Appendix - A

DATA FOR IEEE-30 BUS TEST SYSTEM


The IEEE - 30 bus test system is shown in figure A.1. The system data is taken

from references [3]. The generator cost and emission coefficients, load, shunt capacitor

data and bansmission lines &reprovided in the Tabla A.1, A.2, A3 and k 4 respectively.
The cost coefficients of IEEE-30 bus system are slightly modified to incorporate non-

smooth fuel cost functions with ramp rate coefficients as given in Table A.5. The data is

on 100 MVA base. For all analysis on this system V,-, V,IPI,Olmm and $i- for bus i are

considered to be 0.9 p.u, 1 . I p.u., -45 degree and 4 5 degree respectively.

Table Al. Generator Cost and Eminion Coefnelents

13 I 0.00 I om^ - I 28 I 0.00 I 0.00


14 1 6.20 1 1.60 1 29 1 2.40 1 0.90
15 1 8.20 I 2.50 1 30 1 10.6 / 1.90

24
-
Fig. A.1. One line diagram IEEE-30 BPSSy~tem
Table A.4. Trrn~minlionLine Data
Table AS. Modified Generating units raflicienb with Ramp rate limib

an.
No. ~~rnlll P~.UI ah bi 4 dl 4 K l'd URI DRI
1 50 63.750 0 3.060 87.5 0 0 0 135 65 85
63.750 82.875 0 0.000 0.0 0 0 282
82.875 93.750 0 8.920 -457 0 0 0
93.750 157.500 0 3.700 32 0 0 0
157.500 176.625 0 0.000 0 0 0 615
176.625 200 0 7.700 -745 0 0 0
2 25 43 0.010 0.300 35 0 0 0 65 12 22
43 63 0.020 0.600 60 0 0 0
3 20 49 0.070 0.095 45 40 0.08 0 35 12 15
4 15 30 0.090 0.025 30 30 0.09 0 25 08 16
5 13 28 0.025 3.000 0 0 0 0 20 06 09
6 14 35 0.025 3.000 0 0 0 0 30 08 16
Appendix - B
DATA FOR INDIAN UTILITY-
62 BUS TEST SYSTEM
The Indian utility- 62 bus test system is sbom in figure B.I. The system data is

taken from reference [I 141. The generator cost and emission coefficients, load, sites of

the buses and transmission line data are given in the Tables B.1, B.2, 8.3 and B.4

-
respctivcly. The cost coefficients of Indian utility 62 bus system are slightly modified

to inwrporate non-smooth fud wst functions with m p rate coefficients are given in

Table B.S. The data is on 100 MVA base. For all analysis on this system Vim, V,-,

0,- and +am' for bus i are considered to be 0.9 P.u., 1 .I P.u., 45 and +45 degree

Table B.1. Generator Cost and Emirdon Coefficients


Table 8.2. h a d Bus Data
Table B3. Sita of different buses in Tamilrudu State
Table B.4. Trnnsrniraion Line Data
...
Table B.4. Cootd
-
Fig. B.I. One line diagram Indian Utility-62 Bus System
Table BS. Modifled Generating units ewMdents with Ramp rate limits

Gen.
No. P d ~ Prrux ai h y di K P"d URI DR
1. 100 300 0.0097 6.800 119 90 0.72 0 250 95 150
2. 120 438 0.0055 4.000 90 79 0.05 0 300 138 180
3. 100 250 0.0055 4.000 45 0 0 0 300 100 200
50 400 0.0065 3.000 25 0 0 0
4. 8 25 0.0025 0.850 0 0 0 0 20 5 12
5. 50 63.750 0 5.280 0.891 0 0 0 120 80 90
63.750 82.875 0 0 0 0 0 337
82.875 93.750 0 15.296 -930 0 0 0
93.750 157.500 0 6.107 -68 0 0 0
157.500 176.625 0 0 0 0 0 893
176.625 200 0 12.264-1272 0 0 0
6. 150 300 0.0080 3.500 110 0 0 0 300 100 150
300 400 0.0060 4.800 85 0 0 0
7. 50 63.750 0 5.439 21 0 0 0 130 70 100
63.750 82.875 0 0 0 0 0 368
82.875 93.750 0 15.790 -940 0 0 0
93.750 157.500 0 6.330 -53 0 0 0
157.500 176.625 0 0 0 0 0 943
176.625 200 0 12.770 -1312 0 0 0
8. 100 500 0.0075 6.000 88 50 0.52 0 600 400 500
9. 200 600 0.0085 6.000 55 0 0 0 500 200 300
10. I5 40 0.0090 5.200 90 0 0 0 30 10 15
11. 50 I50 0.0045 1.600 65 0 0 0 100 55 85
12. 25 75 0.0025 0.850 78 58 0.02 0 50 25 25
13. 50 63.750 0 2.550 49 0 0 0 I20 80 90
63.750 82.875 0 0 0 0 0 210
82.875 93.750 0 7.137 -381 0 0 0
93.750 157.500 0 3.060 0.815 0 0 0
157.500 176.625 0 0 0 0 0 482
176.625 200 0 6.520 669 0 0 0
14. 0 95 0.0045 1.600 85 0 0 0 50 40 45
15. 20 220 0.0065 4.700 80 92 0.75 0 125 95 105
16. I5 80 0.0045 1.400 90 0 0 0 55 25 40
17. 15 80 0.0025 0.850 10 0 0 0 55 25 40
18. 50 230 0.0045 1.600 25 0 0 0150 80 100
19. 400 500 0.0080 5.500 90 0 0 0 550 100 150
500 600 0.0070 6.000 75 0 0 0
Appendix - C
DATA FOR INDIAN UTILITY-
146 BUS TEST SYSTEM
-
The Indian utility 146 bus test system is shown in figure C.1.The system data is

taken from reference [I 141.The generator real and reactive power limits, load, sits of

the buses and transmission lines data are given in the tables C.1,C.2,C.3 and C.4

respectively. The data is on 100 MVA base. For all analysis on this system v,"'", Vim,

+,mand 9,- for bus i an considerad to be 0.9 p.u., 1.1 p.u., -45 degree and +45 degree

respectively.

Table C.1. Generator Real and Reactive Power Limits

- Bus Pi" Pi"' QM QiM '

No. 00(MVAr) (MVAr)


1. 0 300 62 248
2. 0 100 0 50
3. 100 500 100 420
4. 0 100 0 50
5. 0 100 10 M
6. 0 200 25 100
7. 0 100 0 50
8. 0 100 0 50
9. 0 100 0 M
10. 0 100 0 50
11. 50 300 0 I 50
12. 60 360 50 240
13. 0 200 0 100
4 0 200 0 100
Table C.2. Load Bus Data
Table C.2. Cond...
131

Table CJ. Sita of different bus- in Tamllmdu State

( 37. 1 LOMPH 4 1 74. 1 AUjRKOlL 1 11 1. 1 K.KURUCHI I


132

Table C.4. Trnnnmission Line Data


Tsble CA. Contd...
Table CA. Contd...
Table C.4. Contd...
I

-
Fig. C.1. One line diagram Indian UtIUty - 146 bus System