M/S MAHATO CONSTRUCTION


EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
Project
UTCL(RAWAN CEMENT WORKS) ,BALODA BAZAR FORM: QF-1
cilent UTCL CONTRACTOR- M/S Mahato Construction
Location- Date of Sampling-

Description of Material- Date of Testing-


Total wt. ( in gms)-
Source Of Material-

SIEVE ANALYSIS REPORT (COARSE AGGREGATE) AS PER (IS:2386) PART-I


Weight Limits as per IS:383
Cummulative %
SL. NO Retained % wt. Retained % Passing Remarks
of wt. Retained
Sieve Size (gms) 20mm 10mm

1 100 -
40mm
2 85-100 -
20mm
3 - 100
12.5mm
4 0-20 85-100
10mm
5 0-5 0-20
4.75mm
6 - 0-5
2.36mm
7 - -
pan
Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
M/S MAHATO CONSTRUCTION
Project EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
UTCL (RAWAN CEMENT WORKS) FORM: QF-6
CILENT UTCL CONTRACTOR M/S Mahato Construction
Location- Date of Sampling-

Description of Material- Date of Testing-

SILT CONTENT IN SAND AS PER : CPWD Specification


Description value CPWD standards
a) Total volume of sand taken (ML)

b) volume of sand after submergence(ML) The value of silt content should not
more then 8 % as per CPWD
c) volume of silt after submergence(ML) specification

d) percentage of silt content


Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
M/S MAHATO CONSTRUCTION
Project EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR UTCL
(RAWAN CEMENT WORKS) ,BALODO BAZAR
CILENT UTCL CONTRACTOR- M/S Mahato Construction
Location- - Date of Sampling-

Description of Material- Date of Testing-

Source Of Material- Total wt. ( in gm)-

SIEVE ANALYSIS REPORT (FINE AGGREGATE ) AS PER (IS:2386) PART-I


Weight Cumulative Limits as per IS:383
Percenting e
SL. NO Sieve Size Retained % of wt. % Passing
wt. Retained
(gm) Retained ZONE 1 ZONE 2

1 10mm 100 100

2 4.75mm 90-100 90-100

3 2.36mm 60-95 75-100

4 1.18mm 30-70 55-90

5 600micon 15-34 35-59

6 300micron 5-20 8-30

7 150micron 0-10 0-10

8 PAN
Comments (if any):

Signature of Mahato Signature of UT

Date:-
FORM: QF-5

m)-

386) PART-I
imits as per IS:383
ZONE 3 ZONE 4

100 100

90-100 95-100

85-100 95-100

75-100 90-100

60-79 80-100

12-40 15-50

0-10 0-15

Signature of UTCL

Date:-
M/S MAHATO CONSTRUCTION

Project EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR UTCL


(RAWAN CEMENT WORKS) BALODA BAZAR FORM: QF-4
CILENT- UTCL CONTRACTOR- MAHATO CONSTRUCTION

Location- Date of Sampling-

Description of Material- Date of Testing-

MOISTURE CONTENT TEST FOR FINE & COARSE AGGREGATE AS PER IS 2386 PART 3

20MM 10MM SAND


SL NO. DETAILS
trail-1 trail-2 trail-1 trail-2 trail-1

1 container no.

2 wt. of wet sample (w1)

3 wt .of oven dry sample(w2)

moiture content (w)% =(w1-


4
w2)/w2*100

5 average moisture content %

Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
FORM: QF-4

6 PART 3

SAND
trail-2
M/S MAHATO CONSTRUCTION
EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
Project
UTCL(RAWAN CEMENT WORKS) ,BALODA BAZAR FORM: QF-8(A)
cilent UTCL CONTRACTOR- M/S Mahato Construction

CONCRETE SLUMP TEST AS PER IS: 1199


Brand and type of cement: Structure:
Grade of concrete: Sample date:
Water /cement ratio: Sample tested:

Sl.no Particulars 1 2 3 4
1 Height of slump cone (H1) mm

2 Highest point of subsided concrete (H2) mm

3 Slump value (H1 - H2) mm

AVERAGE SLUMP OF CONCRETE=

Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
M/S MAHATO CONSTRUCTION
EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
Project
UTCL (RAWAN CEMENT WORKS) BALODA BAZAR FORM: QF-10
CILENT UTCL CONTRACTOR M/S Mahato Construction
Location- Date of Sampling-

Grade of concrete- Date of Testing-

CONCRETE CUBE STRENGHT AS PER (IS:516)


AVERAGE
DATE OF DATE OF AGE OF WT. OF CUBE COMP.
SL.NO STRUCTURE NAME GRADE LOADS IN (KN) COMP.STRENGTH
CASTING TESTING CUBE(days) (gms) STRENGTH(N/mm2)
N/mm2

Comments (if any):

Signature of Mahato Signature of UTCL


Date:- Date:-
M: QF-10

REMARKS

e of UTCL
ate:-
M/S MAHATO CONSTRUCTION
EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
Project
UTCL(RAWAN CEMENT WORKS) ,BALODA BAZAR
cilent UTCL CONTRACTOR- M/S Mahato Construction
Location- Date of Sampling-

Description of Material- Date of Testing-


Total wt. ( in gms)-
Source Of Material-

COMBIND COARSE AGGREGATE GRADING AS PER (IS:2386) PART-I


AVG%
…..% ….% comb. In agg.
PASSING(INDIVIDUAL)
SL. NO Sieve Size
20MM 10MM (% of 20mm) (% of 10mm) % passing

1
63mm
2
40mm
3
20mm
4
12.5mm
5
10mm
6
4.75mm
7
2.36mm
8
pan
Comments (if any):

Signature of Mahato
Date:-
N

FORM: QF-2

S:2386) PART-I

IS Limit % of passing

lower higher

100 100

100 100

95 100

- -

22 55

0 10

- -

Signature of UTCL
Date:-
M/S MAHATO CONSTRUCTION
EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
Project UTCL(RAWAN CEMENT WORKS) ,BALODA BAZAR FORM: QF-7
cilent UTCL CONTRACTOR- M/S Mahato Construction
Location- Date of Sampling-
Description of Material- Date of Testing-
Source Of Material- Total wt. ( in gms)-
SPECIFIC GRAVITY OF (COARSE AGGREGATE) AS PER (IS:2386) PART-3
SL.NO DESCRIPTION TRIAL 1 TRIAL 2
1 weight of saturated in water (A)=

2 weight of saturated surface dry aggregate in air (B)=

3 weight of oven dried aggregate in air ( C) =

4 Specific garvity C/(B-A) =

5 water absorption 100*(B-C)/C=


Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
FORM: QF-7

86) PART-3
AVERAGE
M/S MAHATO CONSTRUCTION

EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR


Project UTCL(RAWAN CEMENT WORKS) ,BALODA BAZAR
FORM: QF-9

cilent UTCL CONTRACTOR- M/S Mahato Construction


Location- Date of Sampling-
Description of Material- Date of Testing-
Source Of Material- Total wt. ( in gms)-

MOISTURE CORRECTION FOR CONCRETE(IS:456)

CEMENT 20mm 10mm sand admix. water


SL.N0 DETAILS
kg/m3 kg/m3 kg/m3 kg/m3 kg/m3 kg/m3

1 surface saturted dry per 1 cum


2 % of moisture in ingredient's
3 moisture content in kg
4 % of water absorption
5 water absorption in kg
6 correction of water
7 net wet (after correction) /m3
8 batch qty. For m3
Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
FORM: QF-9

remarks

Signature of UTCL
M/S MAHATO CONSTRUCTION
EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
Project UTCL(RAWAN CEMENT WORKS) ,BALODA BAZAR
FORM: QF-3

cilent UTCL CONTRACTOR- M/S Mahato Construction


Location- Date of Sampling-
Description of Material- Date of Testing-
Source Of Material- Total wt. ( in gms)-

FLAKINESS INDEX (COARSE AGGREGATE) AS PER (IS:2386) PART-I

Weight Retained Wt. retained on wt. pass through


SL. NO Sieve Size(mm) (gms) flakiness scale flakiness scale Remarks
(A) (B) ( C)
1 63-50
2 50-40
3 40-25
4 25-20
5 20-16
6 16-12.5
7 12.5-10
8 10-6.3
9 total
FLAKINESS INDEX = C/A *100 =

LIMIT MAX = 20 %
Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
M/S MAHATO CONSTRUCTION
EXECUTION OF CIVIL AND STRUCTURAL WORKS FOR
Project UTCL (RAWAN CEMENT WORKS) ,BALODA BAZAR FORM: QF-3

cilent UTCL CONTRACTOR- M/S Mahato Construction


Location- Date of Sampling-
Description of Material- Date of Testing-
Source Of Material- Total wt. ( in gms)-

ELONGNATION INDEX (COARSE AGGREGATE) AS PER (IS:2386) PART-I


Weight Wt. retained on wt. pass through
SL. NO Sieve Size(mm) Retained (gms) elongnation scale elongnation scale Remarks
(A) (B) ( C)
1 63-50
2 50-40
3 40-25
4 25-20
5 20-16
6 16-12.5
7 12.5-10
8 10-6.3
9 total
ELONGNATION INDEX = C/A *100 =

LIMIT MAX = 20 %
Comments (if any):

Signature of Mahato Signature of UTCL

Date:- Date:-
FORM: QF-3

ART-I

Remarks

Signature of UTCL