You are on page 1of 4

Name of the Work :- Repairs to BODHAN CAMP OFFICE, BODHAN(V), Bodhan (M), Nizamabad Dis

STABILITY CALCULATIONS OF PCC RETAINING WALL FOR LEVEL SURCHARGE


Only Red cells with Red Color text needs to be changed. Check Results

+ 99.000 600 + 99.000

Backfill Soils

W3 W1
W4
CC M15

Density of soil= 2.10 t/m3


Density of concrete= 2.40 t/m3 W2

150 150
+ 93.550 2400 600
A
+ 92.950 W5
B 3000
3300

STRESS ON CONCRETE: ( Taking moments about 'A' )

S.NO Description Load LA


in Tons in mts
1 W1 : 0.600 x 5.450 x 2.400 7.848 2.700
2 W2 : 0.500 x 2.400 x 5.450 x 2.400 15.696 1.600
3 W3 : 0.500 x 2.400 x 5.450 x 2.100 13.734 0.800
4 Pv : 0.0395 x 5.450 x 5.450 x 2.100 2.464 0.000
∑V = 39.742
5 Ph : 0.1583 x 5.450 x 5.450 x 2.100 9.874 2.180 (-)
∑M =

Lever arm = ∑M/∑V = 78.816 / 39.742 = 1.983 m


Eccentricity = 1.983 - 3.000 / 2 = 0.483 m
B/6 = 3.000 / 6 = 0.500 m > 0.483 m Hence No Tension
Max. Stress = ( 39.74 / 3.000 ) x { 1 + (6 x 0.483 ) / 3.000 }
= 26.049 T/m² ( Compression )
Min. Stress = ( 39.74 / 3.000 ) x { 1 - (6 x 0.483 ) / 3.000 }
= 0.445 T/m² ( Compression )
STRESS ON SOIL: ( Taking moments about 'B' )

S.NO Description Load LA


in Tons in mts
Item 1 to 3 same as on concrete
1 W1 : 7.848 2.850
2 W2 : 15.696 1.750
3 W3 : 13.734 0.950
4 W4 : 0.150 x 5.450 x 2.100 1.717 0.075
5 W5 : 3.300 x 0.450 x 2.400 3.564 1.650
6 Pv : 0.0395 x 5.900 x 5.900 x 2.100 2.887 0.000
∑V = 45.446
7 Ph : 0.1583 x 5.900 x 5.900 x 2.100 11.572 2.360
∑M =

Lever arm = ∑M/∑V = 96.201 / 45.446 = 2.117 m


Eccentricity = 2.117 - 3.300 / 2 = 0.467 m
B/6 = 3.300 / 6 = 0.550 m > 0.467 m Hence No Tension
Max. Stress = ( 45.446 / 3.300 ) x { 1 + (6 x 0.467 ) / 3.300 }
= 25.460 T/m² ( Compression )
Min. Stress = ( 45.446 / 3.300 ) x { 1 - (6 x 0.467 ) / 3.300 }
= 2.083 T/m² ( Compression )

Check for overturning = 68.891


= 2.523 > 2
27.310

Check for sliding = 22.723


= 1.964 > 1.5
11.572
n (M), Nizamabad Dist.

Results:
Max. Stress on Concrete : 26.049 T/m²
Min. Stress on Concrete : 0.445 T/m²
Hence No Tension

Max. Stress on Soils : 25.460 T/m²


Min. Stress on Soils : 2.083 T/m²
Hence No Tension

Check for overturning OK


Check for sliding OK

5450

450

Moment
in T.m
21.190
25.114
10.987
0.000
57.290
21.525
35.765

ence No Tension
Moment
in T.m

22.367
27.468
13.047
0.129
5.881
0.000
68.891
27.310
41.582

ence No Tension

OK

OK