You are on page 1of 1

Date : 30/10/2017

GRISSIK-PERTAGAS ULTRASONIC CUSTODY METERING AND PIPELINE TIE IN PROJECT


Report No. : 001/CRBI/C0PI-PPS/X-2017

CHECK LIST REINFORCING BAR INSTALLATION Project No. : CS-17343902

Employer : CONOCO PHILIPS Location : Gudang Graha PT. PPS

Reference Drawing :

RESULT
NO ITEM TO CHECK DATE & SIGN REMARKS
YES N/A

1. Size / Length / Quality

2. Bending Radius / Shape

3. Spacing B/W Re-bars

4. Lap Splacing (Length / Location)

5. Extra Length

6. Hoop / Stirr up (Shape / Location / Pitch / Hook)

7. Starter Bar (Shape / Length/ Location)

8. Concrete Cover

10. Reinforcing for Opening

11. Footing/ Pedestal

12. Quality of Cleaning

Remarks :

Prepared by Checked by, Witnessed by,


CONSTRUCTION PPS QC PPS CPGL

Print Name

Signature

Date