Professional Documents
Culture Documents
L of superstructure
Total Length of Girder = 26 m Input only in Blue cells
Total width = 11 m
Total depth of girder = 1.65 m
Depth of deck slab = 0.225 m
No of girders = 3
Width of girder = 0.9 m
Width of diaphraghm = 1.8 m
Length of diaphragm = 7.5 m
Depth of diaphraghm = 1.65 m
Density of concrete = 25 kN/m3
D.L of slab = 1608.750 kN 2.475 Abutment
D.L of girder = 2500.875 kN 3.8475 A 9.24
D.L of diaphragm = 556.875 kN 2.97 45.6533
Total D.L of superstructure = 4666.500 kN 9.2925
SIDL of superstructure
Density of w.c = 22 kN/m3
Thickness of w.c = 0.065 m
SIDL of w.c = 408.98 kN
Weight of crash barrier = 7.5 kN/m
SIDL of w.c = 195 kN
Weight of handrails = 3.5 kN/m
SIDL of handrails 91 kN
D.L of substructure
Total Height of pier pedestal = 3.435 m
Depth of pier cap/diaphragm = 1.5 m 0.248505
Height of pier (excluding cap) = 1.935 m 1.767146
Width of pier cap = 2 m
Straight length of pier cap = 7.5 m
Diameter of pier = 1.5 m
D.L of pier and pier cap = 725.625 kN
Width = 4 m
Depth = 1.8 m
Length = 7.5 m
D.L = 1350 kN
D.L of Pile
Pmax=
P/N+ML *(x/IL)
+MT*(y/IT) = 2134.415 kN/m2
P = 7973.253 kN (kN/M2)
Pmin=
P/N-ML *(x/IL)-
MT*(y/IT)
(kN/M2) = 1852.211 kN/m2
P/A -ML/ZL-
MT/ZT
(kN/M2)
ML = 2092.333 kNm
MT = 1005.51 kNm
Txx 6.25
IYY 6.25
D.L of superstructure
Total Length of Girder = 26 m Input only in Blue cells
Total width = 11 m
Total depth of girder = 1.65 m
Depth of deck slab = 0.225 m
No of girders = 3
Width of girder = 0.9 m
Width of diaphraghm = 1.8 m
Length of diaphragm = 7.5 m
Depth of diaphraghm = 1.65 m
Density of concrete = 25 kN/m3
D.L of slab = 1608.750 kN 2.475
D.L of girder = 2500.875 kN 3.8475
D.L of diaphragm = 556.875 kN 2.97
Total D.L of superstructure = 4666.500 kN 9.2925
SIDL of superstructure
Density of w.c = 22 kN/m3
Thickness of w.c = 0.065 m
SIDL of w.c = 408.98 kN
Weight of crash barrier = 7.5 kN/m
SIDL of w.c = 195 kN
Weight of handrails = 3.5 kN/m
SIDL of handrails 91 kN
D.L of substructure
Total Height of pier pedestal = 1.265 m
Depth of pier cap/diaphragm = 0.6 m
Height of pier (excluding cap) = 0.665 m
Width of pier cap = 1.8 m
Straight length of pier cap = 7.5 m 3.82375
Diameter of pier = 1.5 m
D.L of pier and pier cap = 0.000 kN
Width = 2 m
Depth = 1.8 m
Length = 8.2 m
D.L = 738 kN
D.L of Pile
Pmax=
P/N+ML *(x/IL)
+MT*(y/IT) =
P = 6635.628 kN (kN/M2)
Pmin=
P/N-ML *(x/IL)-
MT*(y/IT)
(kN/M2) =
P/A -ML/ZL-
MT/ZT
(kN/M2)
ML = 1947.667 kNm
MT = 1005.51 kNm
Input only in Blue cells
Abutment
A 9.24
45.6533
0.248505 101.765
1.767146 0.6
4 104.365
0.9
105.18
103.88
102.58
3.69
3648.814
1216.271
1581.153
0.74
19.24
2211.876
1800.009 kN/m2
1517.805 kN/m2