You are on page 1of 5

8D PROBLEM SOLVING REPORT

Summary Worksheet
Date Initiated: Concern/Issue #:
D1 - PROBLEM SOLVING TEAM
Problem Owner Information Product Information Problem Initiator Information / Customer
Company Name: Part Number: Company Name:
Co. Co. Location/Identifier:
Location/Identifier:
Team Lead Name: Part Description: Initiator Name:
Team Lead Title: Initiator Title:
Phone/email: Program Name: Phone:
Executive Champion Name/Title: Email:
Problem Solving Team – Name/Role *Must identify Problem owner

Sr. NO. Name Role Department Email Phone number

D2 - PROBLEM DESCRIPTION
Problem Identification Sketch or Photo
Customer effect/Customer Complaint:

Customer
Requirement:

Deviation from Customer Requirement:

Where/When is the problem occurring:

Frequency of the problem? Problem Solving Goal Statement & Target Timing:

Describe the measurement method to evaluate problem (include capability):

D3 - CONTAINMENT ACTIONS
8D PROBLEM SOLVING REPORT
Summary Worksheet
Date Initiated: Concern/Issue #:
Containment
List all locations and quantities of suspect product Location Contact Potential Qty Actual Qty. Containment Details
1) Containment Start Date:
2)
3) Containment Method:
4)
5) Nonconformance Rate:
6) Projected:
Totals=> Actual:
Failure Mode Analysis
Product feature(s) not in compliance: Failure mode causing product nonconformance:
Product Specification:
Deviation from Containment Verified? Yes No
Specification:
D4 - ROOT CAUSE ANALYSIS
Root Cause Analysis
Problem
Why was
the Why? Why? Why? Why? Why? Employee Machine Measuremen
problem t
not
detected

Why did the Why? Why? Why? Why? Why?


problem
occur
Metho Material Environme
d nt
Why a Why? Why? Why? Why? Why?
systemic
issue

3 x 5 Why Analysis Results


Failure Mode Cause: SRC
Systemic Root Cause – What in the planning Confirmed
Escape Root Cause – ERC Confirmed? process failed to predict this problem ?
Why was NC product
shipped?
8D PROBLEM SOLVING REPORT
Summary Worksheet
Systemic Root Cause – What in the planning
Escape
DateRoot Cause –
Initiated: Concern/Issue
process failed to #:
predict this problem
Why was NC product
shipped?
Occurrence Root SRC Confirmed? Key Findings – Findings that could drive
Cause – Why was NC improvement in higher-level processes?
product made?
D5 & D6 : SELECT AND IMPLEMENT PERMANENT CORRECTIVE ACTION
Choose & Implement Corrective Actions
Escape Corrective Actions: Responsible Due Date Status
1)
2)
3)
Occurrence Corrective Actions:
1)
2)
3)
Systemic Corrective Actions:
1)
2)
3)
Key Findings Actions:
1)
2)
3)
Status Codes Defined: Action Identified Action Validated Action Implemented Closed
Verify Effectiveness of Implement Actions
Corrective Actions Ongoing Performance Enter Number Resolved* Not Resolved**
Escape Verification: Measurements over past days have shown problem to be:
Occurrence Verification: Measurements over past days have shown problem to be:
Systemic Verification: Measurements over past days have shown problem to be:
Resolved Not Resolved**
*
8D PROBLEM SOLVING REPORT
Summary Worksheet
Date Initiated: Concern/Issue #:
Further EPS Activity Required
Replicate ALL actions for similar products & processes.
Date Unsuccessful CA EPS Re-start Phase
Complete for each corrective action

Containment Removed?
Yes No Date:
D7 : PREVENTION OF RE-OCCURRENCE
Close Problem Do following documents require an update ?
Date
Replicate Corrective Action Responsible Date Responsible Date Planned
Closed
PFMEA
Control Plan
Work Instruction
Procedures
Forms / Formats
Maintenance Instructions
Lessons Learned
Others
Others
Others
Capture Lessons Learned
D8 : FINALIZATION AND ACKNOWLEDGEMENT OF SUCCESS
Presentation by Team
Date: Photo: Photo:
Reviewed by:
Feedback:
Remarks
Close Problem
Approve Closure
Name Role Company Date
8D PROBLEM SOLVING REPORT
Summary Worksheet
Date Initiated: Concern/Issue #:
Name Role Company Date
(Y or N)?

You might also like