You are on page 1of 11

YOUR REF 來函檔號 :

OUR REF 本署檔號 : CO MW/1-50/1/10


FAX 圖文傳真 : 2523 9380
TEL 電話 : 3842 3453
WEBSITE 網址 : www.bd.gov.hk

29 October 2021
To: All Authorized Persons
Registered Structural Engineers
Registered Geotechnical Engineers
Registered Inspectors
Registered General Building Contractors
Registered Specialist Contractors
Registered Minor Works Contractors

Dear Sir/Madam,

Amendments to the “Technical Guidelines on Minor Works Control System”


(Technical Guidelines)

Further to the promulgation of “Amendments to the Technical Guidelines


(March 2021)”, I would announce that the following amendments have been made:

(a) Paragraphs 3.3.1 and 3.24.1 to include relevant requirements of Practice


Notes for Authorized Persons, Registered Structural Engineers and
Registered Geotechnical Engineers (PNAP) APP-164 on above-ground
drainage system; and

(b) Paragraphs 3.3.2 and 3.15.2 to refer to section 2.4 of the Code of Practice
for Foundations 2017 on laying drainage and construction of fence wall on
newly reclaimed land.

2. The amendments in the Appendix have been uploaded to Buildings Department


website www.bd.gov.hk under the “Codes, design manuals and guidelines” page of the
“Resources” section. The 2021 edition of the Technical Guidelines is under preparation and
will be issued in due course.

Yours faithfully,

( TAM Wing-cheung )
Assistant Director/Corporate Services
for Building Authority

九龍油麻地海庭道 11 號西九龍政府合署北座屋宇署總部
Buildings Department Headquarters, North Tower, West Kowloon Government Offices, 11 Hoi Ting Road, Yau Ma Tei, Kowloon.
Amendments to the Technical Guidelines on Minor Works Control System
(October 2021)

Legend :
Amended
Deleted

(10/2021)

1
Amendments to the Technical Guidelines on Minor Works Control System

Current version Amendments


3.3.1 Aboveground drain 3.3.1 Aboveground drain

Other  B(SSFPDWL)R 11 - Proper disposal of soil. Other  B(SSFPDWL)R 11 - Proper disposal of soil.
considerations  B(SSFPDWL)R 24 , 25 & 30 - Provision of considerations  B(SSFPDWL)R 24 , 25 & 30 and PNAP APP-
traps for soil & waste pipes and anti- 164 - Provision of traps for soil & waste
siphonage pipes. pipes and anti-siphonage pipes.
 B(SSFPDWL)R 28 - Control of bends in soil  B(SSFPDWL)R 28 - Control of bends in soil
& waste pipes. & waste pipes.
 B(SSFPDWL)R 31 - Ventilation pipe carried  B(SSFPDWL)R 31 - Ventilation pipe carried
up to not less than 1 m above roof. up to not less than 1 m above roof and
 B(SSFPDWL)R 29, PNAP APP-93 & PNAP considering to increase the height to 3 m
ADV-14 - Provision of access for repair & above an accessible roof as recommended
maintenance. in PNAP APP-164.
 B(SSFPDWL)R 34 - Control of the materials  B(SSFPDWL)R 29, PNAP APP-93 & PNAP
for pipes. ADV-14 - Provision of access for repair &
 B(SSFPDWL)R 26, 27, 31 & 32 - Internal maintenance.
diameter of pipes.  B(SSFPDWL)R 34 - Control of the materials
 FS Code 2011 subsections C8 & E7 - for pipes.
Protection of openings for passage of pipes  B(SSFPDWL)R 26, 27, 31 & 32 - Internal

2
Current version Amendments
through fire barrier. diameter of pipes.
 PNAP APP-133 - Performance  FS Code 2011 subsections C8 & E7 -
requirements and standards of cast iron Protection of openings for passage of pipes
pipes. through fire barrier.
 Agreement from the IO, co-owners or  PNAP APP-133 - Performance
management office (if applicable) should requirements and standards of cast iron
be sought in case common part will be pipes.
affected.  Agreement from the IO, co-owners or
management office (if applicable) should
be sought in case common part will be
affected.

3.3.2 Underground drain 3.3.2 Underground drain

Other  B(SSFPDWL)R 40 & 41 - Proper disposal of Other  B(SSFPDWL)R 40 & 41 - Proper disposal of
considerations foul & surface water. considerations foul & surface water.
 B(SSFPDWL)R 73, PNAP APP-58 & PNRC 11  B(SSFPDWL)R 73, PNAP APP-58 & PNRC 11
- Testing of drainage works and procedure. - Testing of drainage works and procedure.
(1) (1)

 PNAP APP-103 - Not laying drainage on  PNAP APP-103 - Foundations Code 2017
newly reclaimed land. Differentiation Section 2.4 - Not laying drainage on newly

3
Current version Amendments
settlement for newly reclaimed land reclaimed land. Differentiation settlement
should be considered. (1) for newly reclaimed land should be
 MTRCL’s agreement should be obtained considered. (1)
before carrying out the excavation works in  MTRCL’s agreement should be obtained
Schedule Area 3 (Railway Protection Area). before carrying out the excavation works in
Section 27 of the Railways Ordinance, Cap Schedule Area 3 (Railway Protection Area).
519 or section 15 of the Mass Transit Section 27 of the Railways Ordinance, Cap
Railway (Land Resumption and Related 519 or section 15 of the Mass Transit
Provisions) Ordinance, Cap 276 will be Railway (Land Resumption and Related
invoked in case the proposed MW would Provisions) Ordinance, Cap 276 will be
be incompatible with any works for the invoked in case the proposed MW would
construction, Maintenance or be incompatible with any works for the
improvement of the railway or with the construction, Maintenance or
operation thereof. improvement of the railway or with the
 Agreement from the IO, co-owners or operation thereof.
management office (if applicable) should  Agreement from the IO, co-owners or
be sought in case common part will be management office (if applicable) should
affected. be sought in case common part will be
 Associated excavation may be MW item affected.
1.12 (1.5m < Depth ≤ 3m) or 2.11 (0.3m  Associated excavation may be MW item
< Depth ≤ 1.5m). 1.12 (1.5m < Depth ≤ 3m) or 2.11 (0.3m

4
Current version Amendments
< Depth ≤ 1.5m).
(1) For MW items 1.26 and 2.29 only.
(1) For MW items 1.26 and 2.29 only.
B(SSFPDWL)R represents Building (Standards of Sanitary Fitments,
Plumbing, Drainage Works and Latrines) Regulations; PNAP represents B(SSFPDWL)R represents Building (Standards of Sanitary Fitments, Plumbing,
Practice Notes for Authorized Persons, Registered Structural Engineers & Drainage Works and Latrines) Regulations; Foundations Code 2017
Registered Geotechnical Engineers; PNRC represents Practice Notes for represents Code of Practice for Foundations 2017; PNAP represents Practice
Registered Contractors. Notes for Authorized Persons, Registered Structural Engineers & Registered
Geotechnical Engineers; PNRC represents Practice Notes for Registered
Contractors.

3.15.2 Solid fence wall on-grade 3.15.2 Solid fence wall on-grade

Other  B(P)R 41 and FS Code 2011 subsection B5 - Other  B(P)R 41 and FS Code 2011 subsection B5 -
considerations General requirements of exit routes shall considerations General requirements of exit routes shall
be complied with. be complied with.
 B(P)R 30, 31 & 36 - No obstruction to  B(P)R 30, 31 & 36 - No obstruction to
windows providing natural lighting & windows providing natural lighting &
ventilation. ventilation.
 PNAP APP-103 - Not to construct fence  PNAP APP-103 - Foundations Code 2017
wall on newly reclaimed land. Section 2.4 - Not to construct fence wall on

5
Current version Amendments
 PNAP ADV-22 - Control of the felling or newly reclaimed land.
transplanting of trees.  PNAP ADV-22 - Control of the felling or
 Code of Practice for Avoidance of Damage transplanting of trees.
to Gas Pipes - Provision of precautionary  Code of Practice for Avoidance of Damage
measures against damage to gas pipes. to Gas Pipes - Provision of precautionary
 Stainless steel drilled-in anchors should measures against damage to gas pipes.
be used.  Stainless steel drilled-in anchors should
 Code of Practice on Working near be used.
Electricity Supply Lines - Provision of  Code of Practice on Working near
precautionary measures against damage of Electricity Supply Lines - Provision of
underground electricity supply cables. precautionary measures against damage of
 No fence wall > 1.1 m in height should be underground electricity supply cables.
constructed within horizontal clearance of  No fence wall > 1.1 m in height should be
500 mm from retractable awning (no constructed within horizontal clearance of
matter fully extended or retracted). 500 mm from retractable awning (no
 No fence wall should be erected within matter fully extended or retracted).
500 mm from trellis.  No fence wall should be erected within
 Associated excavation works may be MW 500 mm from trellis.
item 1.12 (1.5 m < Depth ≤ 3 m) or 2.11  Associated excavation works may be MW
(0.3 m < Depth ≤ 1.5 m). item 1.12 (1.5 m < Depth ≤ 3 m) or 2.11
 Associate spread footing construction may (0.3 m < Depth ≤ 1.5 m).

6
Current version Amendments
be MW Item 1.11 (Depth ≤ 3 m) or 2.10  Associate spread footing construction may
(Depth ≤ 1.5 m). be MW Item 1.11 (Depth ≤ 3 m) or 2.10
 Agreement from the IO, co-owners or (Depth ≤ 1.5 m).
management office (if applicable) should  Agreement from the IO, co-owners or
be sought in case common part will be management office (if applicable) should
affected. be sought in case common part will be
 Erection or alteration of fence walls ≤ 1.1 affected.
m in height on-grade may be DEW item 5.  Erection or alteration of fence walls ≤ 1.1
For details, please refer to descriptions of m in height on-grade may be DEW item 5.
the relevant DEW item. For details, please refer to descriptions of
the relevant DEW item.
B(P)R represents Building (Planning) Regulations; B(C)R represents
Building (Construction) Regulations; FS Code 2011 represents Code of B(P)R represents Building (Planning) Regulations; B(C)R represents Building
Practice for Fire Safety in Buildings 2011; PNAP represents Practice Notes (Construction) Regulations; FS Code 2011 represents Code of Practice for
for Authorized Persons, Registered Structural Engineers and Registered Fire Safety in Buildings 2011; Foundations Code 2017 represents Code of
Geotechnical Engineers; PNRC represents Practice Notes for Registered Practice for Foundations 2017; PNAP represents Practice Notes for
Contractors; DEW represents designated exempted works. Authorized Persons, Registered Structural Engineers and Registered
Geotechnical Engineers; PNRC represents Practice Notes for Registered
Contractors; DEW represents designated exempted works

7
Current version Amendments
3.24.1 Sub-division of flat 3.24.1 Sub-division of flat

Other  B(P)R 30, 31 & 36 - No obstruction to Other  B(P)R 30, 31 & 36 - No obstruction to
considerations windows providing natural lighting & considerations windows providing natural lighting &
ventilation. ventilation.
*See  B(P)R 41 & FS Code 2011 subsections B5, *See  B(P)R 41 & FS Code 2011 subsections B5,
subsection B7, B8, B10 & B13 - Control of minimum subsection B7, B8, B10 & B13 - Control of minimum
3.32 number & width of exit routes or exit 3.32 number & width of exit routes or exit
doors and relevant requirements. doors and relevant requirements.
 B(P)R 41A, 41B, 41C & 41D & FS Code 2011  B(P)R 41A, 41B, 41C & 41D & FS Code 2011
Code Clause D8.4-No part of the floor Code Clause D8.4-No part of the floor
served by firemen’s lift should be more served by firemen’s lift should be more
than 60 m from the door of the lift lobby than 60 m from the door of the lift lobby
measured along actual passages. measured along actual passages.
 B(C)R 35 & FS Code 2011 subsections C6 to  B(C)R 35 & FS Code 2011 subsections C6 to
C7, E4 to E9 - Requirements of fire resisting C7, E4 to E9 - Requirements of fire resisting
construction. construction.
 B(C)R Part 3 & Loading Code 2011 -  B(C)R Part 3 & Loading Code 2011 -
Requirements for the design of loads and Requirements for the design of loads and
the minimum imposed load for checking the minimum imposed load for checking
the structural adequacy of the existing the structural adequacy of the existing

8
Current version Amendments
slab. slab.
 B(P) R 45 - Provision of Kitchen.  B(P) R 45 - Provision of Kitchen.
 B(P)R 35A - Provision for flue aperture for  B(P)R 35A - Provision for flue aperture for
gas water heater. gas water heater.
 B(SSFPDWL)R 11 - Proper disposal of soil.  B(SSFPDWL)R 11 - Proper disposal of soil.
 B(SSFPDWL)R 24, 25 & 30 - Provision of  B(SSFPDWL)R 24, 25 & 30 and PNAP APP-
traps for soil & waste fitment and anti- 164 - Provision of traps for soil & waste
syphonage pipe. fitment and anti-syphonage pipe.
 B(SSFPDWL)R 28 - Control of bends in soil  B(SSFPDWL)R 28 - Control of bends in soil
& waste pipes. & waste pipes.
 B(SSFPDWL)R 34 - Control of the materials  B(SSFPDWL)R 34 - Control of the materials
for pipes. for pipes.
 B(SSFPDWL) R 31 - Ventilation pipe carry  B(SSFPDWL) R 31 - Ventilation pipe carry
up to a height > 1 m above roof. up to a height > 1 m above roof and
 BFA Code 2008 - Barrier Free Access should considering to increase the height to 3 m
not be affected. above an accessible roof as recommended
 PNAP APP-86 - Design & construction of in PNAP APP-164.
non-loadbearing partition walls.  BFA Code 2008 - Barrier Free Access should
 PNAP APP-133 - Using cast iron pipes of not be affected.
acceptable performance requirements /  PNAP APP-86 - Design & construction of
standards. non-loadbearing partition walls.

9
Current version Amendments
 Agreement from the IO, co-owners or  PNAP APP-133 - Using cast iron pipes of
management office (if applicable) should acceptable performance requirements /
be sought in case common part will be standards.
affected.  Agreement from the IO, co-owners or
management office (if applicable) should
be sought in case common part will be
affected.