CHAPTER 2

2.0 INTRODUCTION

While undergoing industrial training at Telekom Malaysia Berhad, I was placed under
Unit SDZ TM Node Kok Lanas. Among the scope of work during the industrial
training are as follows:

2.1 UNIT SDZ

The SDZ unit is a small branch under NMO (Network Management and
Operation), where this unit is responsible for recording, repairing and updating
records related to damages. Organizations under this administration are divided into
two groups where the attached organizational structure acts to record and update all
work trips that have been reported by technicians working outside of the
reconstruction process.

Distribution of number of employees stationed in certain areas is measured by


the percentage of service usage in this area. This is due to the highest percentage of
users leading to high damage as well as advanced areas such as city centers and so on.
This can help expedite the restoration process, depending on the number of
employees.
2.1.1 MAIN ACTIVITIES

2.1.1.1 DEL INSTALLATION

Figure below shows the flow chart of DEL installation that involves Unit SDZ.
Firstly, installation work orders will be monitored via the SWIFT portal. Then, there
will be roll call for installer and at the same time the information or action that needs
to be done regarding installation issues will be discussed. Unit SDZ also will
coordinate with the parties if there is a complaint regarding the installer. Next, solve
technical problems during installation by the installer before work orders can be
returned. Finally, make sure the installer does the installation work according to the
set guidelines.

Start

Monitor work orders via


SWIFT portal

Make roll call / Installer


meeting

Coordinating with the


involved parties for
complaints involving
installers

Solve technical problems during


installation before work orders
can be returned

Make sure the installer does


the installation work
according to the set guidelines

End

Figure : The flow chart of DEL installation


In DEL installation process, MDF section of Unit SDZ also gets involve. When there
is work orders in SWIFT Portal, MDF assistant will performed physical jumper on
MDF for installation and update the jumper status via SWIFT Portal. Figure below
shows the flow chart of Del installation for MDF section:

Start

Receive scheduled work


orders via SWIFT Portal

Perform physical Jumper on


MDF

Update jumper status in


SWIFT Portal

Figure : Flow chart of Del installation for MDF section


2.1.1.2 REPAIR DEL SERVICE

Start

Receive scheduled work orders via


SWIFT Portal.

Perform physical jumper on MDF


(DEL & DSLAM / Combo Part)

ADSL test on DSLAM port

Test No
Change Port
okay?

Yes

Update status jumper in SWIFT


Portal