Professional Documents
Culture Documents
UC-DS-NAV213_EPLAN1G Page 1 of 3
Developer Document Reviewer Programmer
180 minutes
Duration Briefing 10 minutes; Preparation 5 minutes; Execution 60 minutes; Debriefing 105
minutes ( for feedback and redo of the exercise for mastery).
Competence A-II/1 F1.C1: Plan and conduct a passage and determine position
Ability to determine the ship’s position by use of:
.1 landmarks;
K. U. Ps .2 aids to navigation, including lighthouses, beacons and buoys
.3 dead reckoning, taking into account winds, tides, currents and
estimated speed
At the end of the exercise the students must be able to obtain a ship position by
Exercise Outcome
running fix (R.F) method without the effect of tidal stream
UC-CONTROLLED DOCUMENT 1 of 3
Parallel ruler/triangle rulers
Chart no.4
Technical compass
The practical exercise shall be carried out and performed individually in their
Condition home. The student must demonstrate the required exercise outcome according
to performance standard within time prescribed. To demonstrate the required
outcome, the student must be able to perform the criteria set out.
Scenario At 1030H the ship is on course 220°T x 10 knots, with the use of visual method
the OOW observed Agio Pt. lighthouse which bears 030⁰R after an hour the
Description same object was observed and it is abeam to starboard.
1. Through video conference. Conduct briefing as per briefing guide check list.
2. Check the LMS if the students can view the Exercise Plan.
Instructor’s Actions
3. Check the materials of the students if available and ready.
4. Conduct debriefing as per debriefing guide check list.
1. Ensure that intended exercise plan and the attached documents were all
downloaded
2. Ensure that other materials required are complete before accomplishing
the exercise.
Student Tasks
3. Correctly accomplished the criteria required in the exercise.
4. Complete the exercise in the specified time.
5. Send your recorded demonstration to the link attached to the exercise
instructions
Not
Performance Criteria Performance Standard Done
Done
Plotted the 1st LOP of (Agio Pt. lighthouse)*.
Obtaining a ship position by
running fix (R.F) method without Apply the international notation convention for the
the effect of tidal stream 1st LOP
Calculated the distance run after an hour from the
first observation
Answer:
UC-CONTROLLED DOCUMENT 2 of 3
Dead Reckoning position.
Plotted the 2nd LOP of (Agio Pt. lighthouse)*.
Apply the international notation convention for the
2nd LOP
Transferred the first LOP to the DR position at 11:30
Rheymart D. Flores
Student’s Signature over Printed Name
Date: Sept 12, 2022
UC-CONTROLLED DOCUMENT 3 of 3
UC-CONTROLLED DOCUMENT 4 of 3