This document contains a work load calculator that shows the monthly call volume, average handle time (AHT) in minutes, base full time equivalent (FTE) required based on volume and AHT, a shrinkage percentage of 22.9%, and the required FTE needed after accounting for shrinkage for each month. The required FTE ranges from 324.44 to 724.35 based on the monthly call volume and other factors.
This document contains a work load calculator that shows the monthly call volume, average handle time (AHT) in minutes, base full time equivalent (FTE) required based on volume and AHT, a shrinkage percentage of 22.9%, and the required FTE needed after accounting for shrinkage for each month. The required FTE ranges from 324.44 to 724.35 based on the monthly call volume and other factors.
This document contains a work load calculator that shows the monthly call volume, average handle time (AHT) in minutes, base full time equivalent (FTE) required based on volume and AHT, a shrinkage percentage of 22.9%, and the required FTE needed after accounting for shrinkage for each month. The required FTE ranges from 324.44 to 724.35 based on the monthly call volume and other factors.