CHAPTER 9

DISCUSSION QUESTIONS

4. (a) The advantages of a product layout are:


The use of special purpose equipment can make the overall process more efficient
Individual workloads can usually be made to be relatively equivalent
It usually results in low variable cost per unit
It tends to keep material handling costs relatively low
It reduces work-in-process inventories
It makes training and supervision easier than with other layout strategies
(b) The disadvantages are:
High volume is required because of the large investment needed to set-up the process
Work stoppage at any point ties up the whole operation
There is a lack of flexibility in handling a variety of products or production rates

5. (a) The advantages of a process layout are:


It can simultaneously handle a wide variety of products or services, especially in terms
of batches or job lots
It has considerable flexibility with respect to equipment and labor assignments
(b) The disadvantages of a process layout are:
The use of general purpose rather than special purpose equipment tends to make the
overall process somewhat less efficient
Orders take more time and money to move through the system because of the difficult
scheduling, setting up the process for a wide variety of orders, and considerable
material handling
Labor skill requirements tend to be high because of the use of general purpose equipment
Work-in-process inventories tend to be high

6. The advantages of work cells are:


Reduction in work-in-process inventory
Reduction in required floor space
Reduced raw material and finished goods inventory
Reduced direct labor cost
Heightened sense of employee participation
Increased utilization of equipment and machinery
Reduced investment in machinery and equipment
The disadvantages are:
Similar to a product layout
High volume is required because of the large investment needed to set-up the process
There is a lack of flexibility in handling a variety of products or production rates
Requires the use of group technology
Requires a high level of training and flexibility on the part of employees
Either considerable staff support or imaginative employees are needed for the initial
development of the work cells

17. A heuristic is a rule of thumb method of problem solving. Line balancing heuristics include:
longest task time, most following tasks, ranked positional weights, shortest task time, and least
number of following tasks.

END-OF-CHAPTER PROBLEMS

Chapter 9: Layout Strategy 1


9.1 Interstation Activity Matrix
Pickup Pickup Verification
Paperwork Advising Class of Status
and Forms Station Cards and Payment
(A) (B) (C) (D)
Paperwork/Forms (A) 0 450 550 50
Advising (B) 250 0 200 0
Class Cards (C) 0 0 0 750
Verification/Payment (D) 0 0 0 0

Interstation Distance Matrix-Original Layout


Pickup Pickup Verification
Paperwork Advising Class of Status
and Forms Station Cards and Payment
(A) (B) (C) (D)
Paperwork/Forms (A) 0 30 60 90
Advising (B) 30 0 30 60
Class Cards (C) 60 30 0 30
Verification/Payment (D) 90 60 30 0

Load Distance
A B: 450 30 13,500
A C: 550 60 33,000
A D: 50 90 4,500
B A: 250 30 7,500
B C: 200 30 6,000
C D: 750 30 22,500
87,000

Initial layout:

A B C D

2 Instructors Solutions Manual t/a Operations Management


Interstation Distance Matrix-Improved Layout
Pickup Pickup Verification
Paperwork Advising Class of Status
and Forms Station Cards and Payment
(A) (B) (C) (D)
Paperwork/Forms (A) 0 30 30 60
Advising (B) 30 0 60 90
Class Cards (C) 30 60 0 30
Verification/Payment (D) 60 90 30 0

Load Distance
A B: 450 30 13,500
A C : 550 30 16,500
A D: 50 60 3,000
B A: 250 30 7,500
B C: 200 60 12,000
C D: 750 30 22,500
75,000

Improved layout:

B A C D

9.2 This matrix includes movements in both directions:

M W D L G B
M 125 75 0 50 60
W 0 75 0 0
D 0 150 20
L 20 0
G 0
B

Chapter 9: Layout Strategy 3


Here are two optimal layouts:

Room 1 Room 2 Room 3

B M W

D G L

Room 4 Room 5 Room 6

or

Room 1 Room 2 Room 3

W M B

L G D

Room 4 Room 5 Room 6

Movement-Distance Calculations
M W: 125 20 2,500
M D: 75 40 3,000
M G: 50 20 1,000
M B: 60 20 1,200
W L: 75 20 1,500
D G : 150 20 3,000
D B: 20 20 400
L G: 20 20 400
13,000 = Minimum distance movement for both (symmetrical layouts)

9.3 Current layout:

Entrance 1 Exam I 2 Exam II 3 X-ray 4

Lab, EKG 5 O.R. 6 R.R. 7 Casts 8

Patient movement = 6,700 feet

4 Instructors Solutions Manual t/a Operations Management


Improved layout:

Entrance 1 Exam I 2 Lab, EKG 5 O.R. 6

Exam II 3 X-ray 4 R.R. 7 Casts 8

Patient movement = 4,800 feet (shown in Figure 9.17 of text)

Improved layout:

Entrance 1 Exam I 2 Lab, EKG 5 O.R. 6

Exam II 3 X-ray 4 Casts 8 R.R. 7

Patient movement = 4,700 feet

More improved layout (with Exam rooms swapped):

Entrance 1 Exam II 3 Lab, EKG 5 O.R. 6

Exam I 2 X-ray 4 Casts 8 R.R. 7

Patient movement = 4,500 feet

Note that this final solution reflects common sense, or the result of ones intuition. We simply
allocate the spaces in the order in which the tasks are usually performed. We usually start at the
entrance, proceed to an examination room; from the examination room, proceed for either x-rays or
lab tests, then (a) leave the facility, (b) go to get a cast put on, or (c) go for surgery.

Chapter 9: Layout Strategy 5


9.4 Layout 1:

Refrig. Counter Sink Storage Stove


(1) (2) (3) (4) (5)

Trip Matrix Distance Matrix


1 2 3 4 5 1 2 3 4 5
1 0 8 13 0 0 1 0 4 8 12 16
2 5 0 3 3 8 2 4 0 4 8 12
3 3 12 0 4 0 3 8 4 0 4 8
4 3 0 0 0 5 4 12 8 4 0 4
5 0 8 4 10 0 5 16 12 8 4 0

Tij Dij 600 with rooms fixed (504, if not fixed; 560, if the sink is fixed in one location)
Layout 2:

Sink Storage
(3) (4)

Refrig. Counter Stove


(1) (2) (5)

Trip Matrix Distance Matrix


1 2 3 4 5 1 2 3 4 5
1 0 8 13 0 0 1 0 7 8 12 14
2 5 0 3 3 8 2 7 0 5 6 7
3 3 12 0 4 0 3 8 5 0 4 9
4 3 0 0 0 5 4 12 6 4 0 6
5 0 8 4 10 0 5 14 7 9 6 0

Tij Dij 602 (if rooms are fixed; 566 if not; and 595 if sink is fixed at one location)
9.5 Layout 3:

Refrig. Counter Sink


(1) (2) (3)

Storage
(4)

Stove
(5)

6 Instructors Solutions Manual t/a Operations Management


Trip Matrix Distance Matrix
1 2 3 4 5 1 2 3 4 5
1 0 8 13 0 0 1 0 4 8 12 14
2 5 0 3 3 8 2 4 0 4 8 10
3 3 12 0 4 0 3 8 4 0 3 8
4 3 0 0 0 5 4 12 8 3 0 4
5 0 8 4 10 0 5 14 10 8 4 0

Tij Dij 564 (if rooms are fixed; 474 if unfixed)

9.6 (a) Layout 4:

Counter Sink Storage


(2) (3) (4)

Refrig. Stove
(1) (5)

Trip Matrix Distance Matrix


1 2 3 4 5 1 2 3 4 5
1 0 8 13 0 0 1 0 5 8 11 13
2 5 0 3 3 8 2 5 0 4 8 11
3 3 12 0 4 0 3 8 4 0 4 8
4 3 0 0 0 5 4 11 8 4 0 5
5 0 8 4 10 0 5 13 11 8 5 0

Tij Dij 609

Chapter 9: Layout Strategy 7


(b) Layout 5

Trip Matrix Distance Matrix


1 2 3 4 5 1 2 3 4 5
ref-1 0 8 13 0 0 ref-1 0 4 12 12 4
coun-2 5 0 3 3 8 coun-2 4 0 3 4 4
sink-3 3 12 0 4 0 sink-3 12 3 0 4 4
stor-4 3 0 0 0 5 stor-4 12 4 4 0 3
stov-5 0 8 4 10 0 stov-5 4 4 4 3 0

Tij Dij 478


Solution: Refrig in Room 3 (where sink was); Counter in Room 4 (where storage was); Sink in
Room 2 (where counter was); Storage in Room 1 (where Refrig was); Stove in Room 5 (no
change)

9.7 Performance Time Task Must Follow


Task (in minutes) This Task
A 1
B 1
C 4 A, B
D 1 B, C
E 2 D
F 4 E
13

400 minutes
(b) Cycle time 5 minutes unit
80 units
(c) Minimum number of stations
ti 13 2.6 3 stations
CT 5

(a) & Station 2 Station 4


(d)
(1) (1) (2) (4)
B D E F

Station 3
(1) (4)
A C
Station 1

13 minutes
(e) Efficiency 0.65 65%
4 stations 5 minutes

Multiple layouts are possible.

8 Instructors Solutions Manual t/a Operations Management


9.8 Performance Time Task Must Follow
Task (in minutes) This Task
A 4
B 7
C 6 A, B
D 5 C
E 6 D
F 7 E
G 8 E
H 6 F, G
49

480 minutes
Cycle time 9.6 minutes
50 units

Minimum number of stations


ti 49 51 . 6 stations
cycle time 9.6

Station 2
(7)
B

Station 1 Station 4 Station 5 Station 7 Station 8


(4) (5) (6) (7) (6)
A D E F H

(6) (8)
C G
Station 3 Station 6

49 minutes
Efficiency 0.638
8 stations 9.6 minutes*

or

Efficiency = 63.8%
* Longest operation time

9.9 (a)
A B C E

D F

G H

(b) There are multiple alternatives. Here is one that does not violate any procedures.

Station Tasks

Chapter 9: Layout Strategy 9


1 A, D
2 B, G
3 C, F
4 H, E

(c) Each alternative has an overall efficiency of 92.5%.

9.10 Performance Time Task Must Follow


Task (in minutes) This Task
A 1
B 3 A
C 2 B
D 4 B
E 1 C, D
F 3 A
G 2 F
H 5 G
I 1 E, H
J 3 I
25

400 minutes
Cycle time 6.67 minutes unit
60 units

Minimum number of stations


ti 25 3.75 or 4 workstations
cycle time 6.67

Note: Four stations with a 7-minute cycle time is possible. However, efficiency becomes

25
89.3%
47

and production drops to 57 from the required 60 units. One five-station solution (there are multiple
answers) is:

Station 2 (2)
Station 5
C
(1) (3) (1) (1) (3)
A B E I J

(4)
D Station 3

(3) (2) (5)


Station 1
F G H

Station 4

Theoretical:

10 Instructors Solutions Manual t/a Operations Management


25 minutes
Efficiency 0.749 75%
5 stations 6.67 minutes

Actual:

25 minutes
Efficiency 0.837 84%
5 stations 6.00 minutes

9.11 Performance Time Task Must Follow


Task (in minutes) This Task
A 1
B 1 A
C 2 A
D 1 C
E 3 C
F 1 C
G 1 D, E, F
H 2 B
I 1 G, H
13

(1) Station 3 (2)


B H
(1)
A (1)
(1)
I
D
(2)
C
Station 2
(3) (1)
Station 1
E G

Station 5
(1)
F
Station 4

13 minutes
Efficiency 0.78
5 stations 3.33 minutes

or Efficiency = 78%. Multiple layouts with this efficiency exist.

9.12 (a) Resolving Problem 9.11 with a production time of 300 minutes per day:

300 minutes
Cycle time 5 minutes unit
60 units

Minimum number of stations


ti 13 2.6 or 3 workstations
cycle time 5

Chapter 9: Layout Strategy 11


(1) (2)
B H
(1)
A (1)
(1)
I
D
(2)
C
(3) (1)
Station 1
E G
Station 2
Station 3

(1)
F

13 minutes
Efficiency 0.867
3 stations 5 minutes

or Efficiency = 86.7%. Multiple layouts with this efficiency exist.

(b) Resolving Problem 9.11 with a production time of 400 minutes per day:

400 minutes
Cycle time 6.67 minutes unit
60 units

Minimum number of stations


ti 13 195 . or 2 workstations
cycle time 6.675

(1) (2)
B H
(1) Station 3
A (1) (1)
D I
(2)
Station 1 C
(3) Station 2 (1)
E G

(1)
F

13 minutes
Efficiency 0.649
3 stations 6.67 minutes

or Efficiency = 64.9%. Multiple layouts with this efficiency exist.

operating time
9.13 Output
CT
min. cycle time = 3 minutes (Activity E time)
400
output 133.33 or 133
3

12 Instructors Solutions Manual t/a Operations Management


9.14 Performance Time Task Must Follow
Task (in minutes) This Task
A 0.1
B 0.1 A
C 0.1 B
D 0.2 B
E 0.1 B
F 0.2 C, D, E
G 0.1 A
H 0.1 G
I 0.2 H
J 0.1 I
K 0.2 F
L 0.2 J, K
M 0.1 L
1.8

5 hours 5 days 60 minutes hours 1,500


Cycle time = 0.5 minutes bottle
3,000 bottles 3,000

Minimum number of stations


ti 18.
3.6 or 4 workstations
cycle time 0.5
(0.1) Station 3
E
Station 4
(0.1) (0.1) (0.2) (0.2) (0.2) (0.2) (0.1)
A B D F K L M

(0.1)
(0.1) J
C
(0.2)
I
(0.1) (0.1)
Station 1 G H Station 2

18
. minutes
Efficiency 0.90
0.5 minutes 4 stations

or

Efficiency = 90%

9.15 Resolving Problem 9.14 with double the original demand:

5 hours 5 days 60 minutes


Cycle time 0.25 minutes unit
6,000 units

Minimum number of stations


ti
18
.
7.2 or 8 workstations
cycle time 0.25

Chapter 9: Layout Strategy 13


Station 6
(0.1)
E
Station 9
(0.1) (0.1) (0.2) (0.2) (0.2) (0.2) (0.1)
A B D F K L M
Station 1 Station 2 Station 7 Station 8 Station 10
(0.1) Station 5 (0.1)
C J
(0.2)
I
(0.1) (0.1)
Station 4
G H
Station 3

18
. minutes
Efficiency 0.72
0.25 minutes 10 stations

or Efficiency = 72%. Multiple layouts exist with the same efficiency.

9.16 Performance Time Task Must Follow


Task (in minutes) This Task
A 5
B 3 A
C 4 B
D 3 B
E 6 C
F 1 C
G 4 D, E, F
H 2 G
28

Minimum number of stations


ti
28
4 workstations
cycle time 7

The work activities may be grouped, however, into no fewer than five workstations without violating
precedence requirements.

(4) (6)
C E
Station 4
Station 1
(5) (3) (1) (4) (2)
A B Station 3 F G H

Station 5
(3)
D
Station 2

14 Instructors Solutions Manual t/a Operations Management


28 28
Efficiency 0.80
5 7 35

or

Efficiency = 80%

Several other balances are also possible. One of them is to place A alone, tasks B and C together, D
and F together, E by itself, and G and H together.

9.17 Performance Time Task Must Follow


Task (in minutes) This Task
A 13
B 4 A
C 10 B
D 10
E 6 D
F 12 E
G 5 E
H 6 F, G
I 7 H
J 5 H
K 4 I, J
L 15 C, K
97

25,200 seconds
Cycle time 18 seconds unit
1,400 units

Minimum number of stations


ti 97 5.4 or 6 workstations
cycle time 18

Station 1 Station 6
(13) (4) (10) (15)
A B C L

(12) Station 4 (7)


F I

Station 2
(10) (6) (6) (4)
D E Station 3 H Station 5 K

(5) (5)
G J

Chapter 9: Layout Strategy 15


Total idle time 11 seconds
97 seconds
Efficiency 0.898
6 stations 18 seconds

or

Efficiency 89.8%

9.18 There are three alternatives:

Station Alternative 1 Tasks Alternative 2 Tasks Alternative 3 Tasks


1 A, B, F A, B A, F, G
2 C, D C, D H, B
3 E F, G C, D
4 G, H E E
5 I H, I I

Each alternative has an efficiency of 86.67%.

OT 480
CT implies 3 , so output 160
Demand output

16 Instructors Solutions Manual t/a Operations Management