1.0 TESTING APPARATUS
1.1 Reaction Beam
The steel girders will be laid across the test pile with system set up similar to that shown
in Appendix A.
The test shall conform to the modified ASTM D 1143-81(Reapproved 1994) item 5.0
“Standard Loading Procedure” with load sequence in percentage of design load. Three cycles
of test will be performed.
A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, and
100% of the design load.
B. When each load increment will be achieved, the next load increment will be added only
when the settlement rate will be less than 0.25 mm per hour or after 2 hours, whichever
shall occur first.
C. At each load increment, load, settlement and time will be recorded at 1, 2, 4, 8, 15, 30,
60, 90, 120, 240 minutes and every 2 hours with an accuracy of at least 0.01 mm.
D. The maximum load will be kept constant for at least 24 hours and then reduced to
75%, 50%, 25% and 0% of the design load, respectively. Each load will be maintained
until the rate of settlement would not be greater than 0.25 mm per hour or after two
hours, whichever shall occur first.
E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and
every hour thereafter until a constant settlement will be reached.
The test shall conform to the ASTM D 3689-90 (Reapproved 1995) “Standard Test
Method for Individual Piles Under Static Axial Tensile Load.” with load sequence as explain
below. The test will be conducted until the pile exhibit signs of failure.
A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, and
100% of the design load.
B. When each load increment will be achieved, the next load increment will be added only
when the settlement rate will be less than 0.25 mm per hour or after 2 hours, whichever
shall occur first.
C. At each load increment, load, settlement and time will be recorded at 1, 2, 4, 8, 15, 30,
60, 90, 120, 240 minutes and every 2 hours with an accuracy of at least 0.01 mm.
D. The maximum load will be kept constant for at least 24 hours and then reduced to
75%, 50%, 25% and 0% of the design load, respectively. Each load will be maintained
until the rate of settlement would not be greater than 0.25 mm per hour or after two
hours, whichever shall occur first.
E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and
every hour thereafter until a constant settlement will be reached.
A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%,
125%, 150%, 175% and 200% of the design load.
B. When each load increment will be achieved, the next load increment will be added
every after 5 minutes..
G. At each load increment, load, settlement and time will be recorded at 1
and 5 minutes with an accuracy of at least 0.01 mm.
H. The load will then be reduced to 175%, 150%, 125%, 100%, 75%, 50%,
25% and 0% of the design load, respectively
I.At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60
minutes and every hour thereafter until a no further settlement will be
experienced.
J. The test pile will be considered failure when a rapid progressive
movement of the pile in the direction of loading under a constant load or
physical failure of the test pile is observed or a settlement of more than
4
15% of the diagonal dimension of the pile, which is equivalent to 90
mm.
The test shall conform to the ASTM D 3966-90 “Standard Test Method for Individual
Piles Under Lateral Load.” with load sequence as explain below. The test will be conducted
until the pile exhibit signs of failure.
A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%,
125%, 150%, 170%, 180%, 190% and 200% of the design load.
B. When each load increment will be achieved, the next load increment will be added after
each load duration shown in Table 3.
C. At each load increment, load and time will be recorded at 1, 5, 10 minutes with an
accuracy of at least 0.01 mm.
D. The test pile will be considered failure when a rapid progressive movement of the pile in
the direction of loading under a constant load or physical failure of the test pile is
observed.
During the load test, records including plots of load vs. time and load vs. settlement will be
maintained progressively.
x Time, load, pile head movements, settlements and reference beam movements.
x Load-settlement curve.
x Time-settlement curve.
x Time-load curve.
x Report and recommendations on the ultimate pile capacity.
5
ESTIMATION OF ULTIMATE LOAD FROM PILE LOAD TEST BY DAVISSON METHOD
0 0 0.0 0 0 0.0
50 49.5 49.5 50 43.5 43.5
100 100.5 100.5 100 93.5 93.5
150 150.5 150.5 150 143.5 143.5
200 199.5 199.5 200 193.5 193.5
250 250.0 250.0 250 244.0 244.0
300 302.0 302.0 300 295.0 295.0
350 352.0 352.0 350 345.5 345.5
400 403.5 403.5 400 395.5 395.5
450 456.5 456.5 450 448.0 448.0
480 485.0 485.0
Calibrated
0 0 0.0 0 0 0.0
100 27.0 27.0 100 20.0 20.0
200 53.5 53.5 200 46.0 46.0
300 82.0 82.0 300 73.0 73.0
400 109.0 109.0 400 101.0 101.0
500 138.0 138.0 500 130.0 130.0
600 165.0 165.0
Calibrated
0 0 0.0 0 0 0.0
50 3.0 3.0 50 3.0 3.0
100 9.0 9.0 100 9.0 9.0
150 15.0 15.0 150 14.5 14.5
200 20.0 20.0 200 19.0 19.0
250 25.5 25.5 250 25.0 25.0
300 31.0 31.0 300 30.0 30.0
350 37.0 37.0 350 35.5 35.5
400 42.0 42.0 400 41.0 41.0
450 48.0 48.0 450 47.0 47.0
500 54.0 54.0 500 53.0 53.0
550 59.0 59.0
Calibrated
Main Beam
385
416 417
Main Beam
Hydraulic Jack
Reaction Beam
367 368 369
Hydraulic Jack
416 417
432
Hydraulic Jack
1.0 m.
416 417