Issued Priority of SR. No. Issue Date System Location Sub Location Query Status Remarks By Problem Fire Fighting System 1 11/Nov/15 MECH FF FW PUMPS FW PUMPS SHED 1 Pressure switch's union, elbow joints leakage /seepage found Open
Electric motor driven pump discharge section less thread
2 11/Nov/15 MECH FF FW PUMPS FW PUMPS SHED 2 Open engagement found Diesel engine driven pump discharge section less thread 3 11/Nov/15 MECH FF FW PUMPS FW PUMPS SHED 2 Open engagement found Gap between pipeline and guides on sleepers , guides to be fixed 4 11/Nov/15 MECH FF FW TANK FW PSV 2 Open closer to FW piping Gap between pipeline and guides on sleepers , guides to be fixed 5 11/Nov/15 MECH FF FW TANK FH FUTURE FW TANK 2 Open closer to FW piping Gap between pipeline and guides on sleepers , guides to be fixed 6 11/Nov/15 MECH FOAM SKID FOAM SKID 2 Open closer to FW piping Gap between pipeline and guides on sleepers , guides to be fixed 7 11/Nov/15 MECH FOAM SKID WATCH TOWER 2 Open closer to FW piping Water turbine outlet to FW tank inlet piping to be installed with 8 11/Nov/15 MECH FF FW TANK/ TURBINE TURBINE AREA 1 Open Pressure Gauge on it 9 11/Nov/15 MECH FF TURBINE ROOM TURBINE AREA 1 Turbine gland packing Open 10 11/Nov/15 MECH FF FOAM MONITORS FMs 1 Butterfly valves need to be replaced on Foam Monitors Open 11 11/Nov/15 MECH FF FOAM MONITORS FMs 2 05 Nos foam tanks not in proper operation status Open 12 11/Nov/15 GANTRY EYE WASHER 1 Eye washing line incomplete Open For FW piping guides fixing, painting and welding flux cleaning to be 13 11/Nov/15 MECH FF HSD TANK INSIDE HSD DYKE WALL 2 Open done For FW piping guides fixing, painting and welding flux cleaning to be 14 11/Nov/15 MECH FF MS TANK INSIDE MS DYKE WALL 2 Open done Foam System For Foam piping guides fixing, painting and welding flux cleaning to 1 11/Nov/15 MECH FF HSD TANK INSIDE HSD DYKE WALL 2 Open be done For Foam piping guides fixing, painting and welding flux cleaning to 2 11/Nov/15 MECH FF MS TANK INSIDE MS DYKE WALL 2 Open be done 3 11/Nov/15 MECH FF FOAM PIPING OUT SIDE DYKE WALL 2 For Foam piping guides painting work remaining Open FOAM LINES FOR 4 11/Nov/15 MECH FF FOAM SKID 1 04 Nos pressure gauges not installed Open MS/HSD 5 11/Nov/15 MECH FF FOAM SKID FOAM SKID 1 Foam tank not connected to foam inductor Open Gantry HSD/MS loading arms jugs(to avoid oil wastage) not installed on 1 11/Nov/15 MECH PD GANTRY LOADING ARMS 1 Open open end Remaining Work / Punch List (Issued By HTL-Mech) For Haris & Co. Mechanical Work Issued Priority of SR. No. Issue Date System Location Sub Location Query Status Remarks By Problem Flow meter (PD Meter) not fixed with expansion bolts and PD meter 2 11/Nov/15 MECH PD GANTRY LOADING SYSTEM 1 Open to base supports nuts & bolts missing 3 11/Nov/15 MECH PD GANTRY LOADING SYSTEM 1 Guides for piping on sleepers missing Open 4 11/Nov/15 MECH PD GANTRY LOADING SYSTEM 1 PSV for MS/HSD bolts are to be tightened Open 5 11/Nov/15 MECH PD GANTRY DECANTING SYSTEM 1 Decanting hose pipe including coupling to be installed Open 6 11/Nov/15 MECH PD GANTRY DECANTING SYSTEM 1 Decanting hose pipe hangers to be installed Open HSD decanting header to underground HSD line has less thread 7 11/Nov/15 MECH PD GANTRY DECANTING SYSTEM 2 Open engagement Product Piping PRODUCT PUMP HSD Pump # 01 1 11/Nov/15 MECH PD 1 On discharge section P/I point must be dead plug Open SHED (Future) PRODUCT PUMP HSD Pump # 01 2 11/Nov/15 MECH PD 1 On suction section P/I & Dry-run points must be dead plug Open SHED (Future) PRODUCT PUMP HSD Pump # 01 3 11/Nov/15 MECH PD 1 Discharge & suction lines not blind Open SHED (Future) PRODUCT PUMP 4 11/Nov/15 MECH PD HSD Pump # 02 1 On discharge line do air vent 1ft. down Open SHED PRODUCT PUMP 5 11/Nov/15 MECH PD HSD Pump # 02 1 Ball valve to be installed on strainer drain Open SHED PRODUCT PUMP 6 11/Nov/15 MECH PD MS Pump # 03 1 On discharge line do air vent 1ft. down Open SHED PRODUCT PUMP 7 11/Nov/15 MECH PD MS Pump # 03 1 Ball valve to be installed on strainer drain Open SHED PRODUCT PUMP 8 11/Nov/15 MECH PD MS Pump # 03 1 Less thread engagement Open SHED PRODUCT PUMP MS Pump # 04 9 11/Nov/15 MECH PD 1 On discharge section P/I point must be dead plug Open SHED (Future) PRODUCT PUMP MS Pump # 04 10 11/Nov/15 MECH PD 1 On suction section P/I & Dry-run points must be dead plug Open SHED (Future) PRODUCT PUMP MS Pump # 04 11 11/Nov/15 MECH PD 1 Discharge & suction lines not blind Open SHED (Future) MS Tank 1 11/Nov/15 MECH PD MS TANK MS TANK 1 01 Nos anchor chair washer missing Open 2 11/Nov/15 MECH PD MS TANK INLET/OUTLET 1 PSV bolts have less threads engagement Open 3 11/Nov/15 MECH PD MS TANK MS TANK 1 Anchor chairs all nuts/bolts to be tightened Open 4 11/Nov/15 MECH PD MS TANK ROOF 1 2" nozzle for ATG (Future Electrical) must be blind Open Remaining Work / Punch List (Issued By HTL-Mech) For Haris & Co. Mechanical Work Issued Priority of SR. No. Issue Date System Location Sub Location Query Status Remarks By Problem 5 11/Nov/15 MECH PD MS TANK ROOF 1 4" nozzle Radar Level Transmitter installation pending (Electrical) Open 6 11/Nov/15 MECH PD MS TANK ROOF 1 4" diphatch cover missing Open 7 11/Nov/15 MECH PD MS TANK IFR 1 Floatation Test Open 8 11/Nov/15 MECH PD MS TANK SHELL 1 Low level switch not installed (Electrical) Open 9 11/Nov/15 MECH PD MS TANK SHELL 1 Low temperature gauge (Electrical) Open Paint top coat issues found. Truly, top coat has no bond to NCR midcoat. From shell plates and wind girder paint lost Open/NCR 10 11/Nov/15 MECH PD MS TANK MS TANK 1 already adhesion/bonding that's why water flow scratch off the paint not closed issued from wind girder. HSD Tank 1 11/Nov/15 MECH PD HSD TANK INLET/OUTLET 1 PSV bolts have less threads engagement Open 2 11/Nov/15 MECH PD HSD TANK HSD TANK 1 Anchor chairs all nuts/bolts to be tightened Open 3 11/Nov/15 MECH PD HSD TANK ROOF 1 2" nozzle for ATG (Future Electrical) must be blind Open 4 11/Nov/15 MECH PD HSD TANK ROOF 1 4" nozzle Radar Level Transmitter installation pending (Electrical) Open 5 11/Nov/15 MECH PD HSD TANK ROOF 1 4" diphatch cover missing Open 6 11/Nov/15 MECH PD HSD TANK SHELL 1 Low level switch not installed (Electrical) Open 7 11/Nov/15 MECH PD HSD TANK SHELL 1 Low temperature gauge (Electrical) Open NCR Paint top coat issues found. Truly, top coat has no bond to Open/NCR 8 11/Nov/15 MECH PD HSD TANK HSD TANK 1 already midcoat. Paint has lost adhesion. not closed issued FW Tank NCR Open/NCR 1 11/Nov/15 MECH PD FW TANK FW TANK 1 Paint top coat issues found. already not closed issued