Professional Documents
Culture Documents
Version
Effective Date
1.1
1.2 Plates
1.3
Bought out
1.4
parts
Filler
Weld
mate
ing
rial
1.5 Cons
Shiel
uma
ding
ble
gas
2 In-Process Inspection
2.1
Welding
2.2
Cutting &
2.3 Edge
Preparation
Sub Assembly
2.4
Fit-up
% Inspection Reference Execution Rejection
S.N Product/ Characteristic Mode of Acceptance Internal
AM ICF/RI Drg./ /Reproce Remarks
o Process s inspection criteria document no
D TES Specification ss/Scrap
Format No.
Version
Effective Date
2.5 NDT
Welding
2.6 Fixture/
Manipulator
3 Final Inspection
After Sub-
3.1
Assy Welding
Final
3.2 Assembly Fit-
up
Final
3.3
Inspection
Identification
3.4
Marking
Shot Blasting
3.5 Primer
Paint
Prepared By Approved By