BILL OF MATERIALS

MATERIALS QTY UNITS UNIT COST AMOUNT


CEMENT 15 bags 235 3525
SAND 0.6 cum 800 480
CHB 4" THICK 192 pcs. 12 2304
10mmФ DEF. BAR 15 pcs. 125 1875
2"x3"x6' coco lumber 7 pcs. 60 420
TIE WIRE 2 rolls 55 110
CWN #4 1 kgs. 48 48
SUB-TOTAL 8762

A. TOTAL MATERIAL COST: 8762


B. LABOR COST(30% of A): 2628.6

TOTAL PROJECT COST: 11390.6

NOTES:
MORTAR - CLASS D (1:5)
PLASTER - CLASS A (12 MM THICK)
REBARS @ WALLS - EVERY 3 LAYERS , @ 60 CM VERT. SPACING
REBARS @ FLOORING - 10 MM Ф DEF. BAR SP. 0.25 M OC BW