You are on page 1of 5

BATI RIHTIMI AKARYAKIT TAHLİYE NOKTASI İNŞAATI İŞİNE

AİT ACİLDURUM DUŞU VE GÖZ YIKAMA ÜNİTESİ ŞARTNAMESİ

REVİZYON AÇIKLAMA HAZIRLAYAN KONTROL EDEN ONAYLAYAN

0 YAYIN SALİH ÜREK ALP ALTINOK

BATI RIHTIMI AKARYAKIT TAHLİYE NOKTASI İNŞAATI TARİH SAYFA REV.


İŞİNE AİT ACİLDURUM DUŞU VE GÖZ YIKAMA ÜNİTESİ
25/07/2011 1/5 00
ŞARTNAMESİ
TABLE of CONTENTS

1 INTRODUCTION ................................................................................................. 3
2 GENERAL............................................................................................................ 3
3 SCOPE OF SUPPLY ........................................................................................... 4
4 TECHNICAL REQUIREMENTS ........................................................................... 5
4.1 DESIGN CONDITIONS........................................................................................ 5
4.2 MECHANICAL REQUIREMENTS ........................................................................ 5
4.3 ELECTRICAL REQUIREMENTS ......................................................................... 5
4.4 METEOROLOGICAL CONDITIONS AND SITE DATA......................................... 5
4.5 NOZZLES AND MISCELLANEOUS CONNECTIONS.......................................... 6
4.6 AREA CLASSIFICATION ..................................................................................... 6
4.7 SUPPORT BRACKET / MOUNTING FRAME ...................................................... 6
5 MATERIALS ........................................................................................................ 6
5.1 MATERIAL REQUIREMENTS ............................................................................. 6
5.2 MATERIAL CERTIFICATES ................................................................................ 6
6 SURFACE PREPARATION AND PAINTING ....................................................... 7
7 EMPLOYER REQUIREMENTS ........................................................................... 7

BATI RIHTIMI AKARYAKIT TAHLİYE NOKTASI İNŞAATI TARİH SAYFA REV.


İŞİNE AİT ACİLDURUM DUŞU VE GÖZ YIKAMA ÜNİTESİ
25/07/2011 2/5 00
ŞARTNAMESİ
1 INTRODUCTION
This specification covers the minimum technical requirements for:

No. off Equipment No. Description


1 AKY-EES-001 Emergency Shower and Eyewash

The emergency shower and eyewash shall be supplied with process water. The
pipe lines shall be provided with electrical tracing and insulation to prevent freezing
of the water.

2 GENERAL

The equipment shall conform to all applicable codes and all necessary approvals
shall be obtained.
The international system of S.I. units shall be used.
Exceptions are:
pressure units in bar;
temperature units in ºC.

3 SCOPE OF SUPPLY

The scope of supply for the emergency shower and eyewash, without limitations:

Description Scope Comments/Remarks


1. Twenty eight (28) emergency X
shower and eyewash units
2. Support Bracket / mounting frame X
3. Top spray nozzle X
4. Hand and foot control X
5. Galvanized chain X
6. Pipe work / connecting welding neck X In the unit, including
flanges 1" – 150# according ASME connecting stainless
B16.5 steel pipes
7. Valves X In the unit
8. Eyewash / Face wash fountain X With swing covers, in line
with top spray; located
on the right side of the
shower (looking towards
the entrance of the
shower)
9. Rescue signs (pictograms) X
10. Automatic dump X To prevent legionella
11. Two lifting lugs X
12. Earthing lugs/bolts X
13. Surface preparation and painting X
14. Authority approval and certification X
(PED/CEIIA)

BATI RIHTIMI AKARYAKIT TAHLİYE NOKTASI İNŞAATI TARİH SAYFA REV.


İŞİNE AİT ACİLDURUM DUŞU VE GÖZ YIKAMA ÜNİTESİ
25/07/2011 3/5 00
ŞARTNAMESİ
4 TECHNICAL REQUIREMENTS

4.1 DESIGN CONDITIONS


The emergency shower and eyewash units shall be installed with following
mechanical design conditions:

Supply process temperature : 15°C Supply


process pressure : 3 BarG Supply
design temperature : 50 °C Supply
design pressure : 5 BarG Water
capacity shower : 75 l / min. 1)
Water capacity eye fountain : 11 l / min. 1)

1) Capacity of unit shall be suitable for using shower as well as eyewash at the same time.

4.2 MECHANICAL REQUIREMENTS

4.2.1. The equipment and its appurtenances shall be designed for safe operation and
easy maintenance. Provisions, as are required to ensure personnel safety,
shall be supplied.
4.2.2. Proven design, carried out in carbon steel
4.2.3. Automatic functioning of the emergency shower and eyewash
4.2.4. The emergency shower and eyewash shall be designed to prevent growth of
bacterium (microbe) and Legionella pneumophila.
4.2.5. The piping work shall be in accordance with piping specification
4.2.6. The valves, strainers, sight glasses and gaskets shall be in accordance with
piping specification.
4.3 ELECTRICAL REQUIREMENTS

The Emergency Shower System shall be equipped with earthing lugs on both
ends (diagonally opposite).
4.4 METEOROLOGICAL CONDITIONS AND SITE DATA

Marine Environment; Antalya / Turkey


Ambient Temperature range : -5°C ~ +55°C.
Humidity : 100%

4.5 NOZZLES AND MISCELLANEOUS CONNECTIONS

All bolt-holes shall straddle the natural centre lines (if applicable).
In case of external bolting, bolts have to be such a length, that the mounted nut
covers the complete length of the thread. The free effective end of the bolt thread
shall not exceed 2 thread lines.

4.6 AREA CLASSIFICATION

The emergency shower and eyewash shall be installed in a hazardous area


classified according EN-IEC-60079-10-1 zone 1.

4.7 SUPPORT BRACKET / MOUNTING FRAME

The Emergency Shower support bracket shall be of fabricated steel and shall
extend the full length and width of the unit.

BATI RIHTIMI AKARYAKIT TAHLİYE NOKTASI İNŞAATI TARİH SAYFA REV.


İŞİNE AİT ACİLDURUM DUŞU VE GÖZ YIKAMA ÜNİTESİ
25/07/2011 4/5 00
ŞARTNAMESİ
Support bracket/frame shall be sufficiently rigid and provided with adequate means
for fastening. The Emergency Shower unit shall be furnished with lifting lugs,
strength calculations to be provided for both lugs and welds.

5 MATERIALS

5.1 MATERIAL REQUIREMENTS

Material selection: SS

Where stainless steel is used the quality of the steel shall be 316 due to the
marine environment conditions.

5.2 MATERIAL CERTIFICATES

Material certificates shall be supplied, as a minimum:


1. For pressure containing and medium wetted parts: certificate according to
ISO 10474/EN 10204-minimum 3.1
2. For all other parts:
certificate according to ISO 10474/EN 10204-minimum 2.2.

6 SURFACE PREPARATION AND PAINTING

All stainless steel parts shall be pickled and passivated.

Bare carbon steel surfaces are not allowed.

7 EMPLOYER REQUIREMENTS

Engineering, procurement, construction and commissioning shall meet the


Employer Requirements.

BATI RIHTIMI AKARYAKIT TAHLİYE NOKTASI İNŞAATI TARİH SAYFA REV.


İŞİNE AİT ACİLDURUM DUŞU VE GÖZ YIKAMA ÜNİTESİ
25/07/2011 5/5 00
ŞARTNAMESİ

You might also like