Labour Charges
Description Rate
Bitumen Sprayer Man 465.00/Day
Bitumen Raker Man 484.00/Day
Heat Master Operator 484.00/Day
Mini Hot Mix Plant Operator 484.00/Day
Gunnuting Plant Operator 405.00/Day
Gunnuting Gun Operator 441.00/Day
Road Mazdoor Gr.- I 401.00/Day
Road Mazdoor Gr.-II 358.00/Day
Head Mazdoor 413.00/Day
=Rs.5797.30/MT
=Rs.46390.30/MT
Sl
Description Unit Rate
No.
1 Clearing Heavy Jungle /Sqm. 4.60
26 B.C. 30/ 40mm Thick (CMP) Using Plastic Waste /Cum. 7872.73
KM Km 3/6
28 Patch Work Using 45mm IRC Metal /Cum. 3158.63 #VALUE! #VALUE! #VALUE! #VALUE!
29 Patch Work Using 13.20mm IRC Metal /Cum. 3441.63 #VALUE! #VALUE! #VALUE! #VALUE!
30 Premix Carpet With Seal Coat using Mini Hot Mix Plant /Sqm. 199.47 #VALUE! #VALUE! #VALUE! #VALUE!
31 BM 50mm (For Patch Work) using Mini Hot Mix Plant /Cum. 6099.62 #VALUE! #VALUE! #VALUE! #VALUE!
32 Dry Lean Cement Concrete for Sub-Base /Cum. 3397.43 #VALUE! #VALUE! #VALUE! #VALUE!
KM
round 2
2. Removing the Picked up stuff Mazdoor Ist 1.08x1/8x 401.00 /No - 54.14
4. Spreading the Bitumen for Tack Coat excluding cost of Bitumen -L.S.- - 3.10
5. Premixing the chips with hot Bitumen in the drum mixer and laying
0.625 cum of metal with 44 kg per cum of chips excluding the cost of the
bitumen - - L. S. - - - 15.75
6. Levelling and tamping the premix in the patches and pot holes rolling etc - 4.73
Picking 5cm to 10cm old metalled surface and sectioning 1Sqm. = 10.83 /Sqm.
18
1.00 Cum. Cost of 45mm IRC at Rs. #VALUE! /cum. = #VALUE!
44 Kg Cost of VG10 Bitumen at Rs. 32541.94 /MT = #VALUE!
1.00 Cum. Labour charges at Rs. 256.00 /cum. = #VALUE!
Rate for 1.00 cum. Rs. #VALUE!
34
1.00 Cum. Cost of 45mm IRC at Rs. #VALUE! /cum. = #VALUE!
44 Kg Cost of VG10 Bitumen at Rs. 32541.94 /MT = #VALUE!
1.00 Cum. Labour charges at Rs. 256.00 /cum. = #VALUE!
Rate for 1.00 cum. Rs. #VALUE!
50
1.00 Cum. Cost of 45mm IRC at Rs. #VALUE! /cum. = #VALUE!
44 Kg Cost of VG10 Bitumen at Rs. 32541.94 /MT = #VALUE!
1.00 Cum. Labour charges at Rs. 256.00 /cum. = #VALUE!
Rate for 1.00 cum. Rs. #VALUE!
66
1.00 Cum. Cost of 45mm IRC at Rs. #VALUE! /cum. = #VALUE!
44 Kg Cost of VG10 Bitumen at Rs. 32541.94 /MT = #VALUE!
1.00 Cum. Labour charges at Rs. 256.00 /cum. = #VALUE!
Rate for 1.00 cum. Rs. #VALUE!
82
1.00 Cum. Cost of 45mm IRC at Rs. /cum. =
44 Kg Cost of VG10 Bitumen at Rs. 32541.94 /MT =
1.00 Cum. Labour charges at Rs. 256.00 /cum. =
Rate for 1.00 cum. Rs.
98
1.00 Cum. Cost of 45mm IRC at Rs. /cum. =
44 Kg Cost of VG10 Bitumen at Rs. 32541.94 /MT =
1.00 Cum. Labour charges at Rs. 256.00 /cum. =
Rate for 1.00 cum. Rs.
Motor Grader including fuel / Hour (Local Rate) =Rs. 1611.07 /Hour
Wet Mix Plant 75 tonne capacity/ hr (Local Rate) =Rs. 1063.45 /Hour
Vibrator Roller
Hire charges excluding fuel charges per day =Rs. 5169.52
Fuel charges per day 2.50 lit/Hr x 8.00 Hrs. x 61.40 /lit =Rs. 1228.00
Total Hire charges per day including Fuel =Rs. 6397.52
Hire charges of Vibrator Roller per Hour 6397.52 / 8 =Rs. 799.69 /Hour
Tipper Trucks
Hire charges excluding fuel charges per Hour1041.90 / 8 =Rs. 130.24
Fuel charges per day 3.25 lit/Hr x 61.40 /lit =Rs. 199.55
Total Hire charges per Hour including Fuel =Rs. 329.79 /Hour
Water Tanker
Hire charges excluding fuel charges per day =Rs. 814.29
Fuel charges per day 25.00 /Day 61.40 /lit =Rs. 1535.00
Total Hire charges per day including Fuel =Rs. 2349.29
Hire Charges for Water Tanker per Hour 2349.29 / 8 =Rs. 293.66 /Hour
Front end loader 5 cum capacity
Hire charges excluding fuel charges per day =Rs. 1147.62
Fuel charges per day 10.00 lit/Hr x 8.00 Hrs. x 61.40 /lit =Rs. 4912.00
Total Hire charges per day including Fuel =Rs. 6059.62
Hire charges of Front end loader per Hour 6059.62 / 8 =Rs. 757.45 /Hour
Tipper
Hire charges excluding fuel charges per day =Rs. 1041.90
Fuel charges per day 3.25lit.of diesel x 8hrs 61.40 /lit =Rs. 1596.40
Total Hire charges per day including Fuel =Rs. 2638.30
Total Hire charges per Hour including Fuel =Rs. 329.79
Water Tankers
Hire charges excluding fuel charges per day =Rs. 814.29
Fuel charges per day 25lit.of diesel 61.40 /lit =Rs. 1535.00
Total Hire charges per day including Fuel =Rs. 2349.29
Total Hire charges per Hour including Fuel =Rs. 293.66
Vibratory Power Roller 8-10 tonne
Hire charges excluding fuel charges per day =Rs. 5169.52
Fuel charges per day 3.00lit.of diesel x 8hrs 61.40 /lit =Rs. 1473.60
Total Hire charges per day including Fuel =Rs. 6643.12
Total Hire charges per Hour including Fuel =Rs. 830.39
Motor Grader including fuel per Hour (Local Rate) =Rs. 1611.07
Base Mix Plant (pug mill) including fuel per hour (local rate) =Rs. 795.12
Total Hire Charges for machineries for 1.00 Cum of WMM =Rs. 357.05 /Cum.
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5169.52/8 =Rs. 646.19
Fuel charges per day 2.50 litres x 61.40 /lit =Rs. 153.50
Hire Charges including fuel charges per hour Rs. 799.69
Out turn of Vibrator Roller per hour= 350sqm. of 50 mm thick
Hire Charges for Vibrator roller per 10sqm. = 799.69 X 10 =Rs. 22.85
350
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2330.48 /8 =Rs. 291.31
Fuel charges per hour 6 litres per hour X 61.40 /lit =Rs. 368.40
Hire Charges including fuel charges per hour Rs. 659.71
Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick
Hire Charges for paver finisher per 10sqm. = 659.71 X 10 =Rs. 48.87
135
Hire Charges for Tipper per 10sqm. = 329.79 x6x10 =Rs. 146.57
135
Total hire charges for machineries per 10 sqm =651.81+ 22.85+ 48.87+ 146.57
= 870.10 /10sqm
LABOUR CHARGES PER 1200SQM
For loading materials into CMP
33.00 Nos Mazdoor Ist Class @Rs. 401.00 /each = 13233.00
25.00 Nos Mazdoor IInd Class @Rs. 358.00 /each = 8950.00
For attending Paver Finisher
10.00 Nos Mazdoor Ist Class @Rs. 401.00 /each = 4010.00
Total Labour Charges per 1200sqm = 26193.00
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5169.52/8 =Rs. 646.19
Fuel charges per day 2.50 litres x 61.40 /lit =Rs. 153.50
Hire Charges including fuel charges per hour Rs. 799.69
Out turn of Vibrator Roller per hour= 320sqm. of 50 mm thick
Hire Charges for Vibrator roller per 10sqm. = 799.69 X 10 =Rs. 24.99
320
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2330.48 /8 =Rs. 291.31
Fuel charges per hour 6 litres per hour X 61.40 /lit =Rs. 368.40
Hire Charges including fuel charges per hour Rs. 659.71
Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick
Hire Charges for paver finisher per 10sqm. = 659.71 X 10 =Rs. 48.87
135
Hire Charges for Tipper per 10sqm. = 329.79 x6x10 =Rs. 146.57
135
Total hire charges for machineries per 10 sqm = 651.81+ 24.99+ 48.87+ 146.57
= 872.24 /10sqm
LABOUR CHARGES PER 1200SQM
For loading materials into CMP
33.00 Nos Mazdoor Ist Class @Rs. 401.00 /each = 13233.00
25.00 Nos Mazdoor IInd Class @Rs. 358.00 /each = 8950.00
For attending Paver Finisher
10.00 Nos Mazdoor Ist Class @Rs. 401.00 /each = 4010.00
Total Labour Charges per 1200sqm = 26193.00
0.240 Cum Cost of 26.50 - 13.20mm IRC at Rs. 1566.10 /cum. = 375.86
0.250 Cum Cost of 13.20-2.36mm IRC at Rs. 1030.03 /cum. = 257.51
0.230 Cum Cost of 2.36mm & below IRC at Rs. 974.70 /cum. = 224.18
0.000 Cum Cost of Stone Dust (Filling mat.) at Rs. 401.36 /cum. = 0.00
53.20 Kg Cost of VG30 Bitumen at Rs. 33333.98 /MT = 1773.37
10.00 Sqm Hire charges at Rs. 872.24 /10sqm = 872.24
10.00 Sqm Labour charges at Rs. 218.28 /10sqm = 218.28
Rate for 10 sqm =Rs. 3721.44
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen
(SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of
material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
complete as perClause 502 of MORTH Rev-5
Labour Charges per 500 sqm for preparation of surface
10.00 Nos Mazdoor Ist Grade @Rs 401.00 /each =Rs 4010.00
16.00 Nos Mazdoor IIst Grade @Rs 358.00 /each =Rs 5728.00
For Applying Primer
4.00 Nos Mazdoor IIst Grade @Rs 358.00 /each =Rs 1432.00
Total Labour Charges per 500 sqm =Rs 11170.00
7.00 Kgs Cost of Bitumen Emulsion - SS1 @Rs 45040.11 /MT =Rs 315.28
10.00 Sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 Sqm Labour Charges @Rs 223.40 /10sqm =Rs 223.40
Rate for 10 sqm =Rs 553.68
9.00 Kgs Cost of Bitumen Emulsion (SS1) @Rs 45040.11 /MT =Rs 405.36
10.00 Sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 Sqm Labour Charges @Rs 223.40 /10sqm =Rs 223.40
Rate for 10 sqm =Rs 643.76
Rate per 1.00 sqm =Rs 64.38 /sqm
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion
(RS1) per 10 sqm for preparatory to another bituminous construction over it including cost
of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
complete as perClause 503 of MORTH Rev-5
2.00 Kgs Cost of RS-I Bitumen emulsion @Rs 30014.61 /MT =Rs 60.03
10.00 Sqm Hire for bitumen boiler @Rs /10sqm =Rs
10.00 sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 sqm Labour Charges @Rs 75.90 /10sqm =Rs 75.90
Rate for 10 sqm =Rs 150.93
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using
2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous
construction over it including cost of material, labour charges, rentals for machinery, fuel
and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Labour Charges per 500 sqm
3.00 Nos Mazdoor IInd Grade(Applying TC)@Rs 358.00 /each =Rs 1074.00
Total Labour Charges per 500 sqm =Rs 1074.00
2.50 Kgs Cost of RS-I Bitumen emulsion @Rs 30014.61 /MT =Rs 75.04
10.00 Sqm Hire for bitumen boiler @Rs /10sqm =Rs
10.00 Sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 Sqm Labour Charges @Rs 21.48 /10sqm =Rs 21.48
Rate for 10 sqm =Rs 111.52
21
0.18 Cum. Cost of 13.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 11.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 6.70mm IRC at Rs. #VALUE! /cum.
= #VALUE!
24.40 Kgs. Cost of VG30 Bitumen at Rs. 33381.94 /MT = #VALUE!
10.00 Sqm Hire and Labour Charges at Rs. 639.47
/10sqm. = #VALUE!
Rate for 10 sqm. = #VALUE!
Rate for 1 sqm. =Rs. #VALUE! /sqm.
42
0.18 Cum. Cost of 13.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 11.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 6.70mm IRC at Rs. #VALUE! /cum.
= #VALUE!
24.40 Kgs. Cost of VG30 Bitumen at Rs. 33381.94 /MT = #VALUE!
10.00 Sqm Hire and Labour Charges at Rs. 639.47
/10sqm. = #VALUE!
Rate for 10 sqm. = #VALUE!
Rate for 1 sqm. =Rs. #VALUE! /sqm.
63
0.18 Cum. Cost of 13.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 11.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 6.70mm IRC at Rs. #VALUE! /cum.
= #VALUE!
24.40 Kgs. Cost of VG30 Bitumen at Rs. 33381.94 /MT = #VALUE!
10.00 Sqm Hire and Labour Charges at Rs. 639.47
/10sqm. = #VALUE!
Rate for 10 sqm. = #VALUE!
Rate for 1 sqm. =Rs. #VALUE! /sqm.
84
0.18 Cum. Cost of 13.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 11.20mm IRC at Rs. #VALUE! /cum.
= #VALUE!
0.09 Cum. Cost of 6.70mm IRC at Rs. #VALUE! /cum.
= #VALUE!
24.40 Kgs. Cost of VG30 Bitumen at Rs. 33381.94 /MT = #VALUE!
10.00 Sqm Hire and Labour Charges at Rs. 639.47
/10sqm. = #VALUE!
Rate for 10 sqm. = #VALUE!
Rate for 1 sqm. =Rs. #VALUE! /sqm.
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5169.52/8 =Rs. 646.19
Fuel charges per day 2.50 litres x 61.40 /lit =Rs. 153.50
Hire Charges including fuel charges per hour Rs. 799.69
Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick
Hire Charges for Vibrator roller per 10sqm. = 799.69 X 10 =Rs. 19.99
400
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2330.48 /8 =Rs. 291.31
Fuel charges per hour 6 litres per hour X 61.40 /lit =Rs. 368.40
Hire Charges including fuel charges per hour Rs. 659.71
Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick
Hire Charges for paver finisher per 10sqm. = 659.71 X 10 =Rs. 38.81
170
Hire Charges for Tipper per 10sqm. = 329.79 x6x10 =Rs. 116.40
170
Total hire charges for machineries per 10 sqm =517.62+ 19.99+ 38.81+ 116.40
= 692.82 /10sqm
LABOUR CHARGES PER 1200 SQM
For loading materials into CMP
33.00 Nos Mazdoor Ist Class @Rs. 401.00 /each = 13233.00
25.00 Nos Mazdoor IInd Class @Rs. 358.00 /each = 8950.00
For attending Paver Finisher
10.00 Nos Mazdoor Ist Class @Rs. 401.00 /each = 4010.00
Total Labour Charges per 1200sqm = 26193.00
Total Hire charges for Machineries per10sqm = 4.74 + 2.70 =Rs. 7.44
Total Labour charges for laying gravel per Cum 802.00 =Rs. 8.02
100
Total Hire and Labour charges = 7.44 + 8.02 =Rs. 15.46
Km 3/6
1.16 Cum. Cost of Gravel at Rs. 504.10 /Cum. = 584.76
1.00 Cum. Hire and Labour charges at Rs. 15.46 /Cum. = 15.46
Rate for 1.00 cum. Rs. 600.22