Project management
Its origins lie in World War II, when the military authorities used the
techniques of operational research to plan the optimum use of
resources.
One of these techniques was the use of networks to represent a
system of related activities
PERT & CPM are two of the methods of Network analysis. The other
two being “Line of Balance” and Gantt Chart” method. PERT, an
acronym for Programme Evaluation and Review Technique, was
developed in 1958, by the U.S. Navy’s special Project office in
consultation with Allen, Booz and Hamilton a management consulting
firm for aiding in planning and controlling the Polaris Weapon system.
At about the same time, a similar technique known as Critical path
Method (CPM) was initiated by du Pont de Nemours Co. in
consultation with Univac division of Remington Rand Co. CPM is
particularly useful for application in the construction industry.
The use of both the techniques is made in planning and controlling of
the projects. Planning takes place in the beginning of the projects
while control takes place during the work on the project.
With the help of these techniques following parameters need to be
determined
(i) Expected completion date of the project.
(ii) Early and latest start and finish times for each of the activities of the
project.
(iii) The slack for each activity, i.e. the time period by which an activity
can be delayed without delaying the project completion.
Project planning
Project scheduling
Project control
Project team made up of individuals from various areas and
departments within a company
Work Down
Structure
Project Planning
Project Network
Activity-on-arrow (AOA)
arrows represent activities and nodes are events for points in time
2 4
3 Finish work
2
7
Start 1 1
3
B
A
C
Fig (2-3) A must finish before either B or C can start
A
C
B
A C
B D
Fig (2-5) both A and C must finish before either of B or D can start
A B
Dummy
C
D
Fig (2-6) A must finish before B can start
La y 3
La y
foundation Dumm
foundatio 2 0 y
2 3
n
1
Order 2 4
Order
material
material
( a) Incorrect (b) Correct
precedence precedence
relationship relationship