Typical Beam Detail: B-1 Detail B-4 Detail
Typical Beam Detail: B-1 Detail B-4 Detail
5.00 M. 3.30 M.
SPAN SPAN
S T R U C T U R A L
50
CUT BARS
450
450
500
500
500
450
CUT BARS CUT BARS
50
50
40
40
40
40
40
40
40 40 40 40 40
STRAIGHT BARS 40 STRAIGHT BARS STRAIGHT BARS
@ SUPPORT @ MIDSPAN @ SUPPORT @ MIDSPAN @ SUPPORT
@ SUPPORT
10.00 METERS
CL
5.00 M. 5.00 M. 5.00 M.
SPAN(L) SPAN
800
800
500
500
500
STRAIGHT BARS CUT BARS
50
FOR TORSIONAL RESISTANCE FOR TORSIONAL RESISTANCE
40
40
40
40
40
40
40 40 40 40 40 40
STRAIGHT BARS STRAIGHT BARS STRAIGHT BARS STRAIGHT BARS STRAIGHT BARS
@ SUPPORT @ SUPPORT @ SUPPORT @ MIDSPAN @ SUPPORT
@ MIDSPAN FOR TORSIONAL RESISTANCE
B-5 DETAIL
B-2 DETAIL
NOT DRAWN TO SCALE
NOT DRAWN TO SCALE
6.70 METERS
CL 5.00 M.
3.35 M. 3.35 M.
SPAN
SPAN(L)
L/3 L/3
L/3 L/3
STAIGHT BARS
450
450
450
500
500
800
CUT BARS
50
40
40
40
FOR TORSIONAL RESISTANCE STRAIGHT BARS FOR TORSIONAL RESISTANCE
40 40 40
40
40
40
40 40 40 STRAIGHT BARS STRAIGHT BARS
@ SUPPORT @ MIDSPAN @ SUPPORT
STRAIGHT BARS STRAIGHT BARS STRAIGHT BARS
@ SUPPORT @ SUPPORT
@ MIDSPAN FOR TORSIONAL RESISTANCE
B-6/RB-6 DETAIL
B-3 DETAIL NOT DRAWN TO SCALE
DRY SEAL: FROM THE OFFICE OF: REG. NO: 0 0 4 2 1 9 5 PROJECT: APPROVED: SHEET CONTENT: SHEET NO.
PTR. NO. 3 4 8 5 9 3 7 6
ENGR. CECILIO C. DELA VEGA JR. DATE: 01 - 09 - 2018 PROPOSED THREE- STOREY OFFICE BUILDING
- SCHEDULE OF BEAMS: B-1, B-2, B-3, B-4, B-5, & B-6
S 10
C I V I L E N G I N E E R PLACE: TUBOD, LANAO DEL NORTE LOCATION: PUROK 5 POBLACION, TUBOD,LANAO DEL NORTE LANAO FARMS INC. 13 24
TIN 156-890-235