A. General Requirements
The procedure is project specific and identifiable by Budget Item (BI) or SAEP-1154,
A1
Job Number, Contract Number & Project title. Para. 5.4.2.2a
Procedure References list Industry Standards API STD 560, API RP 936 SAES-N-100,
A9
& ASTM Standards applicable to the refractory scope of work. Para. 3.2
Procedure states that "Refractory Installation" work will not begin until Sch. Q, Att. IV,
A12
Refractory work procedures have been approved by Company. Para. 2.1 & Table
B. Materials Section (Procedure lists material requirements, storage & handling controls)
SAES-N-100,
B1 Procedure lists refractory material restrictions related to asbestos use.
Para. 7.1.1
Procedure lists/references castable refractories (SAMS Serial numbers)
SAES-N-100,
B1 based on physical properties specified on data sheets & values listed in
Para. 7.1.3
SAES-N-100, Table 2 (Data for Castable Refractory). See Note 2
SAES-N-100,
B3 Anchors for single-layer, castable linings are "V" shaped types .
Para. 8.2.1
Page 1 of 4
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Refractory Installation Procedure SAIC-N-2018 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Anchors for dual-layer linings for the support of insulating castable SAES-N-100,
B4
refractory shall be "Y" types. Para. 8.2.1
SAES-N-100,
B5 All "V" and "Y" type anchors are specified with rubber or plastic caps.
Para. 8.2.2
SAES-N-100,
B6 Anchor Details for castable refractory linings meet SASD AC-036397.
Para. 8.2.3
Anchors for all types of RCF linings are welded to equipment & meet SAES-N-100,
B7
SASD AB-036395 & AB-036400. Para. 8.2.5
SAES-N-100,
B8 Hexsteel material is the offset-lance, tight-clinched type (welded).
Para. 8.3.1
Riveted type hexsteel is limited for use on external surfaces of piping that SAES-N-100,
B9
is 12 inch NPS and less. Para. 8.3.2
SAES-N-100,
B13 Hexsteel installation details meet SASD AB-036396 requirements.
Para. 8.3.6
Nozzle and manway opening details in refractory lined pressure vessels SAES-N-100,
B14
and piping meet SASD AB-036914. Para. 8.4
Page 2 of 4
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Refractory Installation Procedure SAIC-N-2018 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-N-110,
D1 Final visual dimensional checks of panels per construction drawings.
Para. 5.3
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003
2. SAES-N-100 -- Refractory Systems (30 November 2004)
3. SAES-N-110 -- Installation Requirements-Castable Refractories (30 November 2004)
4. SAES-N-120 -- Installation Requirements-Extreme Erosion Resistant Refractories (30 November 2004)
5. SAES-N-130 -- Installation Requirements-Fireclay Bricks (30 November 2004)
6. SAES-N-140 -- Installation Requirements-Refractory Ceramic Fiber (30 November 2004)
7. SAES-W-010 -- Welding Requirments for Pressure Vessels (30 June 2002)
8. API RP 936 -- Refractory Installation Quality Control Guidelines - Inspection & Testing Monolithic Refractory Lining & Materials (Feb 2004 Edition)
9. API Standard 560 -- Fired Heaters for General Refinery Service (May 2001)
Page 3 of 4
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Refractory Installation Procedure SAIC-N-2018 25-May-05 MECH-