Letter No: AA/PBDK/PDEPL/2127/19-20/1090 Date: 21.06.

2019

To,
The Authorised Representative
M/s. Porbandar Dwaraka Expressway Pvt. Ltd.,
Opp. Madhvani College,
Near SBI Regional office no. 5,
Airport Road, Village-Chhaya,
Dist. Porbandar

Sub.: Four laning with paved shoulder of Porbandar-Dwarka section of NH-8E (Ext.) from
Km. 356.766(Design Chainage Km 379.100) to Km 473.000 (Design Chainage
496.848) in the state of Gujarat through Public Private Partnership (PPP) on Hybrid
Annuity Mode–
Reg.: Submission of Drawing of RE Wall of VUP at Ch. 381+533 under the Change
of Scope (COS)

Ref.: 1) Your letter no. PDEPL/2019/PO-DK/2398, dated: 10.06.2019

Dear Sir,

This has reference to your above cited letter no. 2398, vide which you have submitted
compliance to IE’s observations.

We have reviewed your reply and our observations are as follows;

The lowest design height section as per the approved designs is 2.23 m which has 4-layers
of primary reinforcements. The submitted design cross section for height 1.621 m has only
3-layers of primary reinforcements. Discarding any reinforcement layer or exceeding
the spacing of reinforcement in a particular design height from the corresponding
approved section, requires a fresh RE Wall design for that particular height.

Hence, the Concessionaire must confirm the no. of design sections to be used throughout
the structure, in this case VUP at Km. 381+533 and all of them shall be submitted for
concluding the design and drawing review apart from the already consented sections.

This is for your information and necessary compliance please.

With best regards,


for Aarvee Associates Architects Engineers and Consultants Pvt. Ltd.

Rafi Ahmad
Team Leader cum Senior Highway Engineer (Pkg. 8)

Copy to:
1. The Project Director NHAI, PIU-Devbhumidwarka for information
2. The Authorized Signatory, Aarvee Associates Pvt. Ltd., Hyderabad