 DISPLACEMENT = Lpp × B ×T ×Cb ×1,025

= 66 ×1 0,5 ×3,9 × 0 ,66 × 1,025


=1828,38 Ton

 LWT = 0,3 × DISPLACEMENT


= 0,3 ×1828,38
= 548,51Ton

 BALLAST = 10 % × LWT
= 10 % × 548,51
= 54,851Ton

 ASUMSI DIBONGKAR 5 JAM (< 100m)


54,851
VOLUME 1,025 m3
Q= = =1 0,70
WAKTU 5 jam

 MENGHITUNG DIAMETER PIPA

Q=V × A

10,70 ×1000 1
=2,5× π D2
3600 4
2
D =1,51
D= √ 1 , 51
D=1 , 22 dm=122 mm

 BRANCH LINE
Q 1=Q2
V 1 × A1=2 ×V 2 × A 2
1 1
× π × D 12 × A 1=2 × × π × D 22 × A 2
4 4
1 1
× D 12= × D 22
4 2
1
×1 222=D 22
2
√ 7442=D 2
D 2=86,26 mm

 POWER POMPA
Q× ρ × ( T −0,3 ) ×1000
POWER POMPA=
75× 60 ×60 × μ
10,70 × 1,025× 3 ,6 × 1000
POWER POMPA= =0 , 182 HP
75 × 60× 60 ×0,8
0 , 182 HP=1 33,8 Watt