Professional Documents
Culture Documents
Sample Questions & Worked Out Examples For: Ministry of Science and Technology
Sample Questions & Worked Out Examples For: Ministry of Science and Technology
DEPARTMENT OF
TECHNICAL AND VOCATIONAL EDUCATION
PE-03023
B.Tech(First Year)
Petroleum Engineering
53
Ministry of Science and Technology
Department of Technical and Vocational Education
Petroleum Engineering
1.*** Discuss the importance of knowing the IPR of a well with necessary illustrations. (10 marks)
2.** Using the Vogel's equation, construct the generalized IPR curve. (10 marks)
3.* The following test was conducted on a solution-gas drive well:
Static reservoir pressure = 2000 psi Flowing bottom-hole pressure = 500 psi
Producing rate = 146 bpd
Find (a) potential of the well, (b) flow rate for a flowing pressure of 1500 psi. (10 marks)
4.** An oil well produced 500 bpd with a flowing BHP of 2500 psi. If the average reservoir
pressure is 3000 psi find the maximum possible rate from the well. Also find the production
rate when the producing pressure dropped to 1200 psi. Also find the maximum rate if a linear
relationship is assumed. The bubble point pressure is 3000 psi. (15 marks)
5.** Construct the IPR curve for the well of problem (4). (10 marks)
6.** Given data:
Present Future
Average reservoir pressure, psi 2500 2000
Flowing bottom-hole pressure, psi 2300 1500
Production rate, bpd 400 ?
Oil viscosity, cp 3.0 3.6
Oil formation volume factor 1.18 1.16
Oil saturation 0.76 0.67
Residual oil saturation 20%
Residual water saturation 22%
Find the production when the reservoir pressure drops to 2000 psi and for a flowing pressure
of 1500 psi, and construct the future IPR for the well. (20 marks)
7.** From a solution-gas drive well the following information was obtained:
Present Future
Static reservoir pressure, psi 1800 1500
Flowing bottom-hole pressure, psi 1600 -
Production rate, bpd 250 -
Oil viscosity, cp 4.0 4.5
Oil formation volume factor 1.16 1.145
Average oil saturation 0.75 0.72
Residual oil saturation 18%
Residual water saturation 22%
9.** A series of tests is made on a certain well with the following results.
Oil rate, bpd WOR Flowing BHP, psi
40 0 2360
56 0.785 1950
61 1.440 1524
70 1.855 1000
Draw the curve of water cut versus gross production rate and the oil, water, and gross IPRs.
Might any harm result from shutting this well in for a few days? (15 marks)
Chapter 2 Multiphase Flow in Pipes
10.*** Discuss the Gilbert's empirical approach to the vertical two-phase flow in oil wells.
(10 marks)
11.* Explain the slippage and flow resistance and discuss the optimum GLR. (15 marks)
Chapter 3 Flowing Well Performance
(Use square graph paper and Gilbert's families of curves only)
12.* A well utilizing 2⅜-in. tubing is producing against 200 psi surface pressure at a rate of 200
bbl/day with a constant GOR of 600 from a depth of 8000 ft. Determine the flowing BHP
required to produce 200 bbl/day. (5 marks)
13.* A 5000-ft well is equipped with 2⅜-in. tubing and produces into a constant surface tubing
pressure of 100 psi. The static BHP is 2150 psi. The following production test was made on
this well. Production rate = 550 bwpd and 50 bpd, GOR = 1200 scf/bbl
Find the PI of this well. (8 marks)
14.* A 6000-ft well is equipped with 1.9-in. tubing. A recent survey shows the following
information.
TEST 1 : THP = 250 psi GOR = 400 Production = 100 bbl/day
TEST 2 : THP = 100 psi GOR = 750 Production = 200 bbl/day
Determine the PI from these two flowing tests. (10 marks)
15.** A well 6000 ft deep with a static BHP of 3000 psi is equipped with 1.9-in. tubing. This well
makes clean oil and has a PI of 0.2. The wellhead tubing pressure remains constant for all
rates of 200psi. What GLR will be required to produce 400 bbl/day from this well?(10 marks)
16.** A flowing well with 5540 ft of tubing in the hole is completed without a casing-tubing
packer. The CHP is 480 psig when the production rate is 750 bbl/day and 760 psig when the
production rate is 525 bbl/day. What are the PI, static pressure, and potential of the well?
(10 marks)
17.** A well completed over the interval 2994 to 3032 ft has 2⅜-in. tubing hung at 3000 ft. The
well is flowing 320 bbl/day, zero water cut, at a GOR of 400 cu ft/bbl with a THP of 500
psig. The static pressure is 1850 psig at 3000 ft. What would be the effect of changing the
choke size to ½-in.? (15 marks)
18.** A certain well is completed with 7500 ft of 3½-in. tubing in the hole, the tubing shoe being
located just above the top perforations. The well is flowing 130 bbl/day of oil with a water
cut of 25 per cent and a GOR of 1200 cu ft/bbl. If the well's static pressure is 2800 psig and
its gross PI is 0.32, estimate the size of choke in the flow line. At what rate would the well
flow if a ½-in. bean were substituted for the current one? (15 marks)
19.** A well was completed with 7-in. casing perforated from 7216 to 7253 ft with 7000 ft of 2⅜-
in. tubing in the hole. The well was flowing steadily at 320 bbl/day of clean oil, GOR 800 cu
ft/bbl against an 11/64-in. choke when a smaller choke was accidentally inserted in the flow
line. When the well stabilized against the new choke, it was flowing with a THP of 300 psig
and a CHP of 993 psig. Determine the new bean size, the well's static pressure and the PI.
(15 marks)
55
20.** A new flowing well completed with 2⅜-in. tubing hung at the top of the perforations at 5500
ft was initially produced on ¼-in. choke, the THP stabilizing at 400 psig. After a few days'
production the choke size was increased to ½-in., and the THP stabilized at 270 psig. One
week later the choke size was again increased, and the well then gauged at 600 bbl/day of
clean oil, GOR 800 cu ft/bbl, THP 140 psig. Estimate the well's static pressure and its
pumped-off potential. (15 marks)
21.** The completion data of a well are as follows:
Total depth 4052 ft
7-in. casing surface to 4020 ft
3½-in. tubing hung at 4000 ft
Casing-tubing packer installed just above tubing shoe.
The well was flowing at 300 bbl/day of clean oil, a GOR of 600 cu ft/bbl, and a THP of 300
psi when it was decided to try the effects of an acidizing treatment. During this treatment,
10000 gals of acid was squeezed into the formation. A surface pressure of 3200 psi was
needed to overcome the static reservoir pressure of 1800 psi and to achieve the desired
injection rate of 2 bbl/min. After the treatment the well's production rate stabilized at 340
bbl/day of clean oil through 3½-in. tubing with a GOR of 1000 cu ft/bbl and a THP of 300
psi. (a) Determine whether or not the treatment was successful, and give an explanation of
the results obtained. (b) What would have been the production rate of the well at a THP of
300 psi if, instead of the acidizing treatment, the 3½-in. tubing string had been replaced with
a 2⅜-in. tubing (assuming that the change could have been made without damaging the
producing formation) ? (15 marks)
22.*** A flowing well with 5000 ft of 2⅜-in. tubing in the hole is completed with a 7-in. casing. The
static pressure is 1450 psig at 5000 ft. The well is currently flowing with a CHP of 738 psig
and THP of 360 psig. The production is clean oil and GLR is 0.45 mcf/bbl. Construct the IPR
and determine the PI.
Which size of bean should be inserted if it is desired to produce at the maximum possible rate
with a drawdown of 980 psi? (15 marks)
23.* A flowing well is completed with 7332 ft of 2⅜-in. tubing, the tubing shoe being located
opposite the top of the perforations. At what rate will the well flow against a ¼-in. choke
under each of the following conditions?
( ) Static pressure, 3000 psig; PI, 0.42 bbl/day/psi; GOR, 200 cu ft/bbl.
( ) Static pressure, 2500 psig; PI, 0.33 bbl/day/psi; GOR, 330 cu ft/bbl.
( ) Static pressure, 2000 psig; PI, 0.29 bbl/day/psi; GOR, 500 cu ft/bbl.
( ) Static pressure, 1500 psig; PI, 0.27 bbl/day/psi; GOR, 1000 cu ft/bbl.
On the same sheet of graph paper plot the pumped-off potential and the actual flow rate
against the static BHP?
Chapter 4 The Principles of Gas Lift
24.* Describe the two major methods of gas-lift operation. (10 marks)
25.* Discuss the classification of wells to decide whether continuous or intermittent gas lift
operation is applicable to a well. (10 marks)
26.* What are the three main types of gas-lift installations? (10 marks)
27.** What type of installation would you recommend for the wells specified in the following
table? (20 marks)
42.* A well is to be placed on continuous-flow gas lift. The well data are as follows:
Well depth = 4900 ft Tubing size = 2 in.
Productivity index = 2.0 Static BHP = 2000 psig
58
Production = 500 bbl/day Flowing gradient = 0.5 psi/ft
Tubing pressure = 50 psig Unloading gradient = 0.12 psi/ft
Surface kick-off and operating pressure = 650 psig
Temperature at wellhead = 100°F Temperature at 4900 ft = 149°F
Av/Ab = 0.11 Spring effect = 75 psig
( ) Using valves with surface closing pressure of 600, 580, and 550 psig, calculate the setting
depth for each valve, using the valve closing pressure at valve depth.
( ) What is the temperature at each valve depth?
( ) What are the pressure inside the bellows at valve depths?
( ) What are the pressure inside the bellows at 60°F?
( ) What are the valve opening pressures at 60°F? (15 marks)
43.** A low productivity index, relatively high BHP well is to be placed on intermittent-flow gas-
lift. The well data are as follows:
Depth to middle of perforations = 9000ft Surface operating pressure = 900 psig
Tubing size = 2 in. (capacity 0.00387 bbl/ft) Casing size = 5½-in., 20 lb/ft
Gravity of oil = 34°F (0.855) Static BHP = 2500 psig
Well productivity index = 0.20 Tubing pressure = 30 psig
Oil production desired = 100 bbl/day Wellhead temperature = 100°F
Average tubing temperature = 142°F Minimum cycle time = 35 min
( ) Assuming that 40 per cent of the starting slug is produced, what will be the depth to the
operating valve?
( ) What is the desired casing pressure opposite the valve?
( ) What is the minimum injection gas-oil ratio? (15 marks)
44.** A well is to be placed on intermittent-flow gas-lift. The well data are as follows:
Well depth = 8000 ft Tubing size = 2-in., Capacity: 0.00387 bbl/ft
Specific gravity of oil = 0.87 Casing size = 5½-in., 20 lb/ft
No water production. Well PI = 0.08 bbl/day/psi
Static BHP = 2200 psig Wellhead pressure = 50 psig
Oil production desired = 120 bbl/day Average tubing temperature = 127 °F
Cycle time = 48 min Gas deviation factor = 0.87
Calculate the depth to the operating valve and theoretical minimum injection gas-oil ratio,
assuming 70 per cent of starting slug is produced. (15 marks)
45.*** What are the two common types of chambers? (10 marks)
46.* Calculate the chamber length for the following well data: (10 marks)
Injection pressure = 400 psig Wellhead tubing pressure = 50 psig
Fluid gradient = 0.4 psi/ft
Insert chamber = 1-in. tubing inside 4-in. OD tubing
Capacity of 1-in. tubing = 1.07 bbl/1000 ft
Annular capacity between 1-in. dip tubing and 4-in. tubing = 13.54 bbl/1000 ft
Petroleum Engineering
1. An oil well produced 500 bpd with a flowing BHP of 2500 psi. If the average reservoir pressure
is 3000 psi find the maximum possible rate from the well. And find the production rate when the
producing pressure dropped to 1200 psi. Also find the maximum rate if a linear relationship is
assumed. The bubble point pressure is 3000 psi.
Solution
The bubble point pressure is 3000 psi and therefore, flowing BHP of 2500 psi is well below the
bubble point pressure ,and Vogel's equation or generalized IPR curve can be used.
p wf 2500
= = 0.833
pR 3000
2
qo p wf p
= 1 − 0.2 − 0.8 wf = 1 − 0.2 × 0.833 − 0.8(0.833) 2 = 0.278
(q o ) max pR pR
p wf 1200
= = 0.4
pR 3000
2
qo p wf p
= 1 − 0.2 − 0.8 wf = 1 − 0.2 × 0.4 − 0.8(0.4) 2 = 0.792
(q o ) max pR pR
qo p wf
= 1 − = 1 − 0.833 = 0.167
(q o ) max pR
Find the production when the reservoir pressure drops to 2000 psi and for a flowing pressure of
1500 psi, and construct the future IPR for the well.
Solution
Assumed Production,
flowing BHP, psi bbl/day
0 1023
500 920
1000 716
1500 409
2000 0
61
2000
1000
500
0
0 500 1000 1500
Production rate, bbl/day
Problem (2)
3. A well 6000 ft deep with a static BHP of 3000 psi is equipped with 1.9-in. tubing. This well
makes clean oil and has a PI of 0.2. The wellhead tubing pressure remains constant for all rates of
100psi. What GLR will be required to produce 400 bbl/day from this well?
Solution
Static BHP = 3000 psi and PI = 0.2 bbl/day/psi, to produce 400 bbl/day, flowing BHP will be
pwf = 3000 – (400/0.2) = 1000 psi
Using the 1.9 in., 400 bpd pressure-curve, with FBHP of 1000 psi, observe various GLR at
various THP.
GLR, THP,
Equiv. FBHP, ft Equiv. THP, ft
mcf/bbl psi
0.3 6700 700 80
0.4 7250 1250 140
0.6 8000 2000 200
Plot GLR vs. THP, from the graph GLR = 0.33 mcf/bbl at 100 psi THP.
200
150
THP, psi
100
50
0.3 0.4 0.5 0.6
GLR, mcf/bbl
Problem (3)
62
4. A flowing well with 5540 ft of tubing in the hole is completed without a casing-tubing packer.
The CHP is 480 psig when the production rate is 750 bbl/day and 760 psig when the production
rate is 525 bbl/day. What are the PI, static pressure, and potential of the well?
Solution
D 1 .5
Using Eq.(3.3): p wf = p c (1 + )
100
D1.5 = (5.54)1.5 = 13,
13
p wf = p c (1 + ) = 1 .13 p c
100
When CHP = 480 psig = 495 psia, p wf = 1.13 ×495 = 560 psia = 545 psig
When CHP = 760 psig = 775 psia, p wf = 1.13 ×775 = 875 psia = 860 psig
q
Assuming straight line IPR, and using p wf = p s −
J
For case I 545 J = Jp s − 750 (1)
For case II 860 J = Jp s − 525 (2)
Solving these two unknown equations, PI = 0.71 psi/bbl/day, ps = 1600 psig, and the well's
potential is 1130 bbl/day. #
5. A well was completed with 7-in. casing perforated from 7216 to 7253 ft with 7000 ft of 2⅜-in.
tubing in the hole. The well was flowing steadily at 320 bbl/day of clean oil, GOR 800 cu ft/bbl
against an 11/64-in. choke when a smaller choke was accidentally inserted in the flow line. When
the well stabilized against the new choke, it was flowing with a THP of 300 psig and a CHP of
993 psig. Determine the new bean size, the well's static pressure and the PI.
Solution
First case: choke size was 11/16-in. and, so S = 44 for the Eq.(3.5),
Tubing head pressure, p tf = 435 R1.89 q = 435 × 0 .851.89 × 320 = 100 psig
0 . 546 0 .546
S 44
Second case: At THP = 300 psig, CHP = 993 psig = 1008 psia
7 1 .5
p wf = 1008 (1 + ) = 1195 psia = 1180 psig
100
Prepare the following table using the pressure gradient curve for 2⅜-in. tubing,
Assumed flow Flowing BHPs Flowing BHPs
rates, bbl/day at THP of 100 psig, psig at THP of 100 psig, psig
50 1000 1460
100 820 1200
200 760 1100
400 800 1160
600 840 1180
Assuming a straight line IPR, draw the IPR connecting the points 1180 psi on the first curve and
320 bbl/day on the second curve. From the IPR: static BHP = 1400 psig and the well's potential is
725 bbl/day. So PI is 725/1400 = 0.52 bbl/day/psi.
With new choke flowing BHP is 1180 psig and production is 110 bbl/day with THP 300 psig.
1600
1400
1000
800
600
400
200
0
0 200 400 600 800
Production rate, bbl/day
Problem (5)
6. What is the force balance under operating conditions for the conventional fluid-operated valve of
Fig.4.11? The notation is as follows: Ab = effective bellows area; As = area of stem; Av = area of
port; pb = bellows charge pressure; pc = injection pressure; pt = tubing pressure.
Solution
Referred to Fig. 4.11, conventional fluid-operated valve
Closing force, Fc = pb Ab
Opening force, Fo = pt ( Ab − Av ) + p c Av
Force balance, Fc = Fo
pb Ab = pt Ab − pt Av + p c Av
7. Calculate the casing pressure opposite a valve at 6000 ft using Eq.(4.15), and check with Fig.4.10
for the following well conditions: (10 marks)
Geothermal gradient = 1.6°/100 ft Wellhead pressure = 500 psia
Mean surface temperature = 70°F Gas gravity = 0.60
Solution
Temperature at 5000 ft, Tv = 70°F + 5000 ×(1.6/100)= 150°F
Therefore,
70 + 150
T avg = = 110 ° F (or) 570 ° R
2
Increase in casing pressure,
∆ p ≅ 0 .25 ( p wh / 100 )( D / 100 ) = 0 .25 × (500 / 100 )( 5000 / 100 ) = 62 .5 psi
500 + 562.5
p avg = = 531 psia (or) 516 psig
2
From Fig. 4.9, z = 0.994
γD / 122.7 zTavg
p v = p wh 10 = 500 × 10 0.6×5000 / 122.7×0.944×570 = 555 psia= 540 psig
64
500 + 540
Again p avg = = 520psig
2
From Fig. 4.9 , z = 0.942 which gives pv = 555 psia (or) 540 psig
8. An operator needs the surface closing pressure of a pressure-operated flow valve with a 75 psi
spring effect to be 600 psig when the valve is installed in a well at 6000 ft where the temperature
is 160°F. (20 marks)
(a)Using again the value 0.112 for Av/Ab calculate the pressure opposite the valve at 6000 ft for
a surface casing pressure of 600 psig. This is the closing pressure of the valve at the operating
temperature of 160°F.
(b)What is the pressure inside the bellows at 160°F?
(c)What is the pressure inside the bellows at 60°F?
(d)Calculate the opening pressure of the valve at 60°F which would be specified in ordering
from the manufacturer.
Solution
9. It is desired to design a continuous gas-lift installation from the following well data:
Depth to top of perforations = 5800 ft Operating pressure = 650 psig
Wellhead tubing pressure = 50 psig Unloading gradient = 0.04 psi/ft
Static gradient = 0.5 psi/ft Casing size = 5½-in., 20 lb/ft
Static fluid level = 2500 ft from the surface Tubing size = 2-in.
Valve opening pressures at 60°F = 650, 625, 600, 575, and 550 psig
(a)What are the setting depths of each valve based on valve opening pressures at 60°F?
(b)A closing pressure analysis of the valve string calculated above should be made to be sure
that the valves as spaced will have closing pressures decreasing with depth. Valve ratio =
0.112 and spring effect = 75 psig.
Solution
From Table 5.1, Aa/At = 4.31 and, since the static fluid level is known as 2500 ft from the surface.
The depth to the top valve is
p v1 − p wh 650 − 50
D1 = D s + = 2500 + = 2726 ft (Depth to top valve)
(1 + R ) G s (1 + 4 .31) 0 .5
65
p v 2 − G f D1 − p wh 625 − 0 .04 × 2726 − 50
D1− 2 = = = 932 ft
Gs 0 .5
D 2 = 2726 + 932 = 3658 ft (Depth to 2nd valve)
600 − 0 .04 × 3658 − 50
D 2 −3 = = 808 ft, D 3 = 3658 + 808 = 4466 ft (Depth to 3rd valve)
0 .5
575 − 0 .04 × 4466 − 50
D 3− 4 = = 692 ft, D 4 = 4466 + 692 = 5158 ft (Depth to 4th valve)
0 .5
550 − 0 .04 × 5158 − 50
D 4 −5 = = 588 ft, D 5 = 5158 + 588 = 5746 ft (Depth to 5th valve)
0 .5
Column (4): p vo = p d + S t − p t R
1− R 1− R
Column (5)and (7): Fig.4.10
Column (6): p vc = p d @ T v + S t (1 − R )
10. A well is to be placed on intermittent-flow gas-lift. The well data are as follows:
Well depth = 8000 ft Tubing size = 2-in., Capacity: 0.00387 bbl/ft
Specific gravity of oil = 0.87 Casing size = 5½-in., 20 lb/ft
No water production. Well PI = 0.08 bbl/day/psi
Static BHP = 2200 psig Wellhead pressure = 50 psig
Oil production desired = 120 bbl/day Average tubing temperature = 127 °F
Cycle time = 48 min Gas deviation factor = 0.87
Calculate the depth to the operating valve and theoretical minimum injection gas-oil ratio,
assuming 70 per cent of starting slug is produced.
Solution
Tubing pressure opposite the operating valve , pt = 50 + (1473 × 0.377) = 605 psig
Minimum casing pressure at operating valve = 605 + (605/2) = 908 psig
Space for gas injected = 7012 × 0.00387 – 5.7 = 21.44 bbl = 120.3 cu ft
Tubing pressure under slug the surface = 50 + (4/0.00387) × 0.377 = 440 psig
pavg = (908 + 440)/2 = 674 psig = 688.7 psia
Tavg = 127 + 460 = 587 °R
688 .7 520 1
V sc = 120 .3 × × × = 5739 SCF/cycle
14 .7 587 0 .87
****************
67
Ministry of Science and Technology
Department of Technical and Vocational Education
Petroleum Engineering
16.** A well is producing 240 bbl/day of a fluid having specific gravity of 0.80. The pump is set at
3500 ft on ¾-in. rods, and the plunger size is 1¾ in. Calculate the ideal counterbalance effect
for the unit. (5 marks)
17.** A certain crank counterbalance has its center of gravity 33 in. from the center of the
crankshaft when stroke length is 44 in. In order to reduce pumping speed, and thereby
decrease peak polished rod load, it was decided to change the stroke length to 64 in. What
will be the new distance from the center of gravity of the counterbalance to the center of the
crankshaft if it is desired to keep the counterbalance effect the same? (10 marks)
18.** A dynamometer test was run on the well of Prob.(12). An analysis of the resulting
dynamometer card shows a peak load of 11,500 lb, a minimum polished rod load of 3800 lb,
a polished rod horsepower of 11.02. From results of the dynamometer test, calculate the ideal
counterbalance effect, maximum sucker rod stress, and peak torque if the unit is
counterbalanced to within 5 per cent of the ideal value. (10 marks)
19.** For a certain pumping installation production is 200 bbl per day of a fluid having a specific
gravity of 0.845 from a depth of 2500 ft. What is the below-ground efficiency for this
installation if a dynamometer test shows a polished rod horse power of 7.4 hp? (5 marks)
20.** The area within the loop of a certain dynamometer card is 2.97 sq in.; and the area between
the loop and the zero load line is 3.82 sq in. The length of the loop is 4.56 in.; and the
instrument constant for the dynamometer is 5550 lb per in. Calculate the correct
counterbalance effect for the unit. (5 marks)
21.** For the well of Prob.(20), the pumping speed is 20 spm and stroke length is 48 in. Calculate
the above-ground efficiency if the wattmeter (on the line to the electric motor being used as
the prime mover) shows an average power input of 14.5 kw. (7 marks)
22.** For a well the sucker rod string consists of 3575 ft of ¾-in. rods and 2625 ft of ⅞-in. rods. A
standing valve test on the well gave a static rod load of 10,190 lb. What is the effective
specific gravity of the fluid in the tubing? (5 marks)
23.** For the well of Prob.(22), plunger size is 1¾-in. If a traveling valve test shows a load of
14,725 lb, what pumping BHP is indicated? (7 marks)
24.** What is the net lift for the well of Probs.(22) and (23)? (3 marks)
25.*** In the design of a certain well, it is anticipated that production will be 375 bbl per day with a
pump setting depth of 6500 ft. Assuming a volumetric efficiency of 75 per cent for the pump,
calculate the rod size and the length of each section of the tapered string if sucker rod are
available in lengths of 25 ft. (15 marks)
26.*** A dynamometer card for a pumping well is shown in Fig.(1.29). Stroke length for the unit is
44 in., and pumping speed is 19.5 spm. The dynamometer used for the measurements has an
instrument constant of 8000 lb per in. Calculate the torque on the gear reducer when the
crank has turned through an angle of 330° from the beginning of the upstroke. (10
marks)
27.*** For the well of Prob.(26), the depth to the plunger is 5000 ft, and production is 225 bbl/day at
the pumping speed of 19.5 spm. Because of an increase in water cut, it is desired to obtain
more production by increasing pumping to a value greater than 19.5 spm. At what
approximate production rate would a synchronous pumping speed be encountered?(10 marks)
28.*** Construct the torque curve over a complete pumping cycle for the well of Prob. (26).
(15 marks)
29.*** The overall efficiency of a certain pumping unit (utilizing an electric motor as the prime
mover) is 39 per cent. If electric power costs $ 0.03 per kilowatt-hour, calculate the cost (for
power only) of lifting a barrel of fluid of specific gravity 0.855 from a depth of 5400 ft.
(10 marks)
30.*** A well is producing 584 bbl per day of a fluid having a specific gravity of 0.90. Pump setting
depth is 5125 ft, pumping fluid level is 3200 ft, and tubing pressure is 50 psi. What is the net
lift of the fluid? (5 marks)
31.*** A pumping unit has a single reduction gear with a gear ratio of 9:6. The unit sheave has a
pitch diameter of 34 in., and the sheave on the multicylinder gas engine has a pitch diameter
69
of 8 in. What is the engine speed when the pumping speed is 23 spm? (5
marks)
32.*** It is desired to put on pump a well having a static fluid level of 1000 ft. The well fluid has a
40 per cent water cut, with oil of gravity 40°API and water of specific gravity 1.015. The
installation is to be designed for an oil production of 125 bbl/day. Reservoir studies and well
fluids analyses indicate a probable pump volumetric efficiency of at least 80 per cent.
(b) Determine the API rating of the pumping unit assembly to be purchased for this
installation.
(b) Determine, for the propose installation, polished rod stroke length, optimum plunger size,
and resulting tubing size and pumping speed.
(b) Design the sucker rod string, assuming sucker rods to be available in lengths of 25 ft.
(b) Calculate the actual oil production for the assumed volumetric efficiency and the
operating conditions of part (b).
(b) An example of a pumping unit assembly which meets the requirements of parts (a) and
(b) is the Bethlehem 160D-20S-64. This unit has a beam load rating of 20,700 lb, an
available counterbalance effect (without auxiliary counterweights) of 11,770 lb, and a
peak torque rating of 160,000 in-lb. Compare these values with calculated values under
the selected operating conditions.
(b) What is the maximum sucker rod stress under the selected operating conditions?
(b) Determine the minimum brake horsepower rating for the electric motor to be used as the
prime mover.
(b) The standard unit sheave for the Bethlehem 160D-20S-64 pumping assembly has a pitch
diameter of 24 in., and the double reduction gear has a reduction ratio of 26.4. If motor
speed is 1200 rpm, what should be the pitch diameter of the motor sheave to obtain the
desired pumping speed? (20 marks)
33.** For a certain pumping installation, the pump setting depth is 515 ft and the working fluid
level is 3200 ft. The well is making 580 bbl per day of a fluid of specific gravity 0.90.
Assuming negligible tubing pressure, calculate the overall efficiency of the installation if the
wattmeter on the line to the electric motor being used as the prime mover shows an average
power input of 23 kw. (10 marks)
34.*** What is the average plunger speed for a well being pumped at 20 spm if the effective plunger
stroke is 58 in.? (5 marks)
35.*** It is desired to design a pumping installation to obtain a production of 360 bbl per day at a
pump setting depth of 3600 ft and an assumed volumetric efficiency of 80 per cent. The
appropriate design data shows two possible plunger sizes for the conditions. Considering the
possibility of excessive sucker rod failure resulting from synchronous pumping speed, which
plunger size should be selected? (10 marks)
Chapter 2 Electrical Submersible Centrifugal Pumps
36.* Explain briefly about the components of a electrical submersible pumping system. (15 marks)
37.** What are the accessory items for the submersible pumping system? (10 marks)
38.** Draw a sketch of standard performance curve for a submersible pump and explain its usage.
(15 marks)
39.* What is total dynamic head (TDH) and how can it be determined? (10 marks)
40.** Calculate the total dynamic head for the given well: (10 marks)
Required wellhead pressure = 200 psig Pump setting depth = 12000 ft
Tubing size = 3½-in. EUE Pumping rate = 2000 bpd
Fluid pumped = 70% 40°API oil with 30% water of specific gravity 1.05
Average density = 54.79 lbm/ft3 Fluid over pump intake = 650 ft
41.* Describe the summary of pump sizing procedure in sizing a submersible pumping unit.
(10 marks)
Chapter 3 Hydraulic Pumping
42.* Describe the advantages of the piston-type hydraulic pumping system. (10 marks)
43.** Describe the basic types of power fluid system and explain them. (15 marks)
70
44.* Explain the considerations and decisions that must be made when designing a hydraulic
pumping installation. (10 marks)
45.** How do you determine the power fluid rate? (10 marks)
*********************
71
Ministry of Science and Technology
Department of Technical and Vocational Education
Petroleum Engineering
Solution
Acceleration factors for respective pumping speeds are first calculated,
SN 2 68 × 16 × 16 68 × 20 × 20
α = α1 = = 0 .247 α2 = = 0 .386
70500 70500 70500
40.8 L2α
Increase in N will affect the term only of Eq.1.31, therefore
E
40 .8 L2α 2 40 .8 L2α 1
Increase in effective plunger stroke, ∆ S p = –
E E
40 . 8 L 2 40 . 8 × 7325 2
= (α 2 − α 1 ) = ( 0 . 386 − 0 . 246 ) = 10 . 1 in. #
E 30 × 10 6
2. A well has a sucker rod string consisting of 4600 ft of ¾-in. rods and 1950 ft of ⅞-in. rods. The
plunger diameter is 1½-in., polished rod stroke length is 64 in., and average specific gravity of
the well fluid is 0.825. At what pumping speed will polished rod stroke length and effective
stroke length be equal if the tubing is anchored?
Solution
For ¾-in. rods, Ar1 = 0.442 sq in., M1 = 1.63 lb/ft
For ⅞-in. rods, Ar2 = 0.601 sq in., M2 = 2.16 lb/ft
For 1½-in. plunger, Ap = 1.767 sq in.
When S = Sp , Eq.1.30 can be rewritten as,
L L
40 .8 L2α = 5 .2GDA p 1 + 2 , tubing is anchored.
A r 1 Ar 2
5 .2 × 0 .825 × 6550 × 1 .767 4600 1950
α = + = 0 .386
40 .8 × 6550 × 6550 0 .442 0 .601
SN 2 0 .386 × 70500
= α = 0 .386 and N = = 20 .6 spm #
70500 64
3. A certain crank counterbalance has its center of gravity 33 in. from the center of the crankshaft
when stroke length is 44 in. In order to reduce pumping speed, and thereby decrease peak
polished rod load, it was decided to change the stroke length to 64 in. What will be the new
distance from the center of gravity of the counterbalance to the center of the crankshaft if it is
desired to keep the counterbalance effect the same?
72
Solution
Assume l1 = l2 , r1 = S/2 = 22 in., and r2 = 32 in.
From Eq.6.57,
r1 ( C − C s ) (C - C s )
d1 = where = constant
Wc Wc
Then
d1 d 2
=
r1 r2
d2 = (33/22)×32 = 48 in. # The new distance from the center of gravity of the counterbalance to
the center of the crankshaft.
4. For a well the sucker rod string consists of 3575 ft of ¾-in. rods and 2625 ft of ⅞-in. rods. A
standing valve test on the well gave a static rod load of 10,190 lb. What is the effective specific
gravity of the fluid in the tubing?
For this well, plunger size is 1¾-in. If a traveling valve test shows a load of 14,725 lb, what
pumping BHP is indicated?
What is the net lift for the well ?
Solution
For ¾-in. rods, M1 = 1.63 lb/ft
For ⅞-in. rods, M2 = 2.16 lb/ft
From standing valve test, Wrm = 10190 lb
Calculated rod load, Wrc = 3575 × 1.63 + 2625 × 2.16 = 11497 lb
From Eq.1.84,
Wrm = Wrc (1 – 0.127 G)
1 – 0.127 G = 10190/11497 = 0.886
G = 0.90 #
5. In the design of a certain well, it is anticipated that production will be 375 bbl per day with a
pump setting depth of 6500 ft. Assuming a volumetric efficiency of 75 per cent for the pump,
calculate the rod size and the length of each section of the tapered string if sucker rod are
available in lengths of 25 ft.
Solution
Pump displacement, V = 375/0.75 = 500 bbl/day
From Fig.(1.6), pump displacement of 500 bbl/day and pump setting depth 6500 ft give an API
size 640 with stroke length 144 in.
73
From Table 1-12, for pump setting depth 6500 ft, pump size is 1¾-in. (2.405 sq in.) and rod sizes
are ¾-⅞-1.
Using the equations from Table 1-4,
6. For a well, a 1¾-in. plunger is to be set with 3200 ft of ⅝-in. sucker rods. It is estimated that a
pumping speed of 17 spm and a polished rod stroke length of 42 in. will give the desired
production of 157 bbl per day. It is further estimated that the working fluid level will be about
2000 ft, and that the specific gravity of the produced fluid will be 0.825. Assuming a 30 per cent
reduction due to cyclic loading, calculate the minimum nameplate rating for the electric motor to
be used as the prime mover.
Solution
Hydraulic horsepower, Hh = 7.36×10–6qGD
= 7.36×10–6×157×0.825×2000 = 1.95 hp
Frictional horsepower, Hf = 6.31×10–7WrSN
= 6.31×10–7×3720×42×17 = 1.68 hp
Polished rod horsepower = 1.95 + 1.68 = 3.63 hp
Brake horsepower = 3.63 × 1.5 = 5.44 hp
Minimum nameplate rating with 30 per cent power reduction due to cyclic loading is
= 5.44/0.70 = 7.7 hp #
7. The area within the loop of a certain dynamometer card is 2.97 sq in.; and the area between the
loop and the zero load line is 3.82 sq in. The length of the loop is 4.56 in.; and the instrument
constant for the dynamometer is 5550 lb per in. Calculate the correct counterbalance effect for
the unit.
For the above well, the pumping speed is 20 spm and stroke length is 48 in. Calculate the above-
ground efficiency if the wattmeter (on the line to the electric motor being used as the prime
mover) shows an average power input of 14.5 kw.
Solution
The correct counterbalance effect,
Y A 5550 2 .97
Ci = [ Al + u ] = [3 .82 + ] = 6450 lb#
Ll 2 4 .56 2
14 .5 kw
Average power input = = 19 .43 hp
0.746 kw/hp
Polished rod horsepower from dynamometer card,
74
SYA u N 48 × 5550 × 2097 × 20
Hp = = = 8 .76 hp
396000 L l 396000 × 4 .56
8. For the well of Prob.(26), the depth to the plunger is 5000 ft, and production is 225 bbl/day at the
pumping speed of 19.5 spm. Because of an increase in water cut, it is desired to obtain more
production by increasing pumping to a value greater than 19.5 spm. At what approximate
production rate would a synchronous pumping speed be encountered?
Solution
Order of synchronization, n = 237000 / NL = 237000 / 19 . 5 × 5000 = 2 . 43
To obtain a greater pumping speed, n must be assumed to be 2
N = 237000/2×5000 = 23.7 spm
q = KSpNEv
q/N = KSpEv = Constant
q1/N1 = q2/N2
q2 = 225×23.7/19.5 = 273 bbl per day #
9. A well is producing 240 bbl/day of a fluid having specific gravity of 0.80. The pump is set at
3500 ft on ¾-in. rods, and the plunger size is 1¾ in. Calculate the ideal counterbalance effect for
the unit.
Solution
For ¾-in. rods, M1 = 1.63 lb/ft
For 1¾-in. plunger, Ap = 2.405 sq in.
Weight of rod string, Wr = 3500 × 1.63 lb/ft = 5705 lb
Fluid load, Wf = 0.433G (LAp – 0.294 Wr)
= 0.433×0.8(3500×2.405 – 0.294×5705)= 2334 lb
Ideal counterbalance effect,
Ci =0.5 Wf +[Wr (1 – 0.127G)]
= 0.5×2334 + 5705(1–0.127×0.8)
= 6290 lb #
10. It is desired to put on pump a well having a static fluid level of 1000 ft. The well fluid has a 40
per cent water cut, with oil of gravity 40°API and water of specific gravity 1.015. The installation
is to be designed for an oil production of 125 bbl/day. Reservoir studies and well fluids analyses
indicate a probable pump volumetric efficiency of at least 80 per cent.
(a) Determine the API rating of the pumping unit assembly to be purchased for this
installation.
(b) Determine, for the propose installation, polished rod stroke length, optimum plunger size,
and resulting tubing size and pumping speed.
(c) Design the sucker rod string, assuming sucker rods to be available in lengths of 25 ft.
(d) Calculate the actual oil production for the assumed volumetric efficiency and the
operating conditions of part (b).
(e) An example of a pumping unit assembly which meets the requirements of parts (a) and
(b) is the Bethlehem 160D-20S-64. This unit has a beam load rating of 20,700 lb, an
available counterbalance effect (without auxiliary counterweights) of 11,770 lb, and a
75
peak torque rating of 160,000 in-lb. Compare these values with calculated values under
the selected operating conditions.
( ) What is the maximum sucker rod stress under the selected operating conditions?
( ) Determine the minimum brake horsepower rating for the electric motor to be used as the
prime mover.
(h) The standard unit sheave for the Bethlehem 160D-20S-64 pumping assembly has a pitch
diameter of 24 in., and the double reduction gear has a reduction ratio of 26.4. If motor
speed is 1200 rpm, what should be the pitch diameter of the motor sheave to obtain the
desired pumping speed?
Solution
(a) Production is 125 bbl/day of oil with 40% water cut and if gross production rate is q
Water cut = (q – qo)/q = 0.40
Gross production, q = 125/0.60= 208 bbl/day
Pump displacement, V = 208/0.80 = 260 bbl/day
From Fig. 1.6, with pump setting depth 4500 ft, API unit size 160 is obtained (curve E).
API rating of 160,000 in-lb.#
( ) From Table 1-9 for API 160, polished rod stroke length, S = 64 in. and rod string: ⅝-¾-⅞
Optimum plunger size = 1½ in.
Tubing size = 2 in.
Pumping speed, N = 20 spm (by interpolation)
(c) Sucker rod string design, for 1½-in. plunger, Ap = 1.767 sq in.
R1 = 0.627 – 0.1393×1.767 = 0.380
R2 = 0.199 + 0.0737×1.767 = 0.329
R3 = 0.175 + 0.0655×1.767 = 0.291
L1 = 0.380×4500 = 1710 ft ≈ 1725 ft #
L2 = 0.329×4500 = 1480 ft ≈ 1475 ft #
L3 = 0.291×4500 = 1309 ft ≈ 1300 ft #
α = 64 × 20 × 20 / 70500 = 0 . 363
40 .8 L 2α 40 .8 × 4500 2 × 0 .363
ep = = = 10 in.
E 30 × 10 6
5 .2 GDA p L L L L
et + e r = + 1 + 2 + 3
E At A1 A2 A3
(g) Hh = 7.36×10–6×235×0.901×4500 = 7 hp
Hf = 6.31×10–7×7210×64×20 = 5.8 hp
Brake horsepower = 1.5 (7 + 5.8) = 20 hp #
*****************