01-09-2014. Comments On Assemble Drawing of T1A, T1C
01-09-2014. Comments On Assemble Drawing of T1A, T1C
To Copy to,
Project Director
Managing Director, PGCB
Barisal – Bhola Project
Power Grid Company of Bangladesh Limited √ Executive Director (P & D), PGCB
NLDC Complex Aftabnagar South Badda,
Dhaka-1212 √ Chief Engineer (P & D/Project), PGCB
Kind Attn: Mr.
√ Shandong Taikai Power Engineering Co.,Ltd
√ Master File
Dear Sir,
We are pleased to enclose the following documents for the purpose indicated below:
Issued by:
(1)
In case of any modification other than those desired are carried out, the same shall be
highlighted clearly in the Drawing/Document with full justification thereof and resubmitted SUKANTO LAL NAG
for approval. Superintending Engr.
(2)
Approval/Comments/Information conveyed herein neither relieves the contractor of his
(Civil Design & Q/C),
contractual obligation and his responsibilities for correctness of dimensions, material of PGCB, Dhaka
constructions, weight, quantities, design details, assemble fits, performance particulars
and conformity of the supplies with the Statutory Laws of Bangladesh as may be Our Ref: 04-PGCB/SE(Civil)/Design & QC/2014/15
applicable, nor does it limit the Employer’s right under the contract.”
Date: 01/09/14
For information
(FI)
Received by Date
Note:
(1)The above paragraph shall be added if the status of the document is C/RR/FI.
(2)The above paragraph shall be added if the status of the document is A or C.
04-PGCB/SE(Civil)/Design & QC/2014/15 Date: 01 September, 2014
Annexure-1