KIHBT JANUARY TO SEPTEMBER 2016

FINAL YEAR RESEARCH AND DESIGN TRADE PROJECT

HIGHER DIPLOMA PROJECT MARKING SCHEME IN CONSTRUCTION (STRUCTUERS)

TASK NO. 1: SURVEYING


S/NO Task Total marks Marks Awarded
1 Carry out a chain survey 2
2 Reducing levels 2
3 Preparation of a topographical map 4
total 8
TASK NO. 2: ARCHITECTURAL

1 Preparation of architectural drawings for the block 4


2 Drawing of a site location plan 2
3 Preparation of a site plan 2
total 8
TASK NO.3: STRUCTURAL
1 Foundation 6
2 Beams 5
3 Staircase 4
4 First floor slab 6
5 Columns 3
6 Swimming pool 4
total 35
TASK NO. 4: SOIL MECHANICS
1 Report writing on the various tests 5
total 5
S/NO Task Total marks Marks Awarded
1 Storm water drainage system 4
total 4
TASK NO. 6: MEASUREMENT ESTIMATING AND COSTING
1 Take off all quantities for the substructure 5
2 Abstraction 3
3 prepare bills of quantities for the works taken off 3
4 Build up unit rates for the substructures 4
Total 15
TASK NO.7 STRUCTURAL DRAWINGS
1 Foundation Drawings /sections 2
2 Beams Drawings/ sections 2
3 Staircase Drawings/sections 2
4 First floor slab Drawings/sections 2
5 Columns Drawings/sections 2
total 10
TASK NO. 8: OVERALL PRESENTION
1 Correct binding 2
2 Legibility of wordings 3
3 Completeness of the project 5
4 Overall presentation of the project 5
total 15
GRAND TOTAL 100%