Professional Documents
Culture Documents
Drilling Threading Procedure
Drilling Threading Procedure
1 de 3
Código
INTAKE MANIFOLD; DRILLING AND draft
THREADING PROCEDURE, CNG PROJECT Fecha Elaboración
29/04/10
1.0 OBJECTIVE
This procedure was designed to drill and thread the intake manifolds as part of the
CNG production on MAV plant, following MMC recommendations for particles cleaning
on the reworked part.
2.0 REACH:
This procedure is for drilling and threading for both MMC and HMC intake manifolds
This procedure does not include disassembly or assembly of intake manifold from engine
3.0 PROCEDURE.
FIRMAS
DRAFT Página
2 de 3
Código
INTAKE MANIFOLD; DRILLING AND draft
THREADING PROCEDURE, CNG PROJECT Fecha Elaboración
29/04/10
FIRMAS
DRAFT Página
3 de 3
Código
INTAKE MANIFOLD; DRILLING AND draft
THREADING PROCEDURE, CNG PROJECT Fecha Elaboración
29/04/10
FIRMAS