Professional Documents
Culture Documents
r 2
r 1 = 500 ft
Fault
Well 2
1
400 ft 400 ft
390 ft 410 ft
10 ft 10 ft
390 ft
r P1 P2 r
Well 2 Well 3
LEASE A LEASE B
800 ft
Well 1
2. Compute the flow rate per foot of lease for point P on the lease line which is on a
line joining well 2 and 3 as shown in Fig. 2. The lease line is 2640 ft long. Wells
1, 2 and 3 have been producing for 300, 200 and 250 hours at a constant flow
rate of 100, 250 and 200 STB/D, respectively. Other information is given as
follows: