Professional Documents
Culture Documents
MAINTENANCE DEPARTMENT
MAINTENANCE DEPARTMENT
PREPARED BY
MOHAMAD FARID BIN KAMMANIS
MAINTENANCE OFFICER CUM PRODUCTION OFFICER
ZARA FOODSTUFF INDUSTRIES SDN. BHD.
MAINTENANCE DEPARTMENT
Cc : PA, PD
1. Maintenance progress :-
3. Production (03/04/2013)
i. Line A The marking head at laser position En. Akmal Zahid
- Linx SL501 Scribing X Y burnt.
Laser - Wait the quatation for repair.
4. Production (04/04/2013)
i. Line A Changing a new 3 set knife. En. Fendi
- GSL 400 Cap seal.
6 Production (06/04/2013)
i. Line A Low quality bottles. Sprocket size En. Fendi
- UNIBLOC 21 malfunction.
- Changing a new sprocket size
25.
8. Production (09/04/2013)
i. Line B Changing the 2 set filter soy sauce. Workers
- Auto Filler Vega 20 - Service
9. Production (10/04/2013)
i. Line A Sprocket size 21cm malfunction. En. Akmal Zahid
- Cap Seal GSL 400 Low quality bottles. En. Rafid
- Changing a new sprocket size
21cm.
- Cut 3 point chain conveyer
because bent.
13 Production (15/04/2013)
i. Line A Repair. En. Akmal Zahid
- Unibloc - The shaft for capper
malfunction. Adjust the guide
shaft and high.
17. W.W.T.P (19/04/2013) Change a new pump on first main En. Akmal Zahid
hold. The old pump wire overload. En. Rafid
- Service
- Tray Packer Modification the guide to give the En. Akmal Zahid
space. En. Fendi
En Rafid
……………… ……………..
(En. Mohamad Farid Bin Kammanis) (En. Mohd Nazri Bin Ismail)
Maintenance Officer Cum Production Office QA Manager