The document summarizes off-spec material production and inventory status for LABSA 96% and Surfactant plants over two dates. On May 15th, 3 drums of LABSA 96% were produced due to a power failure. On May 16th, 3 more drums were produced from shifts A and B, and 4 drums of Surfactant were produced from shift B. The inventory status shows the opening and ending stock levels from May 6th to September 15th, including off-spec materials produced and consumed.
The document summarizes off-spec material production and inventory status for LABSA 96% and Surfactant plants over two dates. On May 15th, 3 drums of LABSA 96% were produced due to a power failure. On May 16th, 3 more drums were produced from shifts A and B, and 4 drums of Surfactant were produced from shift B. The inventory status shows the opening and ending stock levels from May 6th to September 15th, including off-spec materials produced and consumed.
The document summarizes off-spec material production and inventory status for LABSA 96% and Surfactant plants over two dates. On May 15th, 3 drums of LABSA 96% were produced due to a power failure. On May 16th, 3 more drums were produced from shifts A and B, and 4 drums of Surfactant were produced from shift B. The inventory status shows the opening and ending stock levels from May 6th to September 15th, including off-spec materials produced and consumed.
Off Spec Material Production Status Off Spec Material Inventory Status
Off spec Material Production Date 15-May-18 16-May-18
Material Name LABSA 96% LABSA 96%
Plant LABSA 96% Surfactant LABSA 96% Surfactant
LABSA 96% & Surfactant Shift A A&B A A&B Shift A =1 , Shift B = 3 Shift A =1 , Shift B = 3 Material quantity 3 drums (540 kg) 3 drums (540 kg) 4 drums 4 drums (720Kg) (720Kg) No intimation on time No intimation on time Off spec Material Result: Standard Klett= 54, Acid Value = No tesrting is Klett= 54, Acid Value = 60.5 No tesrting is Values = (Klett=Max. 45, Acid Value = 176-184) 60.5 conducted conducted Grade of Material (Reprocess "B" OR Scrap "C") B B B B Shift A= Shutdown of Plant down due to Power Shift A= Shutdown of Shut down due to Power Reason of receiving off spec material Shift B = Start up of Shut Plant Shift Failure Failure Plant B = Start up of Plant OSM/SR/A/E-12/01 OSM/LB-96/A/E-12/01 OSM/SR/A/E-12/01 Lot # OSM/LB-96/A/E-12/01 OSM/SR/B/E-12/01-03 OSM/SR/B/E- 12/01-03 Due Date for OSM Consumption 14-May-18 14-May-18 f Spec Material Inventory Status 6/May/18 7/May/18 8/May/18 9/May/18 10/May/18 11/Sep/18 12/Sep/18 13/Sep/18 14/Sep/18 15/Sep/18 Opening Stock 430 430 430 430 430 423 418 420 = Offspec Produced in LABSA Plant 3 6