C&S Electric Ltd.

C-1341 -0 712-164 32

Responsible department: Take over department: Revision: Doc. type: File no.:

Design 0 CY
Prepared: Checked: Approved: Language: Page:

2012.07.14, RS 2012.07.14, PSK 2012.07.14, KV en 1/9


Valid for: Derived from: Replaces: Data set:

Khulna

Khulna 150MW PEAKING POWER PLANT PROJECT (Package 1A)

Generator output / Neutral Point


Cubicle

Inspection & Test Instruction

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(1)
Revision: Doc. Type: Language: Page:
C-1341-07 12-164 32
0 CY en 2/9

Revision History

Document
Revision Content of Change Date
Pages total :
0 First issue for Approval 14.07.12 9

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(2)
Revision: Doc. Type: Language: Page:
C-1341 -0 712-164 32
0 CY en 3/9

Contents
1 Safety Information ..........................................................................................5
1.1 Definition of symbols ........................................................................5
1.2 General safety information ...............................................................6

2 INSPECTION & TEST INSTRUCTION .............................................................7


2.1 Dry Power Frequency Voltage Withstand Test .............................7
2.2 Continuity Test ..................................................................................8
2.3 Insulation Resistance Test ...............................................................9

Figures
Figure 1 : Line diagram for Dry Power Frequency voltage withstand Test ......7
Figure 2 : Line diagram for Continuity Test .....................................................8
Figure 3 : Line diagram for Insulation Resistance Test ...................................9

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(3)
Revision: Doc. Type: Language: Page:
C-1341 -0 712-16 432
0 CY en 4/9

Additional Documents
Document No Document Name
C-1341-0312-15966 General arrangement drawing.
C-1341-0312-15969 Control schematic diagram
C-1341-0312-15968 Standard component drawings of
Generator output / Neutral point cubicle.
C-1341-0712-16429_sci Commissioning Manual

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(4)
Revision: Doc. Type: Language: Page:
C-134 1-0712-16 432
0 CY en 5/9

1 SAFETY INFORMATION
1.1 Definition of symbols
DANGER indicates an imminently hazardous situation which, if not avoided, will
result in death or serious injury. This signal word is to be limited to the most
extreme situations.

DANGER
Type/Source of Hazard
Hazard consequences
 Steps to avoid the hazard.

WARNING indicates a potentially hazardous situation which, if not avoided, could


result in death or serious injury.

WARNING
Type/Source of Hazard
Hazard consequences
 Steps to avoid the hazard.

CAUTION indicates a potentially hazardous situation which, if not avoided, may


result in minor or moderate injury. It may also be used to alert against unsafe
practices.

CAUTION
Type/Source of hazard
Hazard consequences
 Steps to avoid the hazard.

DAMAGE information not relevant for the safety of personnel but pointing out
possible damage to the machine is depicted as shown below.

CAUTION
Information pointing out possible damages to the Machine.

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(5)
Revision: Doc. Type: Language: Page:
C-13 41-071 2-16432
0 CY en 6/9

1.2 General safety information


WARNING
High voltage/Electrical shock
Can result in serious injuries or death
 Don’t touch live parts of the electrical installation.

Intended use
 Do not operate the NP Cubicle beyond the intended use and
the intended operating conditions. Adhere to the
performance data within this Inspection & Test Instruction
documentation set.
 Rebuilding, alterations and additions must not be done
without agreement of C&S, especially if safety and
functionality is concerned.
In case of non-compliance with the requirements mentioned above
C&S shall not be responsible for insufficient functioning, system
malfunction or other damages. Any non-compliance will also void or
abate C&S ‘s responsibility under the warranty provisions.

Inspection & Test Instruction Personnel


Only qualified and authorized personnel may Inspection & Test
Instruction the NP Cubicle equipment .
The personnel must have read the Inspection & Test
Instruction documentation set. The safety information in this
documentation set is of special importance.
The personnel must be familiar with and follow the national
relevant stipulations and accident prevention regulations.
The personnel must immediately notify the responsible safety
inspector of any irregularities or safety risks.

Note
Adhere also to safety markings on the equipment itself.

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(6)
Revision: Doc. Type: Language: Page:
C-134 1-0712-16 432
0 CY en 7/9

2 INSPECTION & TEST INSTRUCTION


Generator output / Neutral Point Cubicle (NPC)is intended to house phase &
neutral busbars that serve as interconnection between the generator terminals and
the isolated phase busduct.
NPC is being a static electrical equipment, before commissioning .
Following Inspection & Test Instruction shall be followed as defined bellow.

2.1 Dry Power Frequency Voltage Withstand Test


2.1.1 Purpose
Dry Power frequency Voltage withstand test is carried out to check the
dielectric strength between enclosure & conductors.

2.1.2 Instruments Used


HV Testing Kit 0-75kV.

2.1.3 Procedure
 The test voltage shall be applied between each phase and earth in turn
with remaining phases earthed.
 The Voltage shall be increased from its initial value (zero) to test value and
maintained for one minute. During the test one pole of testing
transformer shall be connected to earth and other to the frame of busbar
enclosure.
 The test voltage being power frequency AC for 1 minute.

Connrcting Wire

Enclosure

Power Gen

Conductor

Earthed

Figure 1 : Line diagram for Dry Power Frequency voltage withstand Test

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(7)
Revision: Doc. Type: Language: Page:
C-13 41-071 2-16432
0 CY en 8/9

2.2 Continuity Test


2.2.1 Purpose
To check the electrical continuity of wirings & equipments

2.2.2 Instruments Used


Multi Meter

2.2.3 Procedure
Connect the prove of the multi meter to the equipment or wiring to check the
continuity.

Equipments
(CT,VT,NGR etc.)

Multi meter

Probe

Figure 2 : Line diagram for Continuity Test

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.

(8)
Revision: Doc. Type: Language: Page:
C-134 1-0712-16 432
0 CY en 9/9

2.3 Insulation Resistance Test


2.3.1 Purpose
To check the insulation resistance of the insulating material.

2.3.2 Instruments Used


Mega Ohm Meter (500 V / 1000V)

2.3.3 Procedure

 Connect proves of the mega ohm meter between the conductor and the
enclosure.
 Select the voltage range i.e. 500V for the measurement of insulation resistance
of the equipment which are operation on 240V system. Select
 Select the voltage range i.e. 1000V for the measurement of insulation
resistance of the equipment which are operation on 15kV system.

Enclosure

Mega Ohm Meter

Conductor

Probe

Figure 3 : Line diagram for Insulation Resistance Test

All rights reserved. Reproduction, use, distribution or disclosure to third parties without prior written permission is strictly prohibited.
© 2012 C&S Electric Ltd., IN-New Delhi.