Professional Documents
Culture Documents
Four laning of End of Pandoh bypass to Takoli section of NH-21 from km 221.305 to km 242.000 in the state of Himachal
Pradesh under NHDP Phase IVB-Package-II to be executed on Hybrid Annuity Mode
Make of Fibre:
Observations:
Sr. No. Wt. of Cube Wt. of Wt. of Wt. of Observed Observed Required Remarks
Mould Empty Shotcrete Density of Fibre Fibre
+ Shotcrete Mould ShotCret Content Content
Kgs (Kgs) (Kgs) (Kg/m³) (Wt. Kg/m3) (Wt. Kg/m3)
(A) (C) (B/A)xC
Fibre
Remarks:
(Kgs)
(B)