3 Pass Schedule With a Calendar

need to apply the calendar formulas. We start with the start and stop from push 2 of Section 34 (columns
W and X), and apply the formulas set out in Section 10.

Start of first job: ###

Start Stop
W/C Prod-uct hour hour Days Start Date Calc1 Calc2 Calc3 Stop
6 prod A 0 17 0.71 ### 5 1.10 12.00 ###
6 prod B 36 52 0.67 ### 12 1.77 19.00 ###
6 prod C 76 84 0.33 ### 19 2.10 23.00 ###
7 prod A 1 18 0.71 ### 5 1.15 13.00 ###
7 prod B 37 71 1.42 ### 13 2.56 28.00 ###
7 prod C 77 87 0.42 ### 28 2.98 33.00 ###
8 prod A 2 32 1.25 ### 6 1.72 19.00 ###
8 prod B 64 72 0.33 ### 19 2.05 23.00 ###
8 prod C 78 96 0.75 ### 23 2.80 31.00 ###

- the duration of the operation is re-established from the stop and start
=(D17-C17)/24 hours, as it is not always the same as the hours (Section 30, column H)