Safety Inspection Report

Date of
Project Site: The Riviera at Puri, Jakarta 24 Oktober 2018
Inspection:

KLL (I):
Type of Inspected
WSH Safety Unit Visit Andry (WSH) – KLL
Inspection: by:
Lukman (Safety SPV)
Assessment Ega (SO) – PT. KCBM
B
Rating:

S/N Location of Description of Positive Photo of


Finding Finding Finding
1 N.A. N.A.

Corrective
Location Description of Photo of Corrective Closure
S/N Photo of Finding Action Taken /
of Finding Finding Action Taken Date
Action by
1 Work Site Belum terpasang Pemasangan
railing pada area railing pada area
void lantai 1. void dan tangga

[1]

2 Kabel listrik tidak Kabel diletakan di


terpasang pada tiang listrik
tiang.

[4]

3 Work Site Tumpukan


material kayu tidak Sampah bekas
tertata rapi. bongkaran sudah
dibuang

[13]