Professional Documents
Culture Documents
Q= 90 l/s
hfa = 2V²/2g
hfb = 3V²/2g
hsa = 0.05V²/2g 4375
hsb = 0.05V²/2g
Øa = 12 "
Øb = 10 " RESERVORIO
4329
4328.1
RIO
4326.9
Aa = 0.072965877 Va = 1.2334532759
Ab = 0.0506707479 Vb = 1.7761727173
hfa = 0.1550873582
hfb = 0.3215891459
hsa = 0.003877184
hsb = 0.0080397286
Hb(85%) = 46.49
POT bomba = 66 CV
Ø(m) = 30
ademas: H/D = 0.5
H= 15 m
V tanque = 10602.9 m³
solo van llenos los 3/4 del volumen total:
V tanque a llenar = 7952.175 m³