The document outlines the tasks and marking scheme for a final year research and design trade project involving surveying, architectural drawings, structural elements, soil mechanics, services, measurement and estimation, structural drawings, and presentation. It lists 8 tasks covering areas like surveying, architecture, structure, soil mechanics, services, measurement and costing, structural drawings, and overall presentation. Marks are awarded for completion of specific activities within each task, with the total marks for the project being 100.
The document outlines the tasks and marking scheme for a final year research and design trade project involving surveying, architectural drawings, structural elements, soil mechanics, services, measurement and estimation, structural drawings, and presentation. It lists 8 tasks covering areas like surveying, architecture, structure, soil mechanics, services, measurement and costing, structural drawings, and overall presentation. Marks are awarded for completion of specific activities within each task, with the total marks for the project being 100.
The document outlines the tasks and marking scheme for a final year research and design trade project involving surveying, architectural drawings, structural elements, soil mechanics, services, measurement and estimation, structural drawings, and presentation. It lists 8 tasks covering areas like surveying, architecture, structure, soil mechanics, services, measurement and costing, structural drawings, and overall presentation. Marks are awarded for completion of specific activities within each task, with the total marks for the project being 100.
HIGHER DIPLOMA PROJECT MARKING SCHEME IN CONSTRUCTION (STRUCTUERS)
TASK NO. 1: SURVEYING
S/NO Task Total marks Marks Awarded 1 Carry out a chain survey 2 2 Reducing levels 2 3 Preparation of a topographical map 4 total 8 TASK NO. 2: ARCHITECTURAL
1 Preparation of architectural drawings for the block 4
2 Drawing of a site location plan 2 3 Preparation of a site plan 2 total 8 TASK NO.3: STRUCTURAL 1 Foundation 6 2 Beams 5 3 Staircase 4 4 First floor slab 6 5 Columns 3 6 Swimming pool 4 total 35 TASK NO. 4: SOIL MECHANICS 1 Report writing on the various tests 5 total 5 S/NO Task Total marks Marks Awarded 1 Storm water drainage system 4 total 4 TASK NO. 6: MEASUREMENT ESTIMATING AND COSTING 1 Take off all quantities for the substructure 5 2 Abstraction 3 3 prepare bills of quantities for the works taken off 3 4 Build up unit rates for the substructures 4 Total 15 TASK NO.7 STRUCTURAL DRAWINGS 1 Foundation Drawings /sections 2 2 Beams Drawings/ sections 2 3 Staircase Drawings/sections 2 4 First floor slab Drawings/sections 2 5 Columns Drawings/sections 2 total 10 TASK NO. 8: OVERALL PRESENTION 1 Correct binding 2 2 Legibility of wordings 3 3 Completeness of the project 5 4 Overall presentation of the project 5 total 15 GRAND TOTAL 100%