Professional Documents
Culture Documents
Reposición de materiales y equipos (Estación de bombeo) 0.00 0.00 0.00 0.00 0.00 25,000.00 0.00 0.00 0.00 0.00 25,000.00 0.00 0.00 0.00 0.00 25,000.00 0.00 0.00 0.00 0.00 25,000.00
C) TOTAL COSTOS CON PROYECTO 210,022.37 13,350.00 13,643.70 13,943.86 14,250.63 39,564.14 14,884.55 15,212.01 15,546.68 15,888.70 41,238.25 16,595.50 16,960.60 17,333.73 17,715.07 43,104.80 18,503.11 18,910.18 19,326.20 19,751.38 45,185.91
C) TOTAL COSTOS CON PROYECTO 143,607.75 11,313.56 11,562.46 11,816.83 12,076.80 33,350.89 12,614.03 12,891.54 13,175.15 13,465.00 34,769.64 14,063.98 14,373.39 14,689.60 15,012.77 36,351.46 15,680.60 16,025.57 16,378.14 16,738.46 38,115.10