Esponjamiento 30%
Volumen Tonelaje a
pendiente [%] Lr total [m] extraer [m3] extraer [Ton] Inversión [US$]
8% 8,915 258,635 537,165 45,072,679
10% 7,246 210,232 436,635 36,730,976
12% 6,136 178,027 369,748 31,180,841
14% 5,345 155,078 322,085 27,225,827
16% 4,754 137,913 286,435 24,267,699
18% 4,295 124,604 258,794 21,974,101
5,000 US$/m Pendiente v/s Longitud de Ram
500,000 US$
Esponjamiento 30%
Longitud de Rampa
Curvas cada Largo de Longitud de
pendiente [%] N° de Curvas
[m] rampa [m] Curva [m]
8% 50 627 6 23
10% 50 502 6 23
12% 50 420 6 23
14% 50 361 6 23
16% 50 316 6 23
18% 50 282 6 23
Inversión de Rampa
Volumen Tonelaje a
pendiente [%] Lr total [m] extraer [m3] extraer [Ton] Inversión [US$]
8% 8,891 257,947 535,736 44,954,092
10% 7,222 209,544 435,206 36,612,389
12% 6,112 177,339 368,319 31,062,254
14% 5,321 154,390 320,655 27,107,239
16% 4,730 137,225 285,006 24,149,112
18% 4,271 123,916 257,365 21,855,514
0,46 Dolares/lt
Longitud de Rampa
pendiente [%] Curvas cada Largo de
Profundidad (tope)
Esponjamiento 30%
Longitud de Rampa
Curvas cada Largo de Longitud de
pendiente [%] N° de Curvas
[m] rampa [m] Curva [m]
8% 50 627 6 21
10% 50 502 6 21
12% 50 420 6 21
14% 50 361 6 21
16% 50 316 6 21
18% 50 282 6 21
Inversión de Rampa
Volumen Tonelaje a
pendiente [%] Lr total [m] extraer [m3] extraer [Ton] Inversión [US$]
8% 8,848 256,716 533,180 44,741,987
10% 7,180 208,313 432,650 36,400,284
12% 6,070 176,108 365,763 30,850,149
14% 5,279 153,159 318,099 26,895,135
16% 4,687 135,994 282,450 23,937,008
18% 4,229 122,686 254,808 21,643,409
Longitud de Rampa
pendiente [%] Curvas cada Largo de
Profundidad (tope)
Camion MT 65
Pendiente Capacidad Tiempo de Flota de Recarga/día
Vueltas/día
[%] [ton] ciclo [hr] camiones (camión)
8% 65 1.4 11.6 13.2 1.5
10% 65 1.4 10.9 14.0 1.5
12% 65 1.4 10.9 14.0 1.5
14% 65 1.3 10.6 14.4 1.5
16% 65 1.3 10.5 14.5 1.5
18% 65 1.4 11.1 13.8 1.5
Camion MT42
Pendiente Capacidad Tiempo de Flota de Recarga/día
Vuelta/día
[%] [ton] ciclo [hr] camiones (camión)
8% 42 1.4 11.4 13.4 1.5
10% 42 1.3 10.7 14.3 1.5
12% 42 1.3 10.9 14.1 1.5
14% 42 1.3 10.4 14.8 1.5
16% 42 1.4 11.0 13.9 1.5
18% 42 1.3 10.3 14.8 1.5
H efectivas 19
dias/mes 28
dias/años 336
Mano de obra
Puesto Cantidad Salario Unit. (US$/mes)
PERSONAL DE OPERACIÓN
Operador de camión 32 3000
Operador de LHD 16 3200
Operador de perforadora 8 2500
Ayudante de perforación 8 1500
Ayud. Acuñadores, Cargadores explosivos 6 1000
Capataz 4 3000
Topógrafo 4 3000
Alarife 4 1000
Geólogo 4 5000
Ayudante geologogía, fortificación 4 1500
Operador de mini bus 8 1000
Eléctrico 4 1500
Ayudante geomecánica 4 1500
Operador de acuñador 4 2800
Operador cargador explosivos 4 2800
Personal de aseo 16 900
Personal de casino 16 900
Encargado de combustible 4 900
Encargado de polvorín 4 900
Paramédico 4 800
Ingeniero Civil de Minas 4 5000
Prevencionista 4 2500
Supervisor de Turno 4 3800
SUBTOTAL POR TURNO 43
PERSONAL ADMINISTRATIVO
Gerente general 1 20000
Gerente de operaciones 1 12000
Jefe departamento de geología 1 8000
Jefe departamento de ingeniería 1 8000
Jefe depto. de prevención 1 8000
Jefe de geomecánica 1 6000
Secretaría 5 4000
Asistentes 6 2000
Control de gestión 1 3000
SUBTOTAL POR TURNO 18
PERSONAL EN SUPERFICIE
Ingeniero mecánico 4 3000
Mecánico 8 1500
Soldador 4 1500
Ayudante mecánico 8 1000
Electromecánico 8 1500
Vulcanizador 4 1500
Bodeguero 4 1000
Bombero 4 1000
Encargado de polvorín 8 1500
SUBTOTAL POR TURNO 13
TOTAL POR TURNO 74
TOTAL 240
% Adicional de gastos por perso
Gastos adicionales de personal (US
Gastos reales en M.O. (US$/añ
300,000
300,000
11,560,000
96000 1152000
51200 614400
20000 240000
12000 144000
6000 72000
12000 144000
12000 144000
4000 48000
20000 240000
6000 72000
8000 96000
6000 72000
6000 72000
11200 134400
11200 134400
14400 172800
14400 172800
3600 43200
3600 43200
3200 38400
20000 240000
10000 120000
15200 182400
20000 240000
12000 144000
8000 96000
8000 96000
8000 96000
6000 72000
20000 240000
12000 144000
3000 36000
12000 144000
12000 144000
6000 72000
8000 96000
12000 144000
6000 72000
4000 48000
4000 48000
12000 144000
539000 6468000
Adicional de gastos por personal 50
s adicionales de personal (US$/año) 3,234,000
astos reales en M.O. (US$/año) $ 9,702,000
Horas
7,200 6,000
14,400 12,000
21,600 18,000
28,800 24,000
36,000 30,000
43,200 36,000
50,400 42,000
57,600 48,000
64,800 54,000
72,000 60,000
79,200 66,000
86,400 72,000
93,600 78,000
100,800 84,000
108,000 90,000
115,200 96,000
122,400 102,000
129,600 108,000
136,800 114,000
144,000 120,000
151,200 126,000
158,400 132,000
165,600 138,000
172,800 144,000
180,000 150,000
187,200 156,000
194,400 162,000
201,600 168,000
208,800 174,000
216,000 180,000
Deprecición de camiones MT 65 [US$] MT 42 [US$]
Vida útil 6 6
valor equipo 1,100,000 905,385
repuestos 10% 110,000 90,539
flete 8% 88,000 72,431
Valor total equipo 1,298,000 1,068,354
Deprecición rampa [MT65] US$/m US$ para 12% US$ para 14%
Costo de excavación rampa 5,000 30,562,254 26,607,239
Costo de instalación rampa 500,000 500,000
Costo total construcción rampa [US$] 31,062,254 27,107,239
Vida útil de rampa (años) 12
Depreciación acelerada 4
Valor residual rampa (%) 10%
Depreciación por año [US$] 6,989,007 6,099,129
US$ para 16%
23,437,008 6,070 5,279 4,687
500,000
23,937,008
5,385,827
5,433,550
Rampa 12% (MT42)
Flujo de Caja 0 1 2 3 4
Instalación y excavación -30,850,149
Inversión por ventilación -1,000,000
Camiones -11,941,335
LHD 0
Inversión -43,791,484
Egresos
Costos operacionales -24,559,200 -24,559,200 -24,559,200 -24,559,200
Consumo Petróleo -1,489,373 -1,489,373 -1,489,373 -1,489,373
Costos fijos -12,960,000 -12,960,000 -12,960,000 -12,960,000
Costos mano de obra
Costos mantención
Egresos
Costos operacionales -24,559,200 -24,559,200 -24,559,200 -24,559,200
Consumo Petróleo -1,421,592 -1,421,592 -1,421,592 -1,421,592
Costos fijos -12,960,000 -12,960,000 -12,960,000 -12,960,000
Costos mano de obra
Costos mantención
Egresos
Costos operacionales -24,559,200 -24,559,200 -24,559,200 -24,559,200
Consumo Petróleo -1,489,373 -1,489,373 -1,489,373 -1,489,373
Costos fijos -12,960,000 -12,960,000 -12,960,000 -12,960,000
Costos mano de obra
Costos mantención
6,282,186 6,282,186
-11,941,335
5 6 7 8 9 10 11 12
-9,118,311
5 6 7 8 9 10 11 12
0
62,797,280 62,797,280 62,797,280 62,797,280 62,797,280 62,797,280 62,797,280 62,797,280
1 2
-13,672,267 -12,429,334
Rampa 12% (MT42)
Flujo de Caja 0 1 2 3 4
Instalación y excavación -30,850,149
Inversión por ventilación -1,000,000
Camiones -11,941,335
Inversión -43,791,484
Egresos
Costos operacionales -24,559,200 -24,559,200 -24,559,200 -24,559,200
Consumo Petróleo -1,489,373 -1,489,373 -1,489,373 -1,489,373
Costos fijos -12,960,000 -12,960,000 -12,960,000 -12,960,000
Costos mano de obra
Costos mantención
Egresos
Costos operacionales -24,559,200 -24,559,200 -24,559,200 -24,559,200
Consumo Petróleo -1,421,592 -1,421,592 -1,421,592 -1,421,592
Costos fijos -12,960,000 -12,960,000 -12,960,000 -12,960,000
Costos mano de obra
Costos mantención
Egresos
Costos operacionales -24,559,200 -24,559,200 -24,559,200 -24,559,200
Consumo Petróleo -1,489,373 -1,489,373 -1,489,373 -1,489,373
Costos fijos -12,960,000 -12,960,000 -12,960,000 -12,960,000
Costos mano de obra
Costos mantención
-9,553,068
5 6 7 8 9 10 11 12
-9,118,311
5 6 7 8 9 10 11 12