MATERIALS
Compressive strength of concrete, fc ' =
Steel yield stress (deform) for longitudinal reinforcing fy =
Steel yield stress for shear reinforcing fy =
DIMENSION BEAM
Width b=
Height h=
Longitudinal Reinforcement Used D=
Shear Reinforcement Used P=
Concrete Cover ts =
MOMENT AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Positive moments due to factored loads plan, Mu+ =
Moment of negative plan due to factored loads, Mu - =
Shear force of the plan due to the load factor, Vu =
B. REINFORCEMENT CALCULATION
For : fc' ≤ 30 MPa, b1 =
For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
Factor form of concrete stress distribution, ® b1 =
Ratio of reinforcement in balance condition,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) =
Maximum momental resistance factor,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] =
Flexural strength reduction factor, f =
Distance of reinforcement to the outer side of the concrete, ds = ts + Æ + D/2 =
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 3 * D2 =
High effective beam, d = h - d' =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu+
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 4 * D2 =
High effective beam, d = h - ds =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu-
3. SHEAR REINFORCEMENT
Ultimate shear force plan, Vu =
The shear strength reduction factor, f=
The shear stress of the shear reinforcement, fy =
Concrete shear strength, Vc = (√ fc') / 6 * b * d * 10-3 =
Concrete shear resistance, f * Vc =
® Hanya perlu tul.geser min
Shear resistance, f * Vs = Vu - f * Vc =
Stirrup shear strength, Vs =
Used stirrup 2 P
Area used strirrup Av = ns * p / 4 * P2 =
s = Av * fy * d / ( Vs * 103 ) =
The maximum stirrup distance, smax = d / 2 =
Distance stirrups used, smax =
s=
Distance stirrups min. which should be used, s=
Used to stirrup, 2 P 10
) 200x500
COMB 2)
14.53 MPa
400 MPa
240 MPa
200 mm
500 mm
16 mm
10 mm
30 mm
42.874 kNm
37.834 kNm
43.282 kN
0.85
-
0.85
0.0157
3.8193
0.90
48.00 mm
47.637 kNm
48.00 mm
452.00 mm
1.1658
(OK)
0.00307
0.00238
0.01181
0.00307
277 mm2
1.38 2.00
16
402 mm2
452.00 mm
65.141 mm
67.465 kNm
60.719 kNm
SAFE (OK)
42.038 kNm
48.0 mm
452.00 mm
1.0288
(OK)
0.00269
0.00238
0.01181
0.00269
243 mm2
1.21 2.00
16
402 mm2
452.00 mm
65.141 mm
67.465 kNm
60.719 kNm
SAFE (OK)
43.282
0.85
240 MPa
57.422 kN
48.808 kN
Hanya perlu tul.geser min
- kN
43.282 kN
10
157.08 mm2
393.70 mm
226.00 mm
226.00 mm
226.00 mm
220 mm
200
ANALYSIS BEAM MANUAL (B2) 150x400
(Forces Maximum, from Output Analysis Case COMB 2)
MATERIALS
Compressive strength of concrete, fc ' =
Steel yield stress (deform) for longitudinal reinforcing fy =
Steel yield stress for shear reinforcing fy =
DIMENSION BEAM
Width b=
Height h=
Longitudinal Reinforcement Used D=
Shear Reinforcement Used P=
Concrete Cover ts =
MOMENT AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Positive moments due to factored loads plan, Mu+ =
Moment of negative plan due to factored loads, Mu - =
Shear force of the plan due to the load factor, Vu =
B. REINFORCEMENT CALCULATION
For : fc' ≤ 30 MPa, b1 =
For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
Factor form of concrete stress distribution, ® b1 =
Ratio of reinforcement in balance condition,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) =
Maximum momental resistance factor,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] =
Flexural strength reduction factor, f =
Distance of reinforcement to the outer side of the concrete, ds = ts + Æ + D/2 =
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 3 D
Area used reinforcement, As = n * p / 3 * D2 =
High effective beam, d = h - d' =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu+
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 3 D
Area used reinforcement, As = n * p / 4 * D2 =
High effective beam, d = h - ds =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu-
3. SHEAR REINFORCEMENT
Ultimate shear force plan, Vu =
The shear strength reduction factor, f=
The shear stress of the shear reinforcement, fy =
Concrete shear strength, Vc = (√ fc') / 6 * b * d * 10-3 =
Concrete shear resistance, f * Vc =
® Perlu tulangan geser
Shear resistance, f * Vs = Vu - f * Vc =
Stirrup shear strength, Vs =
Used stirrup 2 P
Area used strirrup Av = ns * p / 4 * P2 =
s = Av * fy * d / ( Vs * 103 ) =
The maximum stirrup distance, smax = d / 2 =
Distance stirrups used, smax =
s=
Distance stirrups min. which should be used, s=
Used to stirrup, 2 P 8
) 150x400
COMB 2)
14.53 MPa
400 MPa
240 MPa
150 mm
400 mm
13 mm
8 mm
30 mm
42.874 kNm
37.834 kNm
43.282 kN
0.85
-
0.85
0.0157
3.8193
0.90
44.50 mm
47.637 kNm
44.50 mm
355.50 mm
2.5129
(OK)
0.00710
0.00238
0.01181
0.00710
379 mm2
2.85 3.00
13
398 mm2
355.50 mm
86.007 mm
49.774 kNm
44.797 kNm
SAFE (OK)
42.038 kNm
44.5 mm
355.50 mm
2.2175
(OK)
0.00616
0.00238
0.01181
0.00616
328 mm2
2.48 3.00
13
398 mm2
355.50 mm
86.007 mm
49.774 kNm
44.797 kNm
SAFE (OK)
43.282
0.85
240 MPa
33.872 kN
28.791 kN
erlu tulangan geser
14.491 kN
17.048 kN
8
100.53 mm2
503.12 mm
177.75 mm
177.75 mm
177.75 mm
170 mm
150
ANALYSIS BEAM MANUAL (B1 200x500)
(Forces Maximum, from Output Analysis Case Beam B1)
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 200 mm
Height h= 500 mm
Longitudinal Reinforcement Used D= 16 mm
Shear Reinforcement Used P= 10 mm
Concrete Cover ts = 30 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = 64.721 kN
Torsi force of the plan due to the load factor, Tu = 16.445 kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ø10 - 150
2D16
500 2D16
2D16
3D16
200
ANALYSIS BEAM MANUAL (B1 200x500)
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 150 mm
Height h= 500 mm
Longitudinal Reinforcement Used D= 16 mm
Shear Reinforcement Used P= 8 mm
Concrete Cover ts = 30 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = kN
Torsi force of the plan due to the load factor, Tu = kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ukuran agregat maksimum, SNI 2847 2002 pasal 5.3.2, 3/4*x = 12.38 mm
1.24 cm
Bisa di Pakai Agregat, 1 : 2 (cm) dengan panjang ± 2 cm dan lebar ± 1 cm
ANALYSIS BEAM MANUAL (B2 150x500)
(Forces Maximum, from Output Analysis Case Beam B2), Alternatif 2
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 150 mm
Height h= 500 mm
Longitudinal Reinforcement Used D= 13 mm
Shear Reinforcement Used P= 8 mm
Concrete Cover ts = 25 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = 16.953 kN
Torsi force of the plan due to the load factor, Tu = 6.790 kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ukuran agregat maksimum, SNI 2847 2002 pasal 5.3.2, 3/4*x = 21.75 mm
2.18 cm
Bisa di Pakai Agregat, 1 : 2 (cm) dengan panjang ± 2 cm dan lebar ± 1 cm
Lapangan Tumpuan
ANALYSIS BEAM MANUAL (B1' 200x500)
(Forces Maximum, from Output Analysis Case Beam B2)
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 200 mm
Height h= 500 mm
Longitudinal Reinforcement Used D= 16 mm
Shear Reinforcement Used P= 10 mm
Concrete Cover ts = 30 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = 110.172 kN
Torsi force of the plan due to the load factor, Tu = 30.752 kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ø10 - 150
3D16
500 2D19
2D19
3D19
200
ANALYSIS BEAM MANUAL (B2 150x500)
(Forces Maximum, from Output Analysis Case Beam B2)
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 150 mm
Height h= 500 mm
Longitudinal Reinforcement Used D= 13 mm
Shear Reinforcement Used P= 8 mm
Concrete Cover ts = 30 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = 98.634 kN
Torsi force of the plan due to the load factor, Tu = 6.765 kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ø8 - 150
2D13
500
2D16
3D16
150
ANALYSIS BEAM MANUAL (B2 150x500)
(Forces Maximum, from Output Analysis Case Beam B2)
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 150 mm
Height h= 500 mm
Longitudinal Reinforcement Used D= 13 mm
Shear Reinforcement Used P= 8 mm
Concrete Cover ts = 20 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = 98.634 kN
Torsi force of the plan due to the load factor, Tu = 6.765 kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ukuran agregat maksimum, SNI 2847 2002 pasal 5.3.2, 3/4*x = 20.63 mm
2.06 cm
Bisa di Pakai Agregat, 1 : 2 (cm) dengan panjang ± 2 cm dan lebar ± 1 cm
Lapangan Tumpuan
20 27,50
2D13 2D13
77
77
2D16
2D16
Ø8-150 Ø8-100
500
500
2D13
25
2D13 2D13
27,50 20
150
150
ANALYSIS BEAM MANUAL (BA 150x250)
(Forces Maximum, from Output Analysis Case Beam BA)
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 150 mm
Height h= 250 mm
Longitudinal Reinforcement Used D= 13 mm
Shear Reinforcement Used P= 8 mm
Concrete Cover ts = 30 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = 2.577 kN
Torsi force of the plan due to the load factor, Tu = 1.562 kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ø8 - 100
2D13
250
2D13
3D13
150
ANALYSIS BEAM MANUAL (BA 150x250)
(Forces Maximum, from Output Analysis Case Beam BA)
A. DATA BEAM
MATERIALS
Compressive strength of concrete, fc' = 14.53 MPa
Steel yield stress (deform) for longitudinal reinforcing fy = 400 MPa
Steel yield stress for shear reinforcing fy = 240 MPa
DIMENSION BEAM
Width b= 150 mm
Height h= 250 mm
Longitudinal Reinforcement Used D= 13 mm
Shear Reinforcement Used P= 8 mm
Concrete Cover ts = 20 mm
TORSI AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Shear force of the plan due to the load factor, Vu = 2.577 kN
Torsi force of the plan due to the load factor, Tu = 1.562 kNm
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (AL) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
Ukuran agregat maksimum, SNI 2847 2002 pasal 5.3.2, 3/4*x = 20.63 mm
2.06 cm
Bisa di Pakai Agregat, 1 : 2 (cm) dengan panjang ± 2 cm dan lebar ± 1 cm
Lapangan Tumpuan
20 27,50
35
2D13
250
250
2D13
3D13
35
2D13
27,50 150
150
ANALYSIS BEAM (B2) 150x400
MATERIALS
Compressive strength of concrete, fc ' =
Steel yield stress (deform) for longitudinal reinforcing fy =
Steel yield stress for shear reinforcing fy =
DIMENSION BEAM
Width b=
Height h=
Longitudinal Reinforcement Used D=
Shear Reinforcement Used P=
Concrete Cover ts =
MOMENT AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Positive moments due to factored loads plan, Mu+ =
Moment of negative plan due to factored loads, Mu - =
Shear force of the plan due to the load factor, Vu =
B. REINFORCEMENT CALCULATION
For : fc' ≤ 30 MPa, b1 =
For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
Factor form of concrete stress distribution, ® b1 =
Ratio of reinforcement in balance condition,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) =
Maximum momental resistance factor,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] =
Flexural strength reduction factor, f =
Distance of reinforcement to the outer side of the concrete, ds = ts + Æ + D/2 =
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 3 * D2 =
High effective beam, d = h - d' =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu+
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 4 * D2 =
High effective beam, d = h - ds =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu-
3. SHEAR REINFORCEMENT
Ultimate shear force plan, Vu =
The shear strength reduction factor, f=
The shear stress of the shear reinforcement, fy =
Concrete shear strength, Vc = (√ fc') / 6 * b * d * 10-3 =
Concrete shear resistance, f * Vc =
® Hanya perlu tul.geser min
Shear resistance, f * Vs = Vu - f * Vc =
Stirrup shear strength, Vs =
Used stirrup 2 P
Area used strirrup Av = ns * p / 4 * P2 =
s = Av * fy * d / ( Vs * 103 ) =
The maximum stirrup distance, smax = d / 2 =
Distance stirrups used, smax =
s=
Distance stirrups min. which should be used, s=
Used to stirrup, 2 P 10
150 mm
400 mm
16 mm
10 mm
40 mm
5.792 kNm
9.173 kNm
15.870 kN
0.85
-
0.85
0.0157
3.8193
0.90
58.00 mm
6.436 kNm
58.00 mm
342.00 mm
0.3668
(OK)
0.00093
0.00238
0.01181
0.00238
122 mm2
0.61 2.00
16
402 mm2
342.00 mm
86.855 mm
48.025 kNm
43.223 kNm
SAFE (OK)
10.192 kNm
58.0 mm
342.00 mm
0.5809
(OK)
0.00149
0.00238
0.01181
0.00238
122 mm2
0.61 2.00
16
402 mm2
342.00 mm
86.855 mm
48.025 kNm
43.223 kNm
SAFE (OK)
15.870
0.85
240 MPa
32.585 kN
27.698 kN
Hanya perlu tul.geser min
- kN
15.870 kN
10
157.08 mm2
812.42 mm
171.00 mm
171.00 mm
171.00 mm
170 mm
170
ANALYSIS BEAM (BA) 150x250
MATERIALS
Compressive strength of concrete, fc ' =
Steel yield stress (deform) for longitudinal reinforcing fy =
Steel yield stress for shear reinforcing fy =
DIMENSION BEAM
Width b=
Height h=
Longitudinal Reinforcement Used D=
Shear Reinforcement Used P=
Concrete Cover ts =
MOMENT AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Positive moments due to factored loads plan, Mu+ =
Moment of negative plan due to factored loads, Mu - =
Shear force of the plan due to the load factor, Vu =
B. REINFORCEMENT CALCULATION
For : fc' ≤ 30 MPa, b1 =
For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
Factor form of concrete stress distribution, ® b1 =
Ratio of reinforcement in balance condition,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) =
Maximum momental resistance factor,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] =
Flexural strength reduction factor, f =
Distance of reinforcement to the outer side of the concrete, ds = ts + Æ + D/2 =
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 3 * D2 =
High effective beam, d = h - d' =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu+
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 4 * D2 =
High effective beam, d = h - ds =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu-
3. SHEAR REINFORCEMENT
Ultimate shear force plan, Vu =
The shear strength reduction factor, f=
The shear stress of the shear reinforcement, fy =
Concrete shear strength, Vc = (√ fc') / 6 * b * d * 10-3 =
Concrete shear resistance, f * Vc =
® Perlu tulangan geser
Shear resistance, f * Vs = Vu - f * Vc =
Stirrup shear strength, Vs =
Used stirrup 2 P
Area used strirrup Av = ns * p / 4 * P2 =
s = Av * fy * d / ( Vs * 103 ) =
The maximum stirrup distance, smax = d / 2 =
Distance stirrups used, smax =
s=
Distance stirrups min. which should be used, s=
Used to stirrup, 2 P 10
150 mm
250 mm
13 mm
10 mm
40 mm
0.582 kNm
9.863 kNm
15.750 kN
0.85
-
0.85
0.0157
3.8193
0.90
56.50 mm
0.647 kNm
56.50 mm
193.50 mm
0.1151
(OK)
0.00029
0.00238
0.01181
0.00238
69 mm2
0.52 2.00
13
265 mm2
193.50 mm
57.338 mm
17.503 kNm
15.752 kNm
SAFE (OK)
10.959 kNm
56.5 mm
193.50 mm
1.9513
(OK)
0.00534
0.00238
0.01181
0.00534
155 mm2
1.17 2.00
13
265 mm2
193.50 mm
57.338 mm
17.503 kNm
15.752 kNm
SAFE (OK)
15.750
0.85
240 MPa
18.437 kN
15.671 kN
erlu tulangan geser
0.079 kN
0.093 kN
10
157.08 mm2
78533.45 mm
96.75 mm
96.75 mm
96.75 mm
90 mm
90
ANALYSIS BEAM (RB) 150x300
MATERIALS
Compressive strength of concrete, fc ' =
Steel yield stress (deform) for longitudinal reinforcing fy =
Steel yield stress for shear reinforcing fy =
DIMENSION BEAM
Width b=
Height h=
Longitudinal Reinforcement Used D=
Shear Reinforcement Used P=
Concrete Cover ts =
MOMENT AND SHEAR FORCE FROM OUTPUT ANALISIS SAP2000
Positive moments due to factored loads plan, Mu+ =
Moment of negative plan due to factored loads, Mu - =
Shear force of the plan due to the load factor, Vu =
B. REINFORCEMENT CALCULATION
For : fc' ≤ 30 MPa, b1 =
For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
Factor form of concrete stress distribution, ® b1 =
Ratio of reinforcement in balance condition,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) =
Maximum momental resistance factor,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] =
Flexural strength reduction factor, f =
Distance of reinforcement to the outer side of the concrete, ds = ts + Æ + D/2 =
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 3 * D2 =
High effective beam, d = h - d' =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu+
Rn < Rmax ®
The ratio of reinforcement is required:
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * fc’ ) ] =
Minimum rebars ratio, rmin = Ö fc' / ( 4 * fy ) =
Minimum rebars ratio, rmax = 0.75*ρb =
The reinforcement ratios used, ® r=
The required reinforcement area, As = r * b * d =
The required number of reinforcements, n = As / ( p / 4 * D2 ) =
Used reinforcement, 2 D
Area used reinforcement, As = n * p / 4 * D2 =
High effective beam, d = h - ds =
a = As * fy / ( 0.85 * fc' * b ) =
Requirement : f * Mn ≥ Mu-
3. SHEAR REINFORCEMENT
Ultimate shear force plan, Vu =
The shear strength reduction factor, f=
The shear stress of the shear reinforcement, fy =
Concrete shear strength, Vc = (√ fc') / 6 * b * d * 10-3 =
Concrete shear resistance, f * Vc =
® Hanya perlu tul.geser min
Shear resistance, f * Vs = Vu - f * Vc =
Stirrup shear strength, Vs =
Used stirrup 2 P
Area used strirrup Av = ns * p / 4 * P2 =
s = Av * fy * d / ( Vs * 103 ) =
The maximum stirrup distance, smax = d / 2 =
Distance stirrups used, smax =
s=
Distance stirrups min. which should be used, s=
Used to stirrup, 2 P 10
150 mm
300 mm
13 mm
10 mm
40 mm
4.482 kNm
7.149 kNm
10.006 kN
0.85
-
0.85
0.0157
3.8193
0.90
56.50 mm
4.980 kNm
56.50 mm
243.50 mm
0.5599
(OK)
0.00143
0.00238
0.01181
0.00238
87 mm2
0.66 2.00
13
265 mm2
243.50 mm
57.338 mm
22.812 kNm
20.531 kNm
SAFE (OK)
7.943 kNm
56.5 mm
243.50 mm
0.8931
(OK)
0.00232
0.00238
0.01181
0.00238
87 mm2
0.66 2.00
13
265 mm2
243.50 mm
57.338 mm
22.812 kNm
20.531 kNm
SAFE (OK)
10.006
0.85
240 MPa
23.200 kN
19.720 kN
Hanya perlu tul.geser min
- kN
10.006 kN
10
157.08 mm2
917.42 mm
121.75 mm
121.75 mm
121.75 mm
120 mm
120
PERHITUNGAN MANUAL BEAM (RB 150x3
A. DATA BEAM
BAHAN STRUKTUR
Kuat tekan beton,
Tegangan leleh baja (deform) untuk tulangan lentur,
Tegangan leleh baja (polos) untuk tulangan geser,
DIMENSI BEAM
Lebar
Tinggi
Diameter tulangan (deform) yang digunakan,
Diameter sengkang (polos) yang digunakan,
Tebal bersih selimut beton,
MOMEN DAN GESER RENCANA OUTPUT ANALISIS SAP2000
Momen rencana positif akibat beban terfaktor,
Momen rencana negatif akibat beban terfaktor,
Gaya geser rencana akibat beban terfaktor,
1. TULANGAN LAPANGAN
Syarat : As pakai ≥
265 >
Syarat : f * Mn ≥
22.155 >
2. TULANGAN TUMPUAN
Momen positif nominal rencana,
Diperkirakan jarak pusat tulangan lentur ke sisi beton, ds = ts + Ø + D/2 =
Tinggi efektif balok,
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) =
Rn <
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * R
Syarat : As pakai ≥
265 >
Tinggi efektif balok,
a = As * fy / ( 0.85 * fc' * b ) =
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 =
Syarat : f * Mn ≥
22.155 >
Digunakan sengkang,
Syarat : Av/s pakai ≥
0.670 >
1.203 <
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
0.737 <
The Second Asumsi, the flens slab monolit with beam,
The thicness of slab
The thicness of flens slab
Pcp = 2*(b+h)+(2*1(hf+h)) =
Caclculate the torsi are calculate or not , Tu > φ*√fc'/12*(Acp^2/Pcp) =
1.203 >
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
0.971 <
At/s = Tn/Ao*fy*cot.
AL = At/s*Ph*(fyv/fyl)*cot^2φ
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (A L) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
b= 150 mm
h= 300 mm
D= 13 mm
P= 8 mm
ts = 25 mm
b1 = 0.85
0.85 - 0.05 * ( fc' - 30) / 7 = -
b1 =
® 0.85
0 / ( 600 + fy ) = 0.0157
As perlu
93 ® AMAN (OK)
d = h - d' = 260.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 57.338 mm
= As * fy * ( d - a / 2 ) * 10-6 = 24.617 kNm
f * Mn = 22.155 kNm
Mu+
1.151 ® AMAN (OK)
As perlu
93 ® AMAN (OK)
d = h - ds = 260.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 57.338 mm
= As * fy * ( d - a / 2 ) * 10-6 = 24.617 kNm
f * Mn = 22.155 kNm
Mu-
2.303 ® AMAN (OK)
Vu = 7.051
f= 0.85 kN
fy = 240
Vc = (√ fc') / 6 * b * d * 10 = -3
24.820 kN
f * Vc = 21.097 kN
® Tetap perlu tulangan geser
f * Vs = Vu - f * Vc = -
Vs = 7.051 kN
2 Ø 8 kN
Av = b*S /3*fy = 208.333 mm2
Av/s perlu = 0.208 mm2/mm
Av Ø10 = 2 * 1/4 * Π * Ø^2 = 100 mm2
d/2 = 130 mm
s = Av * fy * d / ( Vs ) = 890.94 mm
s= 130 mm
® s= 150 mm
2 * 1/4 * Π * Ø^2 * (1000/200) = 670 mm2
Av/s pakai = 0.670 mm2/mm
Ø 8 150 mm
Av/s perlu
Vc = (√ fc') / 6 * b * d = 24820.230 N
(Vu/bw*d)^2 = 0.033 N
(Tu*Ph/1,7*Aoh^2)^2) = 0.510 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 0.543 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 0.737 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
Vc = (√ fc') / 6 * b * d = 24820.230 N
(Vu/bw*d)^2 = 0.033 N
(Tu*Ph/1,7*Aoh^2)^2) = 0.909 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 0.942 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 0.971 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
AL = 124.89 mm2
agian Atas, 1/4 * AL= 31.22 mm2
ns = 2.00 bh
Ø= 8 mm
D= 13 mm
Sb = 25 mm
ds = Sb + Ø + D (13) /2 40 mm
d = h - ds 261 mm
(b - 2*Sb - 2*Ø - 3*D) / 2 = 29.00 mm
xmin = 25.00 mm
25.00 ® (OK)
y = 25.00 mm
1/6*d = 43.00 mm
3/4*x = 21.75 mm
2.18 cm
PERHITUNGAN MANUAL BEAM (RB 150x3
A. DATA BEAM
BAHAN STRUKTUR
Kuat tekan beton,
Tegangan leleh baja (deform) untuk tulangan lentur,
Tegangan leleh baja (polos) untuk tulangan geser,
DIMENSI BEAM
Lebar
Tinggi
Diameter tulangan (deform) yang digunakan,
Diameter sengkang (polos) yang digunakan,
Tebal bersih selimut beton,
MOMEN DAN GESER RENCANA OUTPUT ANALISIS SAP2000
Momen rencana positif akibat beban terfaktor,
Momen rencana negatif akibat beban terfaktor,
Gaya geser rencana akibat beban terfaktor,
1. TULANGAN LAPANGAN
Syarat : As pakai ≥
265 >
Syarat : f * Mn ≥
22.155 >
2. TULANGAN TUMPUAN
Momen positif nominal rencana,
Diperkirakan jarak pusat tulangan lentur ke sisi beton, ds = ts + Ø + D/2 =
Tinggi efektif balok,
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) =
Rn <
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * R
Syarat : As pakai ≥
265 >
Tinggi efektif balok,
a = As * fy / ( 0.85 * fc' * b ) =
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 =
Syarat : f * Mn ≥
22.155 >
Digunakan sengkang,
Syarat : Av/s pakai ≥
0.670 >
1.267 <
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
1.434 <
The Second Asumsi, the flens slab monolit with beam,
The thicness of slab
The thicness of flens slab
Pcp = 2*(b+h)+(2*2(hf+h)) =
Caclculate the torsi are calculate or not , Tu > φ*√fc'/12*(Acp^2/Pcp) =
1.267 <
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
1.064 <
At/s = Tn/Ao*fy*cot.
AL = At/s*Ph*(fyv/fyl)*cot^2φ
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (A L) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
b= 150 mm
h= 300 mm
D= 13 mm
P= 8 mm
ts = 25 mm
b1 = 0.85
0.85 - 0.05 * ( fc' - 30) / 7 = -
b1 =
® 0.85
0 / ( 600 + fy ) = 0.0157
As perlu
93 ® AMAN (OK)
d = h - d' = 260.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 57.338 mm
= As * fy * ( d - a / 2 ) * 10-6 = 24.617 kNm
f * Mn = 22.155 kNm
Mu+
3.166 ® AMAN (OK)
As perlu
93 ® AMAN (OK)
d = h - ds = 260.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 57.338 mm
= As * fy * ( d - a / 2 ) * 10-6 = 24.617 kNm
f * Mn = 22.155 kNm
Mu-
0.000 ® AMAN (OK)
Vu = 13.674
f= 0.85 kN
fy = 240
Vc = (√ fc') / 6 * b * d * 10 = -3
24.820 kN
f * Vc = 21.097 kN
® Tetap perlu tulangan geser
f * Vs = Vu - f * Vc = -
Vs = 13.674 kN
2 Ø 8 kN
Av = b*S /3*fy = 208.333 mm2
Av/s perlu = 0.208 mm2/mm
Av Ø10 = 2 * 1/4 * Π * Ø^2 = 100 mm2
d/2 = 130 mm
s = Av * fy * d / ( Vs ) = 459.41 mm
s= 130 mm
® s= 150 mm
2 * 1/4 * Π * Ø^2 * (1000/200) = 670 mm2
Av/s pakai = 0.670 mm2/mm
Ø 8 150 mm
Av/s perlu
Vc = (√ fc') / 6 * b * d = 24820.230 N
(Vu/bw*d)^2 = 0.122 N
(Tu*Ph/1,7*Aoh^2)^2) = 1.933 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 2.055 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 1.434 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
Vc = (√ fc') / 6 * b * d = 24820.230 N
(Vu/bw*d)^2 = 0.122 N
(Tu*Ph/1,7*Aoh^2)^2) = 1.009 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 1.131 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 1.064 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
AL = 131.54 mm2
agian Atas, 1/4 * AL= 32.88 mm2
ns = 2.00 bh
Ø= 8 mm
D= 13 mm
Sb = 25 mm
ds = Sb + Ø + D (13) /2 40 mm
d = h - ds 261 mm
(b - 2*Sb - 2*Ø - 3*D) / 2 = 29.00 mm
xmin = 25.00 mm
25.00 ® (OK)
y = 25.00 mm
1/6*d = 43.00 mm
3/4*x = 21.75 mm
2.18 cm
PERHITUNGAN MANUAL BEAM (BA 150x3
A. DATA BEAM
BAHAN STRUKTUR
Kuat tekan beton,
Tegangan leleh baja (deform) untuk tulangan lentur,
Tegangan leleh baja (polos) untuk tulangan geser,
DIMENSI BEAM
Lebar
Tinggi
Diameter tulangan (deform) yang digunakan,
Diameter sengkang (polos) yang digunakan,
Tebal bersih selimut beton,
MOMEN DAN GESER RENCANA OUTPUT ANALISIS SAP2000
Momen rencana positif akibat beban terfaktor,
Momen rencana negatif akibat beban terfaktor,
Gaya geser rencana akibat beban terfaktor,
1. TULANGAN LAPANGAN
Syarat : As pakai ≥
265 >
Syarat : f * Mn ≥
17.377 >
2. TULANGAN TUMPUAN
Momen positif nominal rencana,
Diperkirakan jarak pusat tulangan lentur ke sisi beton, ds = ts + Ø + D/2 =
Tinggi efektif balok,
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) =
Rn <
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * R
Syarat : As pakai ≥
265 >
Tinggi efektif balok,
a = As * fy / ( 0.85 * fc' * b ) =
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 =
Syarat : f * Mn ≥
17.377 >
Digunakan sengkang,
Syarat : Av/s pakai ≥
0.670 >
1.081 <
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
1.609 <
The Second Asumsi, the flens slab monolit with beam,
The thicness of slab
The thicness of flens slab
Pcp = 2*(b+h)+(2*2(hf+h)) =
Caclculate the torsi are calculate or not , Tu > φ*√fc'/12*(Acp^2/Pcp) =
1.081 <
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
1.166 <
At/s = Tn/Ao*fy*cot.
AL = At/s*Ph*(fyv/fyl)*cot^2φ
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (A L) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
b= 150 mm
h= 250 mm
D= 13 mm
P= 8 mm
ts = 25 mm
b1 = 0.85
0.85 - 0.05 * ( fc' - 30) / 7 = -
b1 =
® 0.85
0 / ( 600 + fy ) = 0.0157
As perlu
75 ® AMAN (OK)
d = h - d' = 210.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 57.338 mm
= As * fy * ( d - a / 2 ) * 10-6 = 19.308 kNm
f * Mn = 17.377 kNm
Mu+
0.504 ® AMAN (OK)
As perlu
75 ® AMAN (OK)
d = h - ds = 210.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 57.338 mm
= As * fy * ( d - a / 2 ) * 10-6 = 19.308 kNm
f * Mn = 17.377 kNm
Mu-
1.008 ® AMAN (OK)
Vu = 4.517
f= 0.85 kN
fy = 240
Vc = (√ fc') / 6 * b * d * 10 = -3
20.056 kN
f * Vc = 17.048 kN
® Tetap perlu tulangan geser
f * Vs = Vu - f * Vc = -
Vs = 4.517 kN
2 Ø 8 kN
Av = b*S /3*fy = 208.333 mm2
Av/s perlu = 0.208 mm2/mm
Av Ø10 = 2 * 1/4 * Π * Ø^2 = 100 mm2
d/2 = 105 mm
s = Av * fy * d / ( Vs ) = 1123.81 mm
s= 105 mm
® s= 150 mm
2 * 1/4 * Π * Ø^2 * (1000/200) = 670 mm2
Av/s pakai = 0.670 mm2/mm
Ø 8 150 mm
Av/s perlu
Vc = (√ fc') / 6 * b * d = 20056.271 N
(Vu/bw*d)^2 = 0.020 N
(Tu*Ph/1,7*Aoh^2)^2) = 2.567 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 2.587 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 1.609 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
Vc = (√ fc') / 6 * b * d = 20056.271 N
(Vu/bw*d)^2 = 0.020 N
(Tu*Ph/1,7*Aoh^2)^2) = 1.340 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 1.360 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 1.166 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
AL = 120.28 mm2
agian Atas, 1/4 * AL= 30.07 mm2
ns = 2.00 bh
Ø= 8 mm
D= 13 mm
Sb = 25 mm
ds = Sb + Ø + D (13) /2 40 mm
d = h - ds 211 mm
(b - 2*Sb - 2*Ø - 3*D) / 2 = 29.00 mm
xmin = 25.00 mm
25.00 ® (OK)
y = 25.00 mm
1/6*d = 35.00 mm
3/4*x = 21.75 mm
2.18 cm
PERHITUNGAN MANUAL BEAM (B2 150x50
A. DATA BEAM
BAHAN STRUKTUR
Kuat tekan beton,
Tegangan leleh baja (deform) untuk tulangan lentur,
Tegangan leleh baja (polos) untuk tulangan geser,
DIMENSI BEAM
Lebar
Tinggi
Diameter tulangan (deform) yang digunakan,
Diameter sengkang (polos) yang digunakan,
Tebal bersih selimut beton,
MOMEN DAN GESER RENCANA OUTPUT ANALISIS SAP2000
Momen rencana positif akibat beban terfaktor,
Momen rencana negatif akibat beban terfaktor,
Gaya geser rencana akibat beban terfaktor,
1. TULANGAN LAPANGAN
Rn < Rmax
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * f
Syarat : f * Mn ≥ Mu+
41.269 > 1.288
2. TULANGAN TUMPUAN
Momen positif nominal rencana, Mn = Mu-/ f =
Diperkirakan jarak pusat tulangan lentur ke sisi beton, ds = ts + Ø + D/2 =
Tinggi efektif balok, d = h - ds =
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) =
Rn < Rmax
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * Rn / ( 0.85 * f
Syarat : f * Mn ≥ Mu-
41.269 > 2.577
Digunakan sengkang, Ø
Syarat : Av/s pakai ≥ Av/s perlu
X1 = b - (ts+P/2) =
Y1 = h - (ts+P/2) =
Aoh = X1*Y1 =
Ao = 0,85*Aoh =
Concrete Cover to Longitudinal Centre ds = ts + P + D/2 =
High Effective of Beam d = h - ds =
Ph = 2 * (X1 + Y1) =
Check The Dimenssion of The Beam Enough of Not ,
Vc = (√ fc') / 6 * b * d =
(Vu/bw*d)^2 =
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
(Vc/b*d+2*√fc'/3) =
φ(Vc/b*d+2*√fc'/3) =
X1 = b - 2*(ts+P/2) =
Y1 = h - 2*(ts+P/2) =
Aoh = X1*Y1 =
Ao = 0,85*Aoh =
Concrete Cover to Longitudinal Centre ds = ts + P + D/2 =
High Effective of Beam d = h - ds =
Ph = 2 * (X1 + Y1) =
Check The Dimenssion of The Beam Enough of Not ,
Vc = (√ fc') / 6 * b * d =
(Vu/bw*d)^2 =
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
(Vc/b*d+2*√fc'/3) =
φ(Vc/b*d+2*√fc'/3) =
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (A L) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
b= 150 mm
h= 500 mm
D= 13 mm
P= 8 mm
ts = 25 mm
b1 = 0.85
5 * ( fc' - 30) / 7 = -
b1 = 0.85
fy ) = 0.0157
= Mu + / f = 1.43 kNm
= ts + Ø + D/2 = 39.50 mm
d = h - ds = 460.50 mm
* 10 / ( b * d2 ) =
6
0.04
® AMAN (OK)
® AMAN (OK)
d = h - d' = 460.50 mm
( 0.85 * fc' * b ) = 57.338 mm
d - a / 2 ) * 10-6 = 45.854 kNm
f * Mn = 41.269 kNm
® AMAN (OK)
n
= Mu-/ f = 2.863 kNm
= ts + Ø + D/2 = 39.50 mm
d = h - ds = 460.50 mm
* 106 / ( b * d2 ) = 0.09
® (OK)
® AMAN (OK)
d = h - ds = 460.50 mm
( 0.85 * fc' * b ) = 57.338 mm
d - a / 2 ) * 10-6 = 45.854 kNm
f * Mn = 41.269 kNm
® AMAN (OK)
Vu = 3.785
f= 0.85 kN
fy = 240
6 * b * d * 10 = -3
43.876 kN
f * Vc = 37.295 kN
Tetap perlu tulangan geser
Vs = Vu - f * Vc = -
Vs = 3.785 kN
Ø 8 kN
Av = b*S /3*fy = 208.333 mm2
Av/s perlu = 0.208 mm2/mm
= 2 * 1/4 * Π * Ø^2 = 100 mm2
d/2 = 230 mm
Av * fy * d / ( Vs ) = 2933.96 mm
s= 230 mm
s= 150 mm
Ø^2 * (1000/200) = 670 mm2
Av/s pakai = 0.670 mm2/mm
8 150 mm
® AMAN (OK)
= (√ fc') / 6 * b * d = 43876.069 N
(Vu/bw*d)^2 = 0.003 N
Ph/1,7*Aoh^2)^2) = 0.844 N
Ph/1,7*Aoh^2)^2) = 0.847 N
7*Aoh^2)^2)]^0,5 = 0.921 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
= (√ fc') / 6 * b * d = 43876.069 N
(Vu/bw*d)^2 = 0.003 N
Ph/1,7*Aoh^2)^2) = 1.384 N
Ph/1,7*Aoh^2)^2) = 1.387 N
7*Aoh^2)^2)]^0,5 = 1.178 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
AL = 281.36 mm2
1/4 * AL= 70.34 mm2
ns = 2.00 bh
Ø= 8 mm
D= 13 mm
Sb = 25 mm
b + Ø + D (13) /2 40 mm
d = h - ds 461 mm
2*Ø - 3*D) / 2 = 29.00 mm
xmin = 25.00 mm
® (OK)
y = 25.00 mm
1/6*d = 76.00 mm
3/4*x = 21.75 mm
2.18 cm
PERHITUNGAN MANUAL BEAM (B1 200x5
A. DATA BEAM
BAHAN STRUKTUR
Kuat tekan beton,
Tegangan leleh baja (deform) untuk tulangan lentur,
Tegangan leleh baja (polos) untuk tulangan geser,
DIMENSI BEAM
Lebar
Tinggi
Diameter tulangan (deform) yang digunakan,
Diameter sengkang (polos) yang digunakan,
Tebal bersih selimut beton,
MOMEN DAN GESER RENCANA OUTPUT ANALISIS SAP2000
Momen rencana positif akibat beban terfaktor,
Momen rencana negatif akibat beban terfaktor,
Gaya geser rencana akibat beban terfaktor,
1. TULANGAN LAPANGAN
Syarat : As pakai ≥
402 >
Syarat : f * Mn ≥
61.732 >
2. TULANGAN TUMPUAN
Momen positif nominal rencana,
Diperkirakan jarak pusat tulangan lentur ke sisi beton, ds = ts + Ø + D/2 =
Tinggi efektif balok,
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) =
Rn <
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 - Ö * [1 – 2 * R
Syarat : As pakai ≥
402 >
Tinggi efektif balok,
a = As * fy / ( 0.85 * fc' * b ) =
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 =
Syarat : f * Mn ≥
61.732 >
Digunakan sengkang,
Syarat : Av/s pakai ≥
0.670 >
1.081 <
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
0.509 <
The Second Asumsi, the flens slab monolit with beam,
The thicness of slab
The thicness of flens slab
Pcp = 2*(b+h)+(2*2(hf+h)) =
Caclculate the torsi are calculate or not , Tu > φ*√fc'/12*(Acp^2/Pcp) =
1.081 <
(Tu*Ph/1,7*Aoh^2)^2) =
(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) =
[(Vu/bw*d)^2 + (Tu*Ph/1,7*Aoh^2)^2)
0.475 <
At/s = Tn/Ao*fy*cot.
AL = At/s*Ph*(fyv/fyl)*cot^2φ
Note :
Dalam Pemasangan Tulangan Torsi Longitudinal (A L) :
1. Di Pasang 1/4 AL di sisi atas
2. Di Pasang 1/2 AL di sisi badan balok
3. Di Pasang 1/4 AL di sisi bawah + Luas Tulangan Lentur
b= 200 mm
h= 500 mm
D= 16 mm
P= 8 mm
ts = 25 mm
b1 = 0.85
0.85 - 0.05 * ( fc' - 30) / 7 = -
b1 =
® 0.85
0 / ( 600 + fy ) = 0.0157
As perlu
219 ® AMAN (OK)
d = h - d' = 459.00 mm
a = As * fy / ( 0.85 * fc' * b ) = 65.141 mm
= As * fy * ( d - a / 2 ) * 10-6 = 68.591 kNm
f * Mn = 61.732 kNm
Mu+
10.191 ® AMAN (OK)
As perlu
219 ® AMAN (OK)
d = h - ds = 459.00 mm
a = As * fy / ( 0.85 * fc' * b ) = 65.141 mm
= As * fy * ( d - a / 2 ) * 10-6 = 68.591 kNm
f * Mn = 61.732 kNm
Mu-
4.827 ® AMAN (OK)
Vu = 40.070
f= 0.85 kN
fy = 240
Vc = (√ fc') / 6 * b * d * 10 = -3
58.311 kN
f * Vc = 49.564 kN
® Tetap perlu tulangan geser
f * Vs = Vu - f * Vc = -
Vs = 40.070 kN
2 Ø 8 kN
Av = b*S /3*fy = 277.778 mm2
Av/s perlu = 0.278 mm2/mm
Av Ø10 = 2 * 1/4 * Π * Ø^2 = 100 mm2
d/2 = 230 mm
s = Av * fy * d / ( Vs ) = 276.24 mm
s= 230 mm
® s= 150 mm
2 * 1/4 * Π * Ø^2 * (1000/200) = 670 mm2
Av/s pakai = 0.670 mm2/mm
Ø 8 150 mm
Av/s perlu
Vc = (√ fc') / 6 * b * d = 58310.867 N
(Vu/bw*d)^2 = 0.191 N
(Tu*Ph/1,7*Aoh^2)^2) = 0.068 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 0.259 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 0.509 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
Vc = (√ fc') / 6 * b * d = 58310.867 N
(Vu/bw*d)^2 = 0.191 N
(Tu*Ph/1,7*Aoh^2)^2) = 0.036 N
*d)^2 + (Tu*Ph/1,7*Aoh^2)^2) = 0.226 N
2 + (Tu*Ph/1,7*Aoh^2)^2)]^0,5 = 0.475 Mpa
Vc/b*d = 0.635 N
2*√fc'/3 = 2.541 N
(Vc/b*d+2*√fc'/3) = 3.176 N
φ(Vc/b*d+2*√fc'/3) = 2.70 Mpa
AL = 69.61 mm2
agian Atas, 1/4 * AL= 17.40 mm2
ns = 2.00 bh
Ø= 8 mm
D= 16 mm
Sb = 25 mm
ds = Sb + Ø + D (13) /2 41 mm
d = h - ds 459 mm
(b - 2*Sb - 2*Ø - 3*D) / 2 = 51.00 mm
xmin = 25.00 mm
25.00 ® (OK)
y = 25.00 mm
1/6*d = 76.00 mm
3/4*x = 38.25 mm
3.83 cm