Professional Documents
Culture Documents
UNIT RATE Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
TOTAL
51 198 0 49 0 74 305 20 252 292
MANHOURS
A General
A1 Reconfiguration Study Report (engineering workpack) B137-BPC-PRSB-GN-RPT-001 To be reviise 20 40
A2 Overall modification scope of works B137-BPC-PRSB-GN-RPT-002 To be reviise 2 16 2 4 36
A3 Construction Job cards B137-BPC-PRSB-GN-RPT-003 To be reviise 2 20 4
A4 Proposed Construction schedule B137-BPC-PRSB-GN-RPT-004 To be reviise 1 8 1
A5 Consolidated Bulk MTO's B137-BPC-PRSB-GN-RPT-005 To be reviise 1 1 1 2
A6 Cost Estimation B137-BPC-PRSB-GN-RPT-006 To be reviise 2 8 1
B Process
B1 Piping & Instrumentation Diagram (P&ID) 9355-B100-A2-INF-0014 / 9355-B100-A2-INF-0015 To be reviise 2 8
B3 Line Sizing Study (if any) B137-BPC-PRSB-PR-CALC-001 To be reviise 2 8
B4 Line List B137-BPC-PRSB-PR-LIST-001 To be reviise 2 8
C Mechanical
C1 New Equipment Layout B137-BPC-PRSB-ME-DWG-GA-001 To be reviise 4 8 8 36 18
C3 Mechanical Equipment List B137-BPC-PRSB-ME-LIST-001 To be reviise 2 8
C4 Tank datasheet B137-BPC-PRSB-ME-DTS-002 To be reviise 2 8
C5 Pump datasheet B137-BPC-PRSB-ME-DTS-001 To be reviise 1 4
D Piping
D2 Piping Layout B137-BPC-PRSB-PI-DWG-GA-001 To be reviise 4 8 4 128 36
D3 Piping Support details B137-BPC-PRSB-PI-DWG-PS-001 To be reviise 4 8 4 24 36
D5 Piping Isometric Drawings (new) B137-BPC-PRSB-PI-DWG-ISO-001 unil XX To be reviise 8 24 4 60 30
D8 Technical Requisition Package for To be reviise
- Piping manual valves datasheet B137-BPC-PRSB-PI-DTS-002 To be reviise 2 8
- Piping specialty item datasheet B137-BPC-PRSB-PI-DTS-003 To be reviise 2 8
D9 Piping Bulk MTO B137-BPC-PRSB-PI-RPT-001 To be reviise 1 1 4
D10 Valve List B137-BPC-PRSB-PI-RPT-002 To be reviise 2 4
D11 Piping specialty item List B137-BPC-PRSB-PI-RPT-003 To be reviise 2 16
D12 Tie in List B137-BPC-PRSB-PR-LIST-002 To be reviise 1 2
E Structural
E2 Structural Layout B137-BPC-PRSB-CS-DWG-GA-001 To be reviise 2 8 24
E3 Structural Bulk MTO B137-BPC-PRSB-CS-RPT-001 To be reviise 2 8
E4 Bundwall layout B137-BPC-PRSB-CS-DWG-GA-002 To be reviise 2 8 12
E5 Tank Foundation Layout B137-BPC-PRSB-CS-DWG-GA-003 To be reviise 2 8 12
G Safety
G1 Safety route access B137-BPC-PRSB-SAFE-DWG-GA-001 To be reviise 2 8 16
H Others
H1 Project Management - 19 38
H2 Review of documentation - 12 54
H3 Document schedule - 12 33