INSTALLATION CHECK LIST FOR HVAC CONTROL PANEL

DRAWING NO. REV.


SYSTEM LOCATION
DESCRIPTION

Sr.
Description Yes No Remarks
No.

1 Check the panel against approved submittal.

Confirm the size, location, orientation of panel for easy


2
accessibility for operation/maintenance.

Confirm the mounting arrangements against manufacturer’s


3
recommendation.
Check that proper, neat and clean/clear entry of cables/wires
4
is available.

Check all wiring and internal installation are mounted and


5
labeled correctly

Check all cable glands secure earth rings fitted, bonded to


6
the Main Earthing Conductor.

7 All Cables are identified.

8 Panel identification labels fixed.

All neutral and earth cables identified to correspond with


9
appropriate live conductor.

All Fuses, MCBs, MCCBs are of correct rating and type and
10
are properly identified.

DOCUMENT NUMBER ISSUE PAGE NO. DATE

BILT/J-225/QAP/AC-08 REV. 0 1 of 2 16-09-2009


Bill PROJECT : ONE & ONLY ROYAL MIRAGE – PHASE III

INSTALLATION CHECK LIST FOR HVAC CONTROL PANEL

DRAWING NO. REV.


SYSTEM LOCATION
DESCRIPTION

11 All cable termination, terminal lugs are proper type and


secure with identification

Check earthing of panel.


12
Sr.
Description Yes No Remarks
No.
Check wiring to DDC controller.
13

CONSULTANTS COMMENTS:

ENGINEER/SUPERVISOR (BILT) NAME SIGN.

QA / QC ENGINEER (BILT) NAME SIGN.

CONSULTANT/CLIENT NAME SIGN