On 11th April at 17:30 Mabrook SW2. Circulating & Reciprocating string at 4770 M. Prior to Cut Core.Driller informed Ch Mech & Tool Pusher, a
DW crown block saver engaged. Checked Driller side upper limit crown block saver sensor *OK*. Noticed DW Toggle valve tilted. Clearance bet
Toggle valve and drum wire wound had sufficient clearance & there was no chance to hit the Toggle. Observed Fast line had come out from gro
Toggle valve. Immediately set Slips in Rotary & slack off WOS 189 Tons.
The following for Minor (between 1-3 hrs.) and Moderate (between 3-12 hrs.) Severity only.
Parts Required/Approximate Cost of Parts Used for Repairs USD
Technician Required/Approximate Cost of Technician USD
Logistics Required /Approximate Cost of Logistics USD
Cost of loss Revenue USD 0.00
Toal Cosat of Event USD 0.00
Immediate causes: Underlying / Root Causes
DW crown block saver engaged. Invistigation under process
Noticed Drill line fast end came out, first 4 wraps became loose on Drum
Corrective and Preventive Action (To be uploaded in INTELEX): CA or PA Responsible Person Department
Apply Baker Lock on end of Fast line, installed Additional Clamp on end. PA TP Drilling
Stopped application of Dope on Drill line spooler guide bars, instead using PA TP Drilling
light coat of lubricant oil.
Photo #1 Photo # 2
DRL-PR-001-FM-01-01
Photo #1 Photo # 2
Distribution List: CEO, DCEO, DS, HSE Manager, Senior HSE advisor, BD Manager and Quality Dept.
DRL-PR-001-FM-01-01
Floor
/ 17/ 1
ate Prior to Coring.
New Rig
12/4/2017 2:30AM
pment
JC 10 - 006
00
00
Action date
11/4/2017
11/4/2017
DRL-PR-001-FM-01-01
DRL-PR-001-FM-01-01