Form No : 02 FIRE HIDRAND

Test No. : 14/BA/STC-MAK/MNC/II/14


Project : MNC FINANCIAL CENTER
Date Ref : 18-Mar-14

BERITA ACARA TEST & COMMISSIONING ELECTRIK FIRE PUMP.

Location : PUMP ROOM. Equipment No : ELECTRIC FIRE PUMP.


Level BASEMENT 2. Service :
Room : PUMPROOM Drawing Ref : ME-F-R-POMPA-MNC 01.R3

ELECTRIC FIRE PUMP

Product By : CMG Product by KIRLOSKAR

Name : ELECTRIC FIRE PUMP. Kap 750 USGPM

Type : SGA355MB-2 Head 180 m

Serial No. : 839044/010-2 Type Horisontal Spilt Case

Rpm : 2982- 3578. Model IHT 12EA

KW : 250 KW S/D 275 KW.

Discharge : 171 m3/h.

Speed : 2960 rpm

Total Head : 180 mtr

Starting Pressure : 10 kg/cm2

Stand by Pressure : 16 kg/cm2

IP ; 55

TEST RESULT

- Unit Cleaning : Yes No

- Bolt & Spring monting : Yes No

- System Grounding : Yes No

Pondasi Pompa ; Yes No

Starting.awal jockey pump ; 14 kg/cm2

Start stop akhir jockey pump ; 16 kg /cm2

Starting awal elektric fire pump ; 10 kg/cm2

Starting awal Diesel fire pump ; 8 kg/cm2

Test Result Test Equipment Remarks & Comments

: Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. BUILDING MANAGEMENC

Nama/ Tanda tangan Nama/ Tanda tangan Nama / Tanda tangan


Form No : 02 FIRE HYDRAND
Test No. : 15/BA/STC-MAK/MNC/II-14
Project : MNC FINANCIAL CENTER
Date Ref : 18-Mar-14
BERITA ACARA TEST & COMMISSIONING DIESEL FIRE PUMP.

Location : PUMP ROOM. Equipment No : DIESEL FIRE PUMP.


Level BASEMENT 2. Service :
Room : PUMPROOM Drawing Ref : ME-F-R-POMPA-MNC-01.R3

DIESEL FIRE PUMP

Product By : IVECO Product By : KIRLOSKAR


Name : DIESEL FIRE PUMP.. Kap : 750 USGPM
Type : N67 MNF4210. Head : 180 M
Serial No.Engine : 978915 Model : i HT .12EA.
Speed : 2800 rpm
Total Head. : 186 mtr.
Discharge : 171 m3/h
Starting pressure setting ; 8 kg/cm2.
Stanby Pressure ; 16 kg/cm2

TEST RESULT

- Unit Cleaning : Yes No

- Bolt & Spring mounting : Yes No

- System Grounding : Yes No

Pondasi Pompa ; Yes No

Working Pressure Aktual ; 10 kg/cm2

Starting.awal jockey pump ; 14 kg/cm2

Start stop akhir jockey pump ; 16 kg /cm2

Starting awal elektric fire pump ; 10 kg/cm2

Starting awal Diesel fire pump ; 8 kg/cm2

Test Result Test Equipment Remarks & Comments

: Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. BUILDING MANAGEMENC

Nama/ Tanda tangan Nama/ Tanda tangan Nama / Tanda tangan


Form No : ....... FIRE HIDRAND

Test No. : .26./BA/STC-MAK/MNC/IV/-15


Project : MNC FINCENT
Date Ref : 9-Apr-15

BERITA ACARA PERBAIKAN

Location BESEMENT SATU


Level BASEMENT SATU.S/D LT 22MEZANINE
Room PUMP ROOM

BERITA ACARA PERBAIKAN.

Telah dilaksanakan perbaikan pengecatan panel DP di PUMP ROOM. Bahwa: Panel DP tersebut
sudah diperbaiki Pengecatanya panel yang berkarat secara baik dan benar.

Demikian berita acara ini dibuat untuk dapat dipergunakan sebagaimana mestinya

Test Result Test Equipment Remarks & Comments

√ : Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. PT.MNC LAND TBK

Ignatius Rakim Ihtiarso Rizal Kurnia Otto Prayitno


Project Manager Building Management Project Manager
Form No : ....... FIRE HIDRAND

Test No. : .25./BA/STC-MAK/MNC/IV/-15


Project : MNC FINCENT
Date Ref : 9-Apr-15

BERITA ACARA PERBAIKAN

Location BESEMENT SATU


Level BASEMENT SATU.S/D LT 22MEZANINE
Room PUMP ROOM

BERITA ACARA PERBAIKAN.

1 Telah diselesaikan Trouble Tamper switch dan Flows witch di lantai GF,2,3,4,15,16,17,18. bahwa : trouble tersebut
sudah diselesaikan dengan baik dan sudah difungsikan.

2 Telah diperbaiki VALVE BY PHAS di diesel fire pump yang bocor.bahwa valve tersebut sudah diperbaiki dengan
baik dan benar serta sudah di fungsikan kembali.

Demikian berita acara ini dibuat untuk dapat dipergunakan sebagaimana mestinya

Test Result Test Equipment Remarks & Comments

√ : Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. PT.MNC LAND TBK

Ignatius Rakim Ihtiarso Rizal Kurnia Otto Prayitno


Project Manager Building Management Project Manager
Form No : ....... FIRE HIDRAND

Test No. : .20./BA/STC-MAK/MNC/III/-15


Project : MNC FINCENT
Date Ref : 26-Mar-15

BERITA ACARA PEMASANGAN

Location BASEMENT SATU


Level BASEMENT SATU.
Room PUMP ROOM

BERITA ACARA PEMASANGAN HOUR COUNTER

Sudah dilakukan pemasangan HOUR COUNTER di DIESEL FIRE PUMP pada lokasi Pump Room
hour counter tersebut telah dipasang dan ditest dengan disaksikan oleh pihak Building Management
dengan hasil baik serta sudah difungsikan.

Demikian berita acara ini dibuat untuk dapat dipergunakan sebagaimana mestinya

Test Result Test Equipment Remarks & Comments

√ : Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. PT.MNC LAND TBK

Ignatius Rakim Ihtiarso Rizal Kurnia Otto Prayitno


Project Manager Building Management Project Manager
Form No : ....... FIRE HIDRAND
Test No. : .09./BA/STC-MAK/MNC/III/-15
Project : MNC FINCENT
Date Ref : 15-Mar-15

BERITA ACARA SETTING PRV HYDRAND LOW ZONE

Location BASEMENT SATU


Level BASEMENT SATU.
Room PARKING AREA

BERITA ACARA SETTING PRV HYDRANT LOW ZONE LT B2 S/D LT 4.

Sudah dilakukan setting PRV Lantai basement satu dari tekanan awal 6,5 bar Disetting menjadi 8 bar.
jadi tekanan kerja hydrant saat ini dilantai empat ( 4 ) menjadi enam ( 6 ) bar.
demikian juga untuk tekanan kerja hydrant dilantai dua belas ( 12 ) tekanan sudah sesuai yaitu enam koma emp
empat bar ( 6,4 ) bar
Dengan demikian tekanan pipa hydrant dilantai Empat dan di lantai Dua belas sudah sesuai rekomendasi
dari DPK .,MINIMUM 4,5 BAR dan MAKSIMUM 7 BAR.

Test Result Test Equipment Remarks & Comments

√ : Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. PT.MNC LAND TBK

Ignatius Rakim Ihtiarso Rizal Kurnia Otto Prayitno


Project Manager Building Management Project Manager
Form No : LIFT

Test No. : .10./BA/STC-MAK/MNC/III/-15


Project : MNC FINCENT
Date Ref : 15-Mar-15

BERITA ACARA SETTING LIFT EXECUTIVE

Location LIFT EXECUTIVE


Level LANTAI DASAR
Room LOBBY GROUND FLOOR

BERITA ACARA SETTING LIFT VIP STANBAY DI GROUND FLOOR

Telah dilaksanakan setting LIFT VIP untuk selalu stanbay di lantai dasar, bila tidak ada pemanggilan
dari jedah waktu yang ditentukan bila tidak ada pemanggilan dari lantai lantai lain 1,5 minute-
lift akan turun kelantai dasar.setting dilaksanakan oleh PT KONNE

Demian berita acara ini di buat untuk bisa dipergunakan sebagai mana mestinya.

Test Result Test Equipment Remarks & Comments

√ : Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. BUILDING MANAGEMENC

Ignatius Rakim Ihtiarso Rizal Kurnia Otto Prayitno


Project Manager Building Management Project Manager
Form No : LIFT

Test No. : .11./BA/STC-MAK/MNC/III/-15


Project : MNC FINCENT
Date Ref : 15-Mar-15

BERITA ACARA SERVICE LIGTHING CAR LIFT .

Location LIFT EXECUTIVE


Level LANTAI DASAR
Room LOBBY GROUND FLOOR

BERITA ACARA SERVICE LIGTHING CAR LIFT


Telah diperbaiki lampu lift /LIGTHING CAR LIFT dengan mengganti lampu jenis T5-8 watt
perbaikan tersebut telah dilakukan oleh PT.KONNE.dari perbaikan tersebut sehingga semua-
lift passenger sudah tidak ada lagi ligthing car lift yang mati.

Demian berita acara ini di buat untuk bisa dipergunakan sebagai mana mestinya.

Test Result Test Equipment Remarks & Comments

√ : Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. BUILDING MANAGEMENC

Ignatius Rakim Ihtiarso Rizal Kurnia Otto Prayitno


Project Manager Building Management Project Manager
Form No : LIFT

Test No. : .12./BA/STC-MAK/MNC/III/-15


Project : MNC FINCENT
Date Ref : 15-Mar-15

BERITA ACARA TEST UPS SOUND SYSTEM

Location RUANG CONTROL.


Level LANTAI DASAR
Room CONTROL.

BERITA ACARA TEST UPS SOUND SYSTEM


Telah dilaksanakan test sound system dengan menghidupkan semua speaker baik wall speaker
maupun ceilling speaker
dengan menghidupkan semua sound system tersebut ,setelah diukur kebutuhan listrik hanya-
sampai 4,6 ampere.setelah kami mematikan listrik ternyata UPS TIDAK MENUJUKAN FOUL.
Setelah kami memeriksa capasitas UPS SEBESAR 9,8 ampere.
dengan kata lain UPS Masih mampu memikul beban tersebut.ups masih normal.

Demian berita acara ini di buat untuk bisa dipergunakan sebagai mana mestinya.

Test Result Test Equipment Remarks & Comments

√ : Approved

: Approved as Note

: Repeat Test

Tested by, Checked and Approved by, Checked and Approved by,
STC MULTIKON JO. MNC LAND Tbk. BUILDING MANAGEMENC

Ignatius Rakim Ihtiarso Rizal Kurnia Otto Prayitno


Project Manager Building Management Project Manager