F218-JSW Cement FZE 3000TPD Clinker Plant

Application of fire protection system(fire equipment)


Characteristic of
Building
Fire Protection Fire Pump Set & Fire
No Code Building & Structure Ground Reference of Code
System Water Tank Capacity
Height(m) Floor
Area(m2)
GATE HOUSE , SECURITY AND 50gpm@4.5bar
1 B15a,b,c 3 71 FE FHS P707 Residential
TIME OFFICE 30min
50gpm@4.5bar
2 B1B SHIFT UNIT 5 SETS 3.6 52 FE FHS P707 Residential
30min
50gpm@4.5bar P707 Business if 2 stairs
FE FHS
30min
3 B11 ADMINISTRATION BUILDING 8.4 927
300gpm@4.5bar P709 Business if 1 stair
FE FHS AS
30min
300gpm@4.5bar P705
30min >50 people Assembly A
4 B13 CANTEEN 4.5 678 FE FHS AS
<50 people Mercantile A

50gpm@4.5bar
5 B1M PRAYER ROOM 3.6 52 FE HR P705 Assembly
30min
50gpm@4.5bar
6 B1N VEHICLE PARKING SHED 3.3 336 FE HR P720
30min
50gpm@4.5bar
7 B1C DRIVERS REST ROOM 3.6 202 FE FHS P707 Residential
30min
50gpm@4.5bar
8 B17 SANITARY BLOCK 3 SETS 3.3 28 FE FHS P707 Residential
30min
9 111/211 LIMESTONE CONVEYORING/ 20.39 10246 None According to

0
LIMESTONE PREBLENDING MSDS
SHALE CRUSHING AND
10 112/212 CONVEYING/ AUXILIARY 28.6 12922
MATERIAL PREBLENDING
11 115 LONG BELT CONVEYING None
25.5(>3
12 215 RAW MATERIAL DOSING 309 √
层)
13 216 RAW MATERIAL GRINDING 48.4 755
14 311 HOMEGENIZATION SILO 库顶 42 295
93.95
15 313 PREHEATER 设备平台 388
106.3
16 316 KILN 13
17 317 CLINKER COOLER 16.8 948
SELECTIVE NON-CATALYTIC
18 31A 6 110
REACTION SYSTEM
19 411 CLINKER STORAGE 57.8 706 √
20 516 BULK CLINKER LOADING 26 87
21 613 COAL GRINDING 29.8 559
22 715 COMPRESSED AIR STATION 6 96
23 711 CCR/LABORATORY
油罐 35m3
油 防护堤
DIESEL OIL STORAGE AND
24 616 罐¢3×5.2 64m2
SUPPLY
油泵房 3 油泵房
13.6
MECHANICAL & ELECTRICAL
718 10 1170
25 WORKSHOP
26 713 WARE HOUSE 10 1200
1
30 913 RAW WATER TREATMENT 7 480
COMBINED PUMPING
7 274
31 919 STATION & TANK
FIRE FIGHTING PUMPING
32 91B STATION & TANK
33 91N WASTE WATER TREATMENT 4.5 62
42 G1B WEIGH BRIDGE
RAW MATERIALS GRINDING
210 SUBSTATION (COMBINED
43 WITH 216 ER)
MAIN SUBSTATION
811
44 (COMBINED WITH CCR)
LIMESTONE CONVEYING
833
45 ELECTRICAL ROOM
RAW MATERIAL STORAGE
834
46 ELECTRICAL ROOM
RAW MATERIAL
PREBLENDING AND
835
TARNSPORT ELECTRICAL
47 ROOM
CLINKER SILO ELECTRICAL
836
48 ROOM
UTLITY ELECTRICAL ROOM
837
49 (COMBINED WITH CCR)
RAW MATERIALS GRINDING
216
50 ELECTRICAL ROOM
PREHEATER ELECTRICAL
31Z ROOM (COMBINED WITH
51 CCR)
2
CLINKER COOLER
310 ELECTRICAL ROOM
52 (COMBINED WITH CCR)