You are on page 1of 1

Project: ETAP Page: 1

Location: 16.1.1C Date: 01-12-2018

Contract: SN: TATASTEEL6

Engineer: Revision: Base


Study Case: SC
Filename: TCC SLD 120118 Config.: Normal

Load Terminal Fault Short-Circuit Current

Feeder Z (ohm)
Load I"k (kA)
Heater &
Bus ID ID Type kV HP/kW kVA Cable R Cable X System Load Total

* The terminal short-circuit current of the single-phase loads is calculated in the Panel/UPS/1Ph System Device Duty calculation.

The terminal short-circuit current of the three-phase loads is calculated in the three phase Device duty calculation.

You might also like