Adding smo3.
Service number we have to maintain master record. AC03
After this, the actual cost will be calculated and also the status will change to GMPS
Now we will confirm for time. i.e labor hours. (for internal labor above)
Using iw42
Press save.
So till now, for PGI, material document is created and for time related activities,
Confirmation is created.
We created the PO and did goods receipt, this changed the cost of the external services.
Please refer below screen shot of cost and document flow
Action log shows who did the changes.
Billing
System changed the material number above coz of DIP profile. For materials which are
already created (in service master), it will use the same number.
Sales price view
Settlement means the cost is transferred to another account so that COPA people can do
the profit analysis.
Order type
Dip profile assigned below. And it also assigns the default sales order type
COST ELEMENT CMES FROM
ABOVE PROFILE ASSIGNMENT DONE BELOW
Control key
Costing settings
Costing variant assigned to plant and order below. (please do in ur CR)
Characteristics tells what criteria should be used while determining the material
In above case, 3 ticks are for material determination. Because of this system is
considering below 3 criteria for selecting material.
Sources- from where it should pick up. It should come from actual cost. It acts as a
source so that DIP profile can work.
i.e. in below case, if the actual cost is 0 then, material wont be determined.
The filed in the source criteria are the fields which are ticked in characteristic (in
characteristic relevant). Check below