Professional Documents
Culture Documents
CUSTOMER & plant Supplier / Designation & REF. CUSTOMER PRODUCT (Designation + Re
Warranty
0 km Return
Internal S Y
Supplier N
Logistic ANALYSIS BY supplier - conclusion ARC Code date
Project R Y
Safety Supplier issuer N
1D Problem Identification
CUSTOMER VIEW Supplier VIEW
- What is the difference between good and
- What happened?
bad parts?
BAD GOOD
PART PART
2D Containment measures
1. IMMEDIATE COUNTERMEASURES IN CUSTOMER PERIMETER ? WHO DATE WHERE VALIDATION
OCCURRENCE
PROBLEM
DESCRIPTION :
Material
Method
Machine
Man
DETECTION
Must Is
Material ( measurement
device)
Machine
Method
Man
3Db Reproduce the defect
- WHAT WAS DONE TO
REPRODUCE THE
CONCERN?
- IS THE ROOT-CAUSE
VERIFIED?
Evidence Evidence
1st because 5 a th because
2nd WHY
yes :
camera
qualificatio
2nd because n Evidence
beginning
of
november
3rd WHY 5b th WHY
4th WHY
4a th because Evidence
4b th because Evidence
POTENTIAL CAUSE Operators don't see that they packed unmarking part POTENTIAL CAUSE [1]
% progress
Méthode de mesure de
N° Responsibles / Validation of
Initialized
action
Root Cause Occurrence - Corrective action description l'efficacité / objectif à
Pilot
Schedule Documents
actions
Check the results
100%
25%
50%
75%
atteindre
% progress
Méthode de mesure de
N° Responsibles / Validation of
Detection - Corrective action description l'efficacité / objectif à
Initialize
Root Cause Schedule Documents Check the results
action Pilot actions
100%
25%
50%
75%
atteindre
% progress
Méthode de mesure de
N° Responsibles / Validation of
Initialized
action
Root Cause Occurrence - Corrective action description l'efficacité / objectif à
Pilot
Schedule Documents
actions
Check the results
100%
25%
50%
75%
atteindre
1. DOCUMENTATION Y/N WHO Due date Done date 2. Generalization of countermeasures to similar lines / products
PRODUCT FMEA
PROCESS FMEA
YES Lines:
LOGISTIC FMEA
Procedure is for all lines, all products and the 2 production
plants (cluses, casablanca)
INSTALLATION FMEA
NO Products:
CONTROL PLAN
MAINTENANCE PLAN
PROCEDURE:
(put the name)
DESIGN STANDARD