAVATION IN FOOTING 1:
EXCAVATION IN FOOTING 2:
COVERED COURT
o FOOTING REINFORCEMENT
RSB
LENGTH= 1.5m 0.0275 = 1.35 m
CUT BAR = L + 4(0.075m)
= 1.35 + 4(0.075m)
= 1.65 m
TOTAL LENGTH = 1.65 m(20)
33
= 6
= 5.5 . 6 .
(6. )(4 ) = 24 .
1.58 (6)(24) = .
TIE WIRES:
=100 TIES(0.3m)
30
= 53 = 1kg # 16 G.I. WIRE
o COLUMN REINFORCEMENT
MAIN RSB:
LENGTH= (1.5m + 1.4m+ 0.27m + 0.20m)
= 3.37 m
3.37 m(8 RSB)(4 COLUMN)
TOTAL LENGTH = 6
= 17.97 . 18 .
1.58 (6)(18) = .
TIE WIRES:
= 6(29) = 174 TIES
174 TIES (0.3m)
= 53
= # . .
LATERAL TIES:
= 29 lateral ties(1.4m)(4 footings)
162.4 m
= 6
= 27.07 pcs say 28 pcs
(6)(28
=0.62 pcs) = 104.16
o T-BEAM REINFORCEMENT
MAIN RSB:
(6)(21)
1.58 = .
LATERAL TIES:
= 52 lateral ties (0.9m)(4)
187.2m
= 6
= 31.2 pcs say 32 pcs
=0.62 (6)(32 pcs) = 119.04
TIE WIRES:
= 6(52 lateral ties) = 312 TIES
312 TIES (0.3m)
= 53
= 1.77 # . .