You are on page 1of 16

Project:Rehabilitation and Up gradation of Repalle to Eeppurpalem S

from Km 129/927 to Km 195/000 of NH-214A (New NH-216) to two


with paved shoulder in the State of Andhra Pradesh under NHDP-IV o
Basis

Authority : MINISTRY OF ROAD TRANSPORT AND HIGHWAYS


Authority's Engineer : M/s WADIA TECHNO-ENGINEERING SERVICES LIMITED
EPC Contractor : M/s BSCPL Infrastructure Ltd.
RFI NO: REP/NH-216/STR/ Date:
Structure Chainage :
Type of Structure : RETAINING WALL
Segment Size : S2
Side :
Description: Retaining Wall Concrete

MEASUREMENT SHEET

WALL Top FRL : 3.550


300
Top Lif
300 FDL : -1.585

150 h4 Segment Type : " S2 "


Length : 10.000
h3 h1 = 0.300
h2 = 0.300
H h3 = 4.535
H= 5.135
h6
WALL h4 = 2.000
Ground Level 1st Lif
h5 = 2.000
150 150 h6 = 2.535
h5 h2 w1 = 2.650
RAFT h1 w2 = 0.300
FDL PCC 150 w3 = 0.300
w4 = 1.250
w4 w3 w2 w1
W= 4.500
W
S.No Description Unit No's Length Breadth Depth Qty

1 M15 PCC for Leveling Course Cum. 1 10.000 4.700 0.150 7.050

TOTAL : 7.050

2 M40 RCC for Raft Portion Cum. 1 10.000 4.500 0.300 13.500

Cum. 1 10.000 1.100 0.150 1.650


Cum. 1 10.000 2.500 0.150 3.750

Cum. 1 10.000 0.900 0.300 2.700

TOTAL : 21.600

3 M40 RCC for Wall-1st Lift Portion Cum. 1 10.000 0.300 2.535 7.605

Cum. 1 10.000 0.150 2.535 3.803

TOTAL : 11.408

4 M40 RCC for Wall-Top Lift Portion Cum. 1 10.000 0.300 2.000 6.000

Cum. 1 10.000 0.300 0.300 0.900

Cum. 1 10.000 0.075 0.300 0.225

TOTAL : 7.125

Total Quantity 47.183


tation and Up gradation of Repalle to Eeppurpalem Section
927 to Km 195/000 of NH-214A (New NH-216) to two lane
ulder in the State of Andhra Pradesh under NHDP-IV on EPC
Basis

OAD TRANSPORT AND HIGHWAYS


CHNO-ENGINEERING SERVICES LIMITED
astructure Ltd.
Date:

EMENT SHEET

m
m
Segment Type : " S2 "
m
m
m
m
m
m
m
m
m
m
m
m
m

Remarks

PCC

Cum.

(A)

(B)
(C)

(D)

Cum.

(A)

(B)

Cum.

(A)

(B)

(C)

Cum.

Cum.
Project:Rehabilitation and Up gradation of Repalle to Eeppurpalem S
from Km 129/927 to Km 195/000 of NH-214A (New NH-216) to two
with paved shoulder in the State of Andhra Pradesh under NHDP-IV o
Basis

Authority : MINISTRY OF ROAD TRANSPORT AND HIGHWAYS


Authority's Engineer : M/s WADIA TECHNO-ENGINEERING SERVICES LIMITED
EPC Contractor : M/s BSCPL Infrastructure Ltd.
RFI NO: REP/NH-216/STR/ Date:
Structure Chainage :
Type of Structure : RETAINING WALL
Segment Size : S2
Side :
Description: M40 RCC Concrete for Retaining Wall Raft Portion

MEASUREMENT SHEET

WALL Top FRL : 3.550


300
Top Lif
300 FDL : -1.585

150 h4 Segment Type : " S2 "


Length : 10.000
h3 h1 = 0.300
h2 = 0.300
H h3 = 4.535
H= 5.135
h6
WALL h4 = 2.000
Ground Level 1st Lif
h5 = 2.000
150 150 h6 = 2.535
h5 h2 w1 = 2.650
RAFT h1 w2 = 0.300
FDL PCC 150 w3 = 0.300
w4 = 1.250
w4 w3 w2 w1
W= 4.500
W
S.No Description Unit No's Length Breadth Depth Qty

1 M40 RCC for Raft Portion Cum. 1 10.000 4.500 0.300 13.500

Cum. 1 10.000 1.100 0.150 1.650

Cum. 1 10.000 2.500 0.150 3.750

Cum. 1 10.000 0.900 0.300 2.700


Total Quantity 21.600
tation and Up gradation of Repalle to Eeppurpalem Section
927 to Km 195/000 of NH-214A (New NH-216) to two lane
ulder in the State of Andhra Pradesh under NHDP-IV on EPC
Basis

OAD TRANSPORT AND HIGHWAYS


CHNO-ENGINEERING SERVICES LIMITED
astructure Ltd.
Date:

ll Raft Portion

EMENT SHEET

m
m
Segment Type : " S2 "
m
m
m
m
m
m
m
m
m
m
m
m
m

Remarks

(A)

(B)

(C)

(D)
Cum.
Project:Rehabilitation and Up gradation of Repalle to Eeppurpalem S
from Km 129/927 to Km 195/000 of NH-214A (New NH-216) to two
with paved shoulder in the State of Andhra Pradesh under NHDP-IV o
Basis

Authority : MINISTRY OF ROAD TRANSPORT AND HIGHWAYS


Authority's Engineer : M/s WADIA TECHNO-ENGINEERING SERVICES LIMITED
EPC Contractor : M/s BSCPL Infrastructure Ltd.
RFI NO: REP/NH-216/STR/ Date:
Structure Chainage :
Type of Structure : RETAINING WALL
Segment Size : S2
Side :
Description: M40 RCC Concrete for Retaining Wall 1st Lift Portion

MEASUREMENT SHEET

WALL Top FRL : 3.550


300
Top Lif
300 FDL : -1.585

150 h4 Segment Type : " S2 "


Length : 10.000
h3 h1 = 0.300
h2 = 0.300
H h3 = 4.535
H= 5.135
h6
WALL h4 = 2.000
Ground Level 1st Lif
h5 = 2.000
150 150 h6 = 2.535
h5 h2 w1 = 2.650
RAFT h1 w2 = 0.300
FDL PCC 150 w3 = 0.300
w4 = 1.250
w4 w3 w2 w1
W= 4.500
W
S.No Description Unit No's Length Breadth Depth Qty

1 M40 RCC for Wall-1st Lift Portion Cum. 1 10.000 0.300 2.535 7.605

Cum. 1 10.000 0.150 2.535 3.803


Total Quantity 11.408
tation and Up gradation of Repalle to Eeppurpalem Section
927 to Km 195/000 of NH-214A (New NH-216) to two lane
ulder in the State of Andhra Pradesh under NHDP-IV on EPC
Basis

OAD TRANSPORT AND HIGHWAYS


CHNO-ENGINEERING SERVICES LIMITED
astructure Ltd.
Date:

ll 1st Lift Portion

EMENT SHEET

m
m
Segment Type : " S2 "
m
m
m
m
m
m
m
m
m
m
m
m
m

Remarks

(A)

(B)
Cum.
Project:Rehabilitation and Up gradation of Repalle to Eeppurpalem S
from Km 129/927 to Km 195/000 of NH-214A (New NH-216) to two
with paved shoulder in the State of Andhra Pradesh under NHDP-IV o
Basis

Authority : MINISTRY OF ROAD TRANSPORT AND HIGHWAYS


Authority's Engineer : M/s WADIA TECHNO-ENGINEERING SERVICES LIMITED
EPC Contractor : M/s BSCPL Infrastructure Ltd.
RFI NO: REP/NH-216/STR/ Date:
Structure Chainage :
Type of Structure : RETAINING WALL
Segment Size : S2
Side :
Description: M40 RCC Concrete for Retaining Wall Top Lift Portion

MEASUREMENT SHEET

Top FRL : 3.550


WALL 300
Top Lif 300 FDL : -1.585

150 h4 Segment Type : " S2 "


Length : 10.000
h3 h1 = 0.300
h2 = 0.300
H h3 = 4.535
H= 5.135
h6
WALL h4 = 2.000
Ground Level 1st Lif
h5 = 2.000
150 150 h6 = 2.535
h5 h2 w1 = 2.650
RAFT h1 w2 = 0.300
FDL PCC 150 w3 = 0.300
w4 = 1.250
w4 w3 w2 w1
W= 4.500
W
S.No Description Unit No's Length Breadth Depth Qty

1 M40 RCC for Wall-Top Lift Portion Cum. 1 10.000 0.300 2.000 6.000

Cum. 1 10.000 0.300 0.300 0.900

Cum. 1 10.000 0.075 0.300 0.225


Total Quantity 7.125
tation and Up gradation of Repalle to Eeppurpalem Section
927 to Km 195/000 of NH-214A (New NH-216) to two lane
ulder in the State of Andhra Pradesh under NHDP-IV on EPC
Basis

OAD TRANSPORT AND HIGHWAYS


CHNO-ENGINEERING SERVICES LIMITED
astructure Ltd.
Date:

ll Top Lift Portion

EMENT SHEET

m
m
Segment Type : " S2 "
m
m
m
m
m
m
m
m
m